8 ( 4 ,and +4 upgraded as TF100) ada class is planned, seems like first 4 ships will be nearly same design with minor changes. Steel cut for 3rd and so far i heard 4th have done, its planned to use indigeneous propulsion control system for 4th as testbed,and apply it in 5th and 6th.
For TF2000 , preliminary and concept design shaped ,4 is planned (or officially 2). Some preliminary engineering calculations and integrated systems are still in consideration.
For TF100 ,it will be seen after 3-4th ada class is launched next year ,they ll begin to talk about this,and held tenders.
For LST , steel cut has done a while ago ,but ADİK has not uploaded recent pictures of building . Maybe its not in erection progress right now , usually they uploaded medias during built of LCT.
For LPD, navantia began to work on design ,for applying changes while SEDEF prepares the background.
We have lots of it, even no need to post in here
. Beside navy,we have a lot of drydocks /both floating and stone built, in commercial shipyards.
It doesnt seem a place for major equipment , maybe they ll just put some minor equipment like receivers ,or some other things like for communication and etc. The area is just seems big because they need to put radar near to middle,and upper structure extended to front a little bit.
It would be good if they use one more 127 mm on front in the next versions of ship, i ll like it .