What's new

JF-17 Thunder Multirole Fighter [Thread 7]

Does anybody know whats on the jf-17 production line these days, supposedly 50 pieces of block-II rolled off by 2017 year end. Is the production line empty?
 
. .
Block 2 will continue to fill the gap between II and iii upgrade does not constitute production plus upgrade is mostly plug and play type environmental system and avionics plus software
 
. . . .
If you go by replacements sqn so 2 a5, 4 f7p, 3 f7pg and 6 mirage Sqn that 15 sqn average 18 per sqn plus 2 for attrition replacement ie 20 per sqn 20x15 is the requirement for paf

That was the reason Jf program was launched w/o plaaf as paf plus 100 -150 other buyers expected

Time will tell if jf or something else will replace some or all
 
.
If you go by replacements sqn so 2 a5, 4 f7p, 3 f7pg and 6 mirage Sqn that 15 sqn average 18 per sqn plus 2 for attrition replacement ie 20 per sqn 20x15 is the requirement for paf

That was the reason Jf program was launched w/o plaaf as paf plus 100 -150 other buyers expected

Time will tell if jf or something else will replace some or all
I concur, the final number is closer to 300 with all replacements and extras.
 
. . . .
No, the decision is with either a variant of the J-31 or an airframe Chendgu has in mind.

Pakistan has pretty strong relationships with the team at Chengdu so it could very well be this mystery airframe.
It could very likely be a mysterious clean sheet. Just saying
 
.
No, the decision is with either a variant of the J-31 or an airframe Chendgu has in mind.

Pakistan has pretty strong relationships with the team at Chengdu so it could very well be this mystery airframe.
Any chance they might look at 2~3 squadrons of off-the-shelf FC-31 as a stopgap for Azm? It could make for a good option for replacing the Mirage III/5 in the strike and maritime roles.
 
.
Any chance they might look at 2~3 squadrons of off-the-shelf FC-31 as a stopgap for Azm? It could make for a good option for replacing the Mirage III/5 in the strike and maritime roles.
Bilal it would be possible yet don't you think the off the shelf would be too expensive to maintain ? Rather wait a couple of years under nuclear protection to buy extra 4-5 local Azm squadrons
 
.
Bilal it would be possible yet don't you think the off the shelf would be too expensive to maintain ? Rather wait a couple of years under nuclear protection to buy extra 4-5 local Azm squadrons
project azm is atleast 10 years and likely 12-15 years from serial production
juts look at thunder time frame for reference
 
.

Country Latest Posts

Back
Top Bottom