What's new

Blackout in Pakistan

Why do Pakistanis blame PMLN for this? Pakistan set itself on a destructive path from the time it made India it's arch-rival.

Power is back on. Please turn off your t rolling switch. #stupid
 
.
Qasam se pehla qayal mujhay yahi aya tha k hamesha ki terhan hyderabad blast ka ilzam pak pe na lagadiya gaya ho,aur is natijay mai India ne attack na kerdiya ho,jab mai namaz perh raha tha,mardood shaitan ne aisay was-waas ul qannas dalay hain k bus:omghaha:
 
. . . .
INDIANS ---- Invade PDF.

Hamlaaaaaaaaaaaaaaa. :devil:

4647250.gif
 
.
Does it really seem to be a conspiracy theory?


US army has started preparations to land US forces in Karachi. This is NO joke!!! As Pakistan starts to collapse, the US army is aggressively building a Command and Control Center (TCOC) at Karachi airport to act as the forward base to seize and control the airport for US troops landings.

Of course, the cover story is that the entire might of the US army is being deployed for anti-narcotics operations, as if we are all idiots here. US Marine Corp has also been practicing landing of Marine amphibians divisions on Makran coast just a few years back - again under the drama of anti-drug operations.

Once the anarchy gets out of control in Karachi, a local political party would facilitate US military landing, just as NATO did in Libya. The last phase of the 5thGW being deployed aggressively. For years, we had been warning the nation but those destined for punishment seldom do tauba.



https://www.fbo.gov/index?s=opportunity&mode=form&id=a4d5d575585008238636c897fefa1ac1&tab=core&_cview=0
Tactical Command And Operations Center (TCOC) And Guard Shacks At Jinnah International Airport, Karachi, Pakistan

Solicitation Number: W912ER13R0016
Agency: Department of the Army
Office: U.S. Army Corps of Engineers
Location: USACE Middle East District

GENERAL INFORMATION
Notice Type: Presolicitation
Posted Date: February 19, 2013
Response Date: March 6, 2013
Archiving Policy: Automatic, on specified date
Archive Date: April 20, 2013
Original Set Aside: N/A
Set Aside: N/A
Classification Code: Y -- Construction of structures and facilities
NAICS Code: 236 -- Construction of Buildings/236220 -- Commercial and Institutional Building Construction
Notice Type: Pre-solicitation

Synopsis: Feb 19, 2013 7:32 am

The U.S. Army Corps of Engineers (USACE) Middle East District intends to solicit a Request for Proposal (RFP) W912ER-13-R-0016 to construction firms or Joint Ventures (JV) experienced in working in the Middle East region who are interested in submitting a proposal for the Design and Build of a Tactical Command and Operations Center (TCOC) compound at the Jinnah International Airport (JIAP), Karachi, Pakistan.

This compound will provide the Pakistan Customs Drug Enforcement Cell a nerve center for exchanging information concerning smuggling activities. It will support the officers, staff, and equipment of the Pakistan Customs Drug Enforcement Cell and Rummaging and Patrolling Sections. The project will enable coordinated quick-response to constantly evolving narcotics and contraband smuggling tactics. The contractor shall comply with all country agreements. All facility design and construction shall comply with local building codes.

PROJECT SCOPE: This project includes the design build construction of a new two story Tactical Command and Operations Center (TCOC) consisting of a main block and a cell / interrogation building placed separately within the same compound having an approximate area of 7,000 Square Feet (SF) (with a paved courtyard in the center) and a 900 SF building, respectively. Supporting work includes provisions for a new perimeter wall, two gates in the new perimeter wall with barrier security facilities, guard shacks for access to the main external highway, and removal of existing wall and gate. Paving, landscaping, shifting of existing generator and its fuel tank and connection to existing utilities are included.

ADDITIONAL REQUIREMENTS: The contractor must be licensed to conduct business in the country of Pakistan. (See required surety and registration)

TYPE OF CONTRACT AND NAICS: This RFP will be for a construction design build Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction.

