Does anybody know whats on the jf-17 production line these days, supposedly 50 pieces of block-II rolled off by 2017 year end. Is the production line empty?
 
Block 2 will continue to fill the gap between II and iii upgrade does not constitute production plus upgrade is mostly plug and play type environmental system and avionics plus software
 
If you go by replacements sqn so 2 a5, 4 f7p, 3 f7pg and 6 mirage Sqn that 15 sqn average 18 per sqn plus 2 for attrition replacement ie 20 per sqn 20x15 is the requirement for paf

That was the reason Jf program was launched w/o plaaf as paf plus 100 -150 other buyers expected

Time will tell if jf or something else will replace some or all
 
If you go by replacements sqn so 2 a5, 4 f7p, 3 f7pg and 6 mirage Sqn that 15 sqn average 18 per sqn plus 2 for attrition replacement ie 20 per sqn 20x15 is the requirement for paf

That was the reason Jf program was launched w/o plaaf as paf plus 100 -150 other buyers expected

Time will tell if jf or something else will replace some or all
I concur, the final number is closer to 300 with all replacements and extras.
 
No, the decision is with either a variant of the J-31 or an airframe Chendgu has in mind.

Pakistan has pretty strong relationships with the team at Chengdu so it could very well be this mystery airframe.
It could very likely be a mysterious clean sheet. Just saying
 
No, the decision is with either a variant of the J-31 or an airframe Chendgu has in mind.

Pakistan has pretty strong relationships with the team at Chengdu so it could very well be this mystery airframe.
Any chance they might look at 2~3 squadrons of off-the-shelf FC-31 as a stopgap for Azm? It could make for a good option for replacing the Mirage III/5 in the strike and maritime roles.
 
Any chance they might look at 2~3 squadrons of off-the-shelf FC-31 as a stopgap for Azm? It could make for a good option for replacing the Mirage III/5 in the strike and maritime roles.
Bilal it would be possible yet don't you think the off the shelf would be too expensive to maintain ? Rather wait a couple of years under nuclear protection to buy extra 4-5 local Azm squadrons
 
Bilal it would be possible yet don't you think the off the shelf would be too expensive to maintain ? Rather wait a couple of years under nuclear protection to buy extra 4-5 local Azm squadrons
project azm is atleast 10 years and likely 12-15 years from serial production
juts look at thunder time frame for reference
 