What's new

More LCA Tejas For The IAF: $5.2 Billion Deal For Mark 1A Variant To Be Signed By December,

MK1A

Supa Dupa plane that has not left drawing board

JF-17

135 produced so far.

In service with 9 PAF squadrons
Nigerian Air Force
Myanmar Air Force


l

your suppose to have 130.in service it's been 11 years since you inducted the first one.
that's only 12 a year

your block 3 is taking 4 years to deliver 2025

we built 170 su30 mki in India in 12 years so no big deal and brought 100 from.russia

tejas entered service 4 years ago
and on one assembly 'line
and we have 20 in service
second is up.and we build next 20.in 3 years,easy
after this 3rd assembly built we deliver 16 tejas mark1a per year by 2028 or 2029.
that 123 tejas in 12 or 13 years,

almost identical.to thunders but slower than su30mki.

we have no problem.in delivery
we deliver 300 dhruv helicopters,in ten years
we built 15 warships in 15 years,
it's called production scaling up
 
your suppose to have 130.in service it's been 11 years since you inducted the first one.
that's only 12 a year

your block 3 is taking 4 years to deliver 2025

we built 170 su30 mki in India in 12 years so no big deal and brought 100 from.russia

tejas entered service 4 years ago
and on one assembly 'line
and we have 20 in service
second is up.and we build next 20.in 3 years,easy
after this 3rd assembly built we deliver 16 tejas mark1a per year by 2028 or 2029.
that 123 tejas in 12 or 13 years,

almost identical.to thunders but slower than su30mki.

we have no problem.in delivery
we deliver 300 dhruv helicopters,in ten years
we built 15 warships in 15 years,
it's called production scaling up

Type all you like, best to make comparisons when MK1A actually exists no?

As ever, you prenote everything with "we will", while PAF can say "we have".
 
OH BHAI block-3 production officially is already started on Dec 30 2020 , if you would like to go block-3 thread here on PDF

yes I know 12 block 3 thunders per year 2025 all over the internet
Type all you like, best to make comparisons when MK1A actually exists no?

As ever, you prenote everything with "we will", while PAF can say "we have".

a little bit like
yes we have Rafale now
or yes we have mark 1 tejas now
yes,we 270 su30mki now

and we will have
more,Rafale
83 tejas mark1a
and 5 regiments of s400
and yes the,deals are cleared,
 
yes I know 12 block 3 thunders per year 2025 all over the internet
Not in 2025 but already started its production, in 2025 we will end the production of block-3, block-3 project was started in 2017, and as your MK1A project started in 2018/19 it will reach the production status most probably in 2023/24
 
Not in 2025 but already started its production, in 2025 we will end the production of block-3, block-3 project was started in 2017, and as your MK1A project started in 2018/19 it will reach the production status most probably in 2023/24
do they have this so called 1a version prototype rdy yet?
 
Does that mean single engine foreign air craft requirement tender is closed... MRCA?

For the cabinet decision, good choice.
 
They need to have it now to be able to meet the 23/24 deadline, improved block also needs a several years test flight.
but they are superpower they don't need testing, and they are saying that they have operational Tejas MK1 they install AESA and other latest avionics of MK-1A to MK-1 and current MK-1 will become MK-1A
 
Does that mean single engine foreign air craft requirement tender is closed... MRCA?

For the cabinet decision, good choice.

It is a dead case now.

Only BJP government could possibly go ahead but now they are preferring and promoting to HAL TejasMk1a and Mk2 and other one is Rafale.
 
but they are superpower they don't need testing, and they are saying that they have operational Tejas MK1 they install AESA and other latest avionics of MK-1A to MK-1 and current MK-1 will become MK-1A

Testing only will take 1-2 years. ASEA is already tested with Prototype of HAL Tejas and Jaguar fighter.
  • A more powerful engine - the GE414 instead of the GE404, capable of nearly 20% higher dry thrust ( 58 kN vs 48 kN)
  • A more advanced AESA radar (ASEA vs ELTA 2023)
  • A more comprehensive electronic warfare suite with Radar Warning Receiver (RWR), Missile Approach warning (MAW), Laser Warning Receiver (LWR), Self Protection Jammer (SPJ), ECM & IRST suites
  • Ability to launch Astra1 and Astra 2 and other long range missiles
  • Dual carriage pylons, for carrying more than one armament per rail
  • Several structural & internal improvements for better maintainability
  • Better Flight Control Computer with PowerPC based processor
  • Improved aerial refueling probe
 
Back
Top Bottom