What's new

Altay & Turkish Main Battle Tank Programs

Addition of extra weight on tarret without modification of power to turn tarret you get slowness of tarret which very inferior for tanks

Don't be an back chair Internet engineer, Im sure they know more than you and I..

It seems like you don't have the technology to build a tank from scratch. You still need an engine for example. In the meantime upgrading older tanks to offer better protection for your troops is a good stopgap.

You are correct, there are issues surrounding mass supply of subsystems from within Turkey and outside..But, some like to play all knowing and attach it to current government..
 
Don't be an back chair Internet engineer, Im sure they know more than you and I..



You are correct, there are issues surrounding mass supply of subsystems from within Turkey and outside..But, some like to play all knowing and attach it to current government..
I sure, cuz I know, the same has been said about ATAK, TB2, ANKA, KÜRKUS and all other wondefull toys but all of them perform so good and TR is thanks to that hardware much safer than it was before! SO TR go forward, produce that tank and all other presented weapons and don't care about what those selfcalled internet "experts" say about. Can't wait to see them in the future.
 
It seems like you don't have the technology to build a tank from scratch. You still need an engine for example. In the meantime upgrading older tanks to offer better protection for your troops is a good stopgap.
There was no problem with the engines for the first batch of 250 units,deal made with MTU Germany so the reason for not starting is politics.
All the excuses used by fanboys are just big BS.
 
Don't be an back chair Internet engineer, Im sure they know more than you and I..



You are correct, there are issues surrounding mass supply of subsystems from within Turkey and outside..But, some like to play all knowing and attach it to current government..
its not good behaviour to blame someone just answer on science matter,I am not engineer but I have an academic title and experience
 
Altay tanki seri uretim sozlesmesinin yarin imzalanmasi bekleniyor. Yapilan aciklamalara istinaden, isin 250 adet tank uretimini kapsamasi ve hattan ilk tankin sozlesmenin yururluge girmesinden 18 ay sonra cikmasi beklenmekte. Kaynak: @C4Defence / http://c4news.me/vzT31

Translated from Turkish by Microsoft
Altay Tank serial production contract is expected to be signed tomorrow. According to the description, the Isin 250 units of the tank, and the first of the line to enter the contract is expected 18 months after entering the dormitory. Source: @C4Defence/ http://c4news.me/vzT31

DrZWB9pX4AAFEgn.jpg
 
Translated from Turkish by Microsoft
Altay Tank serial production contract is expected to be signed tomorrow. According to the description, the Isin 250 units of the tank, and the first of the line to enter the contract is expected 18 months after entering the dormitory. Source: @C4Defence/ http://c4news.me/vzT31

Minor corrections on the translation ;

Altay Tank serial production contract is expected to be signed tomorrow. According to the announcement, the workload consists of the production of 250 units of the tank, and the first tank to come off the product line is expected to be 18 months after the contract is valid. Source: @C4Defence/ http://c4news.me/vzT31
 
Back
Top Bottom