TYPE OF SET-ASIDE: This acquisition will be UNRESTRICTED, Full and Open, Best Value Competition, No Set-Aside.

CONTRACTING PROCESS: This is a design build acquisition. Proposals will be evaluated and awarded based upon the best value procurement method in accordance with FAR (Federal Acquisition Regulation) Part 15. The Best Value, Lowest Price Technically Acceptable (LPTA) will be used to evaluate all proposals. The evaluation criteria will be conveyed within the RFP. One or more of the items in the project scope may appear in the solicitation as an option item. The contract will be awarded on a firm-fixed price basis only.

PROPOSAL/PREFORMANCE PERIOD: The tentative date for issuance of RFP# W912ER-13-R-0016 is April 01, 2013. The tentative date for receipt of proposals is May 01, 2013. The performance period will be 365 days from issuance of Notice to Proceed (NTP).

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is between $1,500,000 and $2,000,000.

REQUIRED SURETY/COUNTRY REGISTRATION: Performance and Payment Bonds are required and must be sufficient to cover 60% of the stated estimated annual maximum contract value. All costs associated with bonding shall be included in the coefficient. All of the work will be performed outside the United States. All firms must be capable of being registered to work in the country of Pakistan, in accordance with all Karachi, Pakistan laws and regulations. Firms must be able to attain a commercial business license for construction with the ministry of business and trade.

SITE VISIT: Information for a site visit will be provided in the Solicitation/RFP announcement.

REGISTRATION/SUBMISSION REQUIREMENTS: Offerors must have and must maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM data base, the Government reserves the right to award to the next prospective Offeror.

Register to receive notifications and subscribe to the mailing list for specific solicitations, offerors should visit the Federal Business Opportunity (FedBizOpps) located at http://www.fbo.gov or utilize the Vendor Notification Service in the Army Single Face to Industry (ASFI) Acquisition Business Web Site at https://www.acquisition.army.mil/asfi.

FILES PERTAINING TO THE SOLICITATION WILL BE AVAILABLE THROUGH SAFE ACCESS FILE EXCHANGE. Registered offerors will receive an email notification with the subject: AMRDEC Safe Access File Exchange Delivery Notice. The notification will include a description of the file, a link to the file, and a password to retrieve the file. The file will only be available for 14 days and the password is a ONE-TIME USE ONLY during the 14 day period.

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT APRIL 01, 2013 ON THE AMRDEC WEB SITE AT THE FOLLOWING ADDRESS: https://safe.amrdec.army.mil/safe2/Welcome.aspx

PLANS AND SPECIFICATIONS: This is an electronically issued solicitation. The Government will post the RFP to the AMRDEC site and be password protected. Proposals will be received in hard/paper copies only, including Compact Disks (CDs) containing all proposal contents. Electronic and fax proposals will not be accepted.

NOTE: The solicitation will not be provided to plan rooms, subcontractors, suppliers or vendors.

POINT-OF-CONTACTS/ADDRESSES: Cover letters and extraneous materials (brochures, etc.) will not be considered. Questions concerning submissions should be directed to Kenneth Baker, Contract Specialist at Kenneth.g.baker@usace.army.mil and Daniel Hanas, Contracting Officer at Daniel.M.Hanas@usace.army.mil.

Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
Place of Performance: USACE Middle East District, P.O. Box 2250, Winchester VA 22604-1450
Point of Contact(s): Kenneth Baker, 540-665-3783
Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
Place of Performance: USACE Middle East District, P.O. Box 2250, Winchester VA, 22604-1450, US
Point of Contact(s): Kenneth G. Baker, 540-665-3783
 
. .
"Merey aziz Hamwatano" .................... not really


According to my twitter, Karachi, Islamabad and Lahore are facing a Blackout. There is a TWITTER rumour that there is some problem in Mangla. Dont know much but enjoy the Blackout :(

Hahahhahahah great

On Topic :: Sorry what is going on in Pakistan as channels are not working at my home. Please Copy Pasto news.
 
.
There is long power cuts even after power is restored. Power restored at 8 Am. Again went out at 11 am and came back at 5 PM.
 
.
All the Grids are not Active even now , and some are tripping , & are causing cascade effect on other thus power is going out for a very long time , it will take at least 24hrs more to fix every thing . so dont be surprised if power goes for long time like 5-6 hours.
 
.
The entire powergrid is interlinked. Today 70% of the country was in a power blackout. Makran division of Balochistan was saved because its electricity comes from Iran.
 
.
Why Pakistan Don't focus on thermal power plants. A thread was running of abundant coal field found in somewhere ?
 
.
Does it really seem to be a conspiracy theory?


US army has started preparations to land US forces in Karachi. This is NO joke!!! As Pakistan starts to collapse, the US army is aggressively building a Command and Control Center (TCOC) at Karachi airport to act as the forward base to seize and control the airport for US troops landings.

Of course, the cover story is that the entire might of the US army is being deployed for anti-narcotics operations, as if we are all idiots here. US Marine Corp has also been practicing landing of Marine amphibians divisions on Makran coast just a few years back - again under the drama of anti-drug operations.

Once the anarchy gets out of control in Karachi, a local political party would facilitate US military landing, just as NATO did in Libya. The last phase of the 5thGW being deployed aggressively. For years, we had been warning the nation but those destined for punishment seldom do tauba.



https://www.fbo.gov/index?s=opportunity&mode=form&id=a4d5d575585008238636c897fefa1ac1&tab=core&_cview=0
Tactical Command And Operations Center (TCOC) And Guard Shacks At Jinnah International Airport, Karachi, Pakistan

Solicitation Number: W912ER13R0016
Agency: Department of the Army
Office: U.S. Army Corps of Engineers
Location: USACE Middle East District

GENERAL INFORMATION
Notice Type: Presolicitation
Posted Date: February 19, 2013
Response Date: March 6, 2013
Archiving Policy: Automatic, on specified date
Archive Date: April 20, 2013
Original Set Aside: N/A
Set Aside: N/A
Classification Code: Y -- Construction of structures and facilities
NAICS Code: 236 -- Construction of Buildings/236220 -- Commercial and Institutional Building Construction
Notice Type: Pre-solicitation

Synopsis: Feb 19, 2013 7:32 am

The U.S. Army Corps of Engineers (USACE) Middle East District intends to solicit a Request for Proposal (RFP) W912ER-13-R-0016 to construction firms or Joint Ventures (JV) experienced in working in the Middle East region who are interested in submitting a proposal for the Design and Build of a Tactical Command and Operations Center (TCOC) compound at the Jinnah International Airport (JIAP), Karachi, Pakistan.

This compound will provide the Pakistan Customs Drug Enforcement Cell a nerve center for exchanging information concerning smuggling activities. It will support the officers, staff, and equipment of the Pakistan Customs Drug Enforcement Cell and Rummaging and Patrolling Sections. The project will enable coordinated quick-response to constantly evolving narcotics and contraband smuggling tactics. The contractor shall comply with all country agreements. All facility design and construction shall comply with local building codes.

PROJECT SCOPE: This project includes the design build construction of a new two story Tactical Command and Operations Center (TCOC) consisting of a main block and a cell / interrogation building placed separately within the same compound having an approximate area of 7,000 Square Feet (SF) (with a paved courtyard in the center) and a 900 SF building, respectively. Supporting work includes provisions for a new perimeter wall, two gates in the new perimeter wall with barrier security facilities, guard shacks for access to the main external highway, and removal of existing wall and gate. Paving, landscaping, shifting of existing generator and its fuel tank and connection to existing utilities are included.

ADDITIONAL REQUIREMENTS: The contractor must be licensed to conduct business in the country of Pakistan. (See required surety and registration)

TYPE OF CONTRACT AND NAICS: This RFP will be for a construction design build Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction.

TYPE OF SET-ASIDE: This acquisition will be UNRESTRICTED, Full and Open, Best Value Competition, No Set-Aside.

CONTRACTING PROCESS: This is a design build acquisition. Proposals will be evaluated and awarded based upon the best value procurement method in accordance with FAR (Federal Acquisition Regulation) Part 15. The Best Value, Lowest Price Technically Acceptable (LPTA) will be used to evaluate all proposals. The evaluation criteria will be conveyed within the RFP. One or more of the items in the project scope may appear in the solicitation as an option item. The contract will be awarded on a firm-fixed price basis only.

PROPOSAL/PREFORMANCE PERIOD: The tentative date for issuance of RFP# W912ER-13-R-0016 is April 01, 2013. The tentative date for receipt of proposals is May 01, 2013. The performance period will be 365 days from issuance of Notice to Proceed (NTP).

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is between $1,500,000 and $2,000,000.

REQUIRED SURETY/COUNTRY REGISTRATION: Performance and Payment Bonds are required and must be sufficient to cover 60% of the stated estimated annual maximum contract value. All costs associated with bonding shall be included in the coefficient. All of the work will be performed outside the United States. All firms must be capable of being registered to work in the country of Pakistan, in accordance with all Karachi, Pakistan laws and regulations. Firms must be able to attain a commercial business license for construction with the ministry of business and trade.

SITE VISIT: Information for a site visit will be provided in the Solicitation/RFP announcement.

REGISTRATION/SUBMISSION REQUIREMENTS: Offerors must have and must maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM data base, the Government reserves the right to award to the next prospective Offeror.

Register to receive notifications and subscribe to the mailing list for specific solicitations, offerors should visit the Federal Business Opportunity (FedBizOpps) located at http://www.fbo.gov or utilize the Vendor Notification Service in the Army Single Face to Industry (ASFI) Acquisition Business Web Site at https://www.acquisition.army.mil/asfi.

FILES PERTAINING TO THE SOLICITATION WILL BE AVAILABLE THROUGH SAFE ACCESS FILE EXCHANGE. Registered offerors will receive an email notification with the subject: AMRDEC Safe Access File Exchange Delivery Notice. The notification will include a description of the file, a link to the file, and a password to retrieve the file. The file will only be available for 14 days and the password is a ONE-TIME USE ONLY during the 14 day period.

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT APRIL 01, 2013 ON THE AMRDEC WEB SITE AT THE FOLLOWING ADDRESS: https://safe.amrdec.army.mil/safe2/Welcome.aspx

PLANS AND SPECIFICATIONS: This is an electronically issued solicitation. The Government will post the RFP to the AMRDEC site and be password protected. Proposals will be received in hard/paper copies only, including Compact Disks (CDs) containing all proposal contents. Electronic and fax proposals will not be accepted.

NOTE: The solicitation will not be provided to plan rooms, subcontractors, suppliers or vendors.

POINT-OF-CONTACTS/ADDRESSES: Cover letters and extraneous materials (brochures, etc.) will not be considered. Questions concerning submissions should be directed to Kenneth Baker, Contract Specialist at Kenneth.g.baker@usace.army.mil and Daniel Hanas, Contracting Officer at Daniel.M.Hanas@usace.army.mil.

Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
Place of Performance: USACE Middle East District, P.O. Box 2250, Winchester VA 22604-1450
Point of Contact(s): Kenneth Baker, 540-665-3783
Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
Place of Performance: USACE Middle East District, P.O. Box 2250, Winchester VA, 22604-1450, US
Point of Contact(s): Kenneth G. Baker, 540-665-3783

Mr zaid hamid
 
.
and you are also not the one who know that its Federal govt who regulates electricity and the failure is not bcz of load shedding

what it mean is that nawaz sharif govt never though of making any dams..they invested heavily in ghazi brotha project, though still a good step, but at that price a dam good have been built upper parts of pakistan...but again punjab would have not been getting the huge royality that its getting from ghazi brotha project...ghazi brotha project is situated mostly in KPK but they get no royalities out of it


i dont know why its an issue..i dont feel a difference..its same routine loadshedding they just renamed to cover it
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom