ANMDT
ELITE MEMBER
- Joined
- Feb 9, 2014
- Messages
- 1,278
- Reaction score
- 10
- Country
- Location
Indigeneously developed machinery automatic control system
As its indicated by an official from ASELSAN its decided to integrate national control system for propulsion devices/engines on 5th and 6th (so later on) milgem. For ships between 1-4 control system supplied by MTU , which is also main supplier for propulsion section.With this projects , engines only will be mechanical parts importer, with indigeneous electronics integrated on them, will grant assurance of security for these engines.
Its a critical system for ship , since generators, auxillary machinery , propeller blades and engine managed by this control softwarer/device . After this section developed by indigeneous sources, it will be able to apply this to early built ships and other ships as well.
Dynamic Positioning System
ASELSAN plans to work on DP system, which is most critical section for Oil Rigs ,it should be noted Turkey plans to develop oil rig for national purposes, tensions with cyprus and hesitate of foreigner companies to supply equipment which will work on issued areas. Solid steps will be taken in following year for design of oil rig, as well as DP system for this rig and some other Navy ships like mine hunters. Beside naval and oil rig application, this is a system supplied in world only by a few companies, such as rolls-royce ,konsberg (and some more). Also has a exclusive market .
Design studies on Test/Qualification and training ship
Aselsan collaborates with İTÜ to develop a ship which will be test bed for their equipments, classifications of equipments and training of staff . Also operation of ship mainly will be shared to İTÜ and then chartered for private companies which desires to test their naval equipments on a real on-going ship.
This ship will ease test program of ASELSAN, since untill now they had to use fisheries or some navy ships(which are under construction or tests) for testing their equipments with time and data sensivity. With this project , ASELSAN will receive a flexibility for testing equpiments. Additionally DP system project will be considered to apply on this ship.
Additionally this ship will be employed for short distance search/rescue operations, or natural disaster supports will be under responsibilty of AFAD.
Planned to launch ship at 27 Sept 2016 and commission in mids of 2017
As its indicated by an official from ASELSAN its decided to integrate national control system for propulsion devices/engines on 5th and 6th (so later on) milgem. For ships between 1-4 control system supplied by MTU , which is also main supplier for propulsion section.With this projects , engines only will be mechanical parts importer, with indigeneous electronics integrated on them, will grant assurance of security for these engines.
Its a critical system for ship , since generators, auxillary machinery , propeller blades and engine managed by this control softwarer/device . After this section developed by indigeneous sources, it will be able to apply this to early built ships and other ships as well.
Dynamic Positioning System
ASELSAN plans to work on DP system, which is most critical section for Oil Rigs ,it should be noted Turkey plans to develop oil rig for national purposes, tensions with cyprus and hesitate of foreigner companies to supply equipment which will work on issued areas. Solid steps will be taken in following year for design of oil rig, as well as DP system for this rig and some other Navy ships like mine hunters. Beside naval and oil rig application, this is a system supplied in world only by a few companies, such as rolls-royce ,konsberg (and some more). Also has a exclusive market .
Design studies on Test/Qualification and training ship
Aselsan collaborates with İTÜ to develop a ship which will be test bed for their equipments, classifications of equipments and training of staff . Also operation of ship mainly will be shared to İTÜ and then chartered for private companies which desires to test their naval equipments on a real on-going ship.
This ship will ease test program of ASELSAN, since untill now they had to use fisheries or some navy ships(which are under construction or tests) for testing their equipments with time and data sensivity. With this project , ASELSAN will receive a flexibility for testing equpiments. Additionally DP system project will be considered to apply on this ship.
Additionally this ship will be employed for short distance search/rescue operations, or natural disaster supports will be under responsibilty of AFAD.
Planned to launch ship at 27 Sept 2016 and commission in mids of 2017
Last edited: