What's new

ZTE Energy Pakistan 900 MW PV power plant grid-connected generation

Development C&P

FULL MEMBER
Joined
Apr 28, 2015
Messages
182
Reaction score
1
Country
China
Location
China
ZTE Energy Pakistan 900 MW PV power plant grid-connected generation,That's World's Largest Single PV Power Station

中兴能源巴基斯坦900兆瓦光伏电站一期并网发电 系全球单体最大

发表时间:2016-06-11 08:31:30

据光明网6月10日消息,6月8日,由中兴能源有限公司投资建设的巴基斯坦旁遮普省300兆瓦光伏电站正式并网发电。300兆瓦并网,年发电量可达4.8亿度,至少可解决巴基斯坦20万个家庭的日常用电。并网当日为巴基斯坦斋月第二天,为高温酷暑之中的巴基斯坦人民带来了期盼已久的清洁电力。项目总规模为900兆瓦,本次并网发电的项目一期。全部建成后将成为全世界单体最大的光伏发电项目。

20160611084215699.png


中兴能源巴基斯坦300兆瓦光伏电站航拍实景图

中兴集团凭借20多年在海外170多个国家的全球化经验,积极参与“一带一路”建设。中兴能源巴基斯坦光伏电站工程,是2015年4月习近平总书记对巴基斯坦进行国事访问期间见证启动开工的中巴经济走廊优先实施项目之一。

项目位于巴基斯坦旁遮普省巴哈瓦尔布尔市真纳光伏产业园,占地面积4500英亩,总规模为900兆瓦,全部建成后将成为全世界单体最大光伏发电项目,每年可提供清洁电力近13亿度,极大缓解巴基斯坦电力紧缺局面。项目总投资逾15亿美元,中国进出口银行、国家开发银行、江苏银行、渤海银行提供银团贷款,中国出口信用保险公司承保海外投资险,中合担保等机构提供担保支持。

20160611084154276.png


中兴能源巴基斯坦300兆瓦光伏电站航拍实景图

自项目启动,在中巴政府的支持保障下,中兴能源以高标准的“中国速度”推进项目建设,在大规模施工启动后90天完成50兆瓦并网发电,并于近日完成300兆瓦全部并网,创造中巴经济走廊首个完成融资,首个建成并网发电的能源项目,领跑“一带一路”国际项目建设。

中兴能源建设光伏电站,不仅为电力紧缺的巴基斯坦提供清洁电能,工程建设期间还为当地创造3000多个就业岗位,并进行技能培训。项目实施为缺乏光伏产业经验的巴基斯坦培养大量技术工程师。电站建成后运维人员80%为本地工程师。

电站建设克服高温酷暑、雨季、斋月、产业工人匮乏等不利因素,高效施工作业,海、陆、空物流综合统筹,最终在旁遮普省南部荒漠地区建起规模宏大,充满生机的“光能绿洲”。项目成功并网,对于中巴经济走廊建设具有重要的里程碑意义,将为中巴友谊注入源源不断的强大动力。

20160611084231567.png


中兴能源巴基斯坦300兆瓦光伏电站航拍实景图

http://www.guancha.cn/Neighbors/2016_06_11_363499.shtml
http://world.gmw.cn/2016-06/10/content_20494911.htm



related articles:

Pakistan’s China-backed solar power plant to connect with grid

Updated: Aug 30,2015 4:34 PM english.gov.cn/Xinhua
c-3.jpg

1_600.jpg


Pakistani workers install solar panels at the Zonergy-backed solar power station in Bahawalpur, Punjab province of Pakistan, Aug 28.[Photo/Xinhua]

A section of the 900-megawatt solar photovoltaic power plant at a solar energy industrial park in Bahawalpur, Pakistan, is ready to connect with the grid.

The plant, a priority project under the initiative of the China-Pakistan Economic Corridor, is financed and constructed by China’s Zonergy Company Limited to the tune of more than $1.5 billion.

The project has been constructed in three stages with each building a 300 MW section. It is estimated that the entire plant will be complete in 2017.

Currently, a 50 MW section is nearing completion and will be connected for power generation.





2_600.jpg


Pakistani staff