Maybe you are right but as an outsider (with limited view) it seems, with current pace, Turkey will get independence on other things before 2030 but turkey won't be in comfortable position before 2035-40 regarding engine tech. I again says it just my personal view and I am not an expert but a common observer.
2040 ?
Turkiye will be in comfortable position in the next 10 years ( 2023-2033 ) regarding Engine technology
Turkish Engine Projects
400 hp BMC TUNA Engine to power Multi-Purpose Armored Vehicles
the first 20 TUNA engines were delivered
600 hp BMC AZRA Diesel Engine
Integration of 20 AZRA diesel engines into BMC's ALTUG 8x8 armored personnel carrier and TUGRA tank carrier vehicles was successfully carried out
1.000 hp BMC UTKU Engine to power T-155 STORM-II Howitzer
1.500 hp BMC BATU Engine to power ALTAY Tank
Turbojet Engines to power Cruise Missiles
-- KTJ-1750 Turbojet Engine to power CAKIR Cruise Missile
-- KTJ-3200 Turbojet Engine to power SOM and ATMACA Cruise Missiles
-- KTJ-3700 Turbojet Engine to power KARA-ATMACA Cruise Missile
-- ARAT Turbojet Engine to power GEZGIN strategic Cruise Missile
TEI PG-50 and TEI TJ-90 Engine to power Kamikaze Drones
TEI PD-170 annd TEI PD-222 Aviation Engines to power TB-3 , ANKA and AKSUNGUR UCAVs
Hybrid Rocket Engine and Liquid propellant Rocket Engine technologies for Turkish Space Program
Turboshaft Engine technology to power Helicopters
TEI TS-1400 Turboshaft Engine to power T-625 Utility Helicopter and T-629 Attack Helicopter
T-625 Helicopter made the first flight with TEI TS-1400 turboshaft Engine
mass production start after 2024
also TEI to convert 3.000 shp turboshaft Engine from its core Engine ( TF-6.000 turbofan) to power the T-925 Utility Helicopter and T-929 Attack Helicopter
Turbofan Engine technology to power KIZILELMA , ANKA-3 and KAAN
TEI TF-6.000 Turbofan Engine will be ignited in 2023
6.000 lbf TEI-TF6000 is a small sized warcraft engine to power KIZILELMA and ANKA-3 unmanned Fighter Jets
10.000 lbf TF-10.000 turbofan Engine
According to TAI and TEI
in 2021 TEI and TR-MOTOR have started developing 35.000 lbf turbofan Engine to power the KAAN 5th gen Fighter Jet
35.000 lbf turbofan Engine development studies continues for 2 years and we will see the first prototype for test flights in 2028
in 2018 , The Presidency of Defense Industries , TR-MOTOR and TAI have signed turbofan engine development program contract