What's new

No Electricity since morning (Welcome PAKISTAN)

Can some body tell me how much proper electrical and power consume in Pakistan? and, how much Pakistan produce electricity and power? How much shortfall if we do comparison?

Thankss
Electricity – total installed capacity: 19,505 MW (2007)
fossil fuel – 12,580 MW – 65% of total
hydro – 6,463 MW – 33% of total
nuclear – 462 MW – 2% of total

Current demand 13,000 MW
Current production 7,000 MW
Shortfall 6,000 MW

LAHORE: Urban centres endured 18 hours of loadshedding and rural areas virtually remained without electricity after a series of crises hit the power sector over the past two days with generation declining to below 7,000MW against a demand of over 13,000MW.

As if that were not enough, power planners in private conversation conceded that the ground reality was even worse than what the statistics suggested. Officially, the demand and supply gap stood at 60 per cent, but consumers in areas covered by the government utilities were getting only 20pc of the required supply because of various reasons.

“Out of 7,000MW, about 700MW goes to the Karachi Electric Supply Company, reducing the national supply by another 10pc,” said an
official of the National Transmission and Dispatch Company.

The supply dropped to 4,500MW after 25pc of the electricity was lost by way of lines losses, theft and transmission inefficiency. Exemptions given to hospitals, the VVIPs (Prime Minister and President Houses) and the defence sector took away another 1,500MW, leaving the net available electricity to the rest of the consumers at 3,000MW.

“These factors led to 18 hours of loadshedding in urban areas and virtually no supply to the quiet rural areas over the past 48 hours,” the official said, adding: “The power sector is on clinical support system and another contingency can lead to total collapse.”

Uch Power (550MW), Habibullah Coastal (125MW) and Sheikh Manda (25MW) were out of the system for the past 36 hours after acts of sabotage damaged gas pipelines feeding their plants, said an official of the Pakistan Electric Power Company (Pepco).

Another 700MW went out of the generation tally because of disruption in oil supply to AES Lal Pir and Pak-Gen on Saturday, he added.

Water releases from Tarbela and Mangla dams were reduced from 35,000 and 25,000 cusecs, respectively, to 22,000 and 20,000 cusecs – which translated into a loss of another 600MW of electricity.

The oil supply fell to 1,600 tonnes against the minimum requirement of 25,000 tonnes.

The caretaker set-up apparently believes administrative reshuffles are enough to take care of the power sector problems and is only focusing on that. “The generation side is still to appear on its mental radar. Till then one can only hope for the best,” the official said.

“It is not the power sector alone, the overall crisis goes much deeper,” said a former managing director of Pepco.

The former MD, who requested anonymity, said the energy sector had been warning the quarters concerned for several months that its installations could come under attack, but no safety measures were taken.

Over the past one week, terrorists attacked four installations, including a 220kv grid station. Four gas pipelines were destroyed over the fortnight, affecting power generation.

“One needs to ask the interior ministry what measures it has taken to protect the power sector installations. The sector is thus in double jeopardy: the dropping generation because of oil, gas and water shortages, and regular attacks on its installations,” he said, calling the problem a national crisis.
http://dawn.com/2013/04/08/shortfall-rises-to-6000mw-urban-areas-suffer-18-hours-of-loadshedding-2/
 
.
Shortfall of 6,000 MW is peanuts a couple of power plants can do the needful, in India Maharashtra alone had a power shortage of 5,000 MW few years back
 
.
Situation is bad here too ..small towns and villages of karnataka are facing almost 12 hours of power cut ..
 
.
Electricity – total installed capacity: 19,505 MW (2007)
fossil fuel – 12,580 MW – 65% of total
hydro – 6,463 MW – 33% of total
nuclear – 462 MW – 2% of total

Current demand 13,000 MW
Current production 7,000 MW
Shortfall 6,000 MW

the production of 13 Gigawatts from fossil fuel seems criminal-----gien the price of fossil fuel--why dont they install a few nuclear electricity plants?????

Shortfall of 6,000 MW is peanuts a couple of power plants can do the needful, in India Maharashtra alone had a power shortage of 5,000 MW few years back

so how did thye deal with it?
 
.
the production of 13 Gigawatts from fossil fuel seems criminal-----gien the price of fossil fuel--why dont they install a few nuclear electricity plants?????

That's separate debate - but point is with installed capacity of 20K MW, we can't fulfill demand of 13K MW

Shortfall of 6,000 MW is peanuts a couple of power plants can do the needful, in India Maharashtra alone had a power shortage of 5,000 MW few years back

With current installed capacity, we shouldn't have any shortage even with 25% line losses (which is again too high)
 
.
the production of 13 Gigawatts from fossil fuel seems criminal-----gien the price of fossil fuel--why dont they install a few nuclear electricity plants?????



so how did thye deal with it?

Some time ago I read a thread about huge coal fields in Thar. Why not go for Thermal power plants that gets Installed in less times than Hydro plants.
 
.
I second this, I left my home in rwp last night 1am, there was no electricity there till morning, when I got to lahore in the morning and there was no electricity,, I just hot hotel, and there is no electricity

Are u enjoying ? :whistle: :whistle:
 
. . .
mere say poch lay, koe hal nahi hai.... subha ki sirf 3 hour light aye hai... :angry:

best of luck for elections. .
agar pti ke jeetne ke baad, koi aisi complain aayi to yahaan pdf par sab aap ko blame karenge. :P
 
.
whats new we had faced it many times. turn for lahories and pindi/islamabad people to feel it as well
 
.
Governments forecast demand for decades ahead and plan for it. In Pakistan we announce our current shortfall and do nothing about it.
 
.
Here is the load shedding schedule in Lahore since 12 A.M today.

Light went out 2 AM - 6 AM

Light went out 8 AM-10 AM

Light went out 11 AM - 4 PM

Light went out 5 PM - 6 PM

Light Again went out at 7.30 PM

I can't believe that? just 5 :30hours power supply... man that is horrible for any human.... why didn't GoP taking any action... to overcome? is there any option avail for pak?

your power demand is very low, it can be take care easily... why Pak not taking it seriously? huh bad politicians....
 
.
Hmmm...Now that's the real meaning of, "theri batti band"!! :omghaha:
 
.
the production of 13 Gigawatts from fossil fuel seems criminal-----gien the price of fossil fuel--why dont they install a few nuclear electricity plants?????



so how did thye deal with it?

go through the link Power Sector at a Glance ALL INDIA

1.Total Installed Capacity:

Power for All by 2013

Sector MW %age
State Sector 86,343.35 40.77

Central Sector 62,963.63 29.73

Private Sector 62,459.24 29.49

Total 2,11,766.22
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom