Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
May I request the link for this?The national helicopter engine is preparing for the first flight
Reaching 1570 horsepower with the TEI-TS1400 engine developed for helicopters, TEI brings forward the delivery date of the engine that will make the first flight.
Goksel Yildirim |29.05.2022
PHOTO: Mustafa Ciftci/AA
Baku
Turkey's aviation engines center TUSAŞ Engine Industries AŞ (TEI) is preparing to deliver the TEI-TS1400 turboshaft engine, developed to power national helicopters, earlier than planned.
TEI is in Baku Crystal Hall and Seaside Boulevard National Park with the support of important institutions and companies of the country, under the execution of the Turkish Technology Team Foundation (T3 Foundation), the Ministry of Digital Development and Transport of Azerbaijan and the Ministry of Industry and Technology of the Republic of Turkey, where Anadolu Agency is the Global Communication Partner. exhibited the engines produced and developed in different classes at TEKNOFEST Azerbaijan.
Mahmut Faruk Akşit, Chairman and General Manager of TEI, told Anadolu Agency (AA) that the first prototype of the helicopter engine TS1400 was delivered to TAI about 1-1.5 years ago, in a ceremony attended by President Recep Tayyip Erdoğan, to start the helicopter integration studies. said they did.
Explaining that they produced other prototypes from this engine and put them through very different tests, Akşit said that the difficulty level of these tests was increasing gradually.
Passed competitor imported engine
Akşit stated that these tests were carried out to prove the maturity of the engine for manned flight and for certification, and noted that the name was determined as TS1400 since the maximum power that the engine will continuously produce is 1400 horsepower.
Stating that they designed an engine that can produce 1470 horsepower during take-off, Akşit said:
"These values are about 100 hp higher than the competitor's current imported engine. We have increased our engine to 1570 hp, or even above it. There is an emergency take-off scenario in case it has to be overloaded for certification and qualification. Normally, the engine is designed at a maximum continuous power level of 1400 hp. even though it can be run to produce 1570 horsepower for 2 minutes and we need to show it to the certification authority. As of now, we have exceeded this power level, and we can run it at 1570 horsepower for much longer periods, not 2 minutes. This is a nice turning point. We will push it. We will announce the developments as the tests are done."
"Our President has cornered us"
Akşit shared the dialogue between the President of the Presidency of Defense Industries, İsmail Demir, and the TS1400 engine, and said:
"Our president cornered us by saying 'Give this as soon as possible'. We are already a little ahead of the normal project plan and we are pushing our team. Our goal was to perform the first manned flight before the end of next year by obtaining the authorization from the General Directorate of Civil Aviation. Our President forced us to give it by the end of the year. "We promised to deliver an engine for the first flight at the end of this year or the beginning of next year. I hope we will do our best to deliver on that promise. Internally we have pushed this program a little further."
May I request the link for this?
Thank you very much!Milli helikopter motoru ilk uçuşa hazırlanıyor
Helikopterler için geliştirilen TEI-TS1400 motoruyla 1570 beygire ulaşan TEI, ilk uçuşu yapacak motorun teslim tarihini öne çekiyor. - Anadolu Ajansıwww.aa.com.tr
1 day they will meet Pakistan army....
Joint production move for T625 GÖKBEY from Malaysia
As reported by OANA News, Malaysia will jointly manufacture the T625 GÖKBEY utility helicopter with Turkey in the “Aviation Valley” (NSAV) to be opened in Negeri Sembilan state in order to develop the aviation industry.
Mohamad Rafie Ab Malek, Minister of State of Malaysia Negeri Sembilan State , said, "We have received approval from TAI for the production of helicopters in Malaysia Vision Valley 2.0" regarding the joint production with TAI . Mohamad Rafie Ab Malek added that negotiations with South Korean KAI for fixed-wing platforms and UAVs are ongoing.
Negotiations on the production of GÖKBEY in Malaysia had been going on for some time; In the news in Defense Security Asia, TAI General Manager Prof. Dr. Temel Kotil stated that TAI is ready for the establishment of production facilities for the T625 GÖKBEY.
GÖKBEY Helicopter delivery process continues to Gendarmerie
President of Defense Industry Prof. Dr. İsmail Demir announced in the Weekend program with Hakan Çelik that the domestic engine developed by TEI will be integrated into the GÖKBEY Helicopter this year. Demir made the following statement: “GÖKBEY's delivery to the gendarmerie was delayed a bit. 3 GÖKBEY Helicopters will be delivered this year. This year, we are integrating and flying the domestic engine developed by TEI.”
TAI General Manager Prof. Dr. Temel Kotil hosted members of the press and researchers at TAI facilities. At the meeting, which Defense Turk also attended, Kotil announced that 3 T625 GÖKBEY general purpose helicopters would be delivered to the Gendarmerie.
Within the scope of the developing cooperation with TAI Malaysia, it also signed a contract with the Malaysian Industry Government Group for High Technology (MIGHT) covering human resources and talent development and coordination of mutual R&D activities with 10 Malaysian Universities.
Malezya'dan T625 GÖKBEY için ortak üretim hamlesi
Malezya, Negeri Sembilan eyaletinde açacağı "Havacılık Vadisi'nde" T625 GÖKBEY helikopterinin ortak üretimini yapmayı planlıyor.www.defenceturk.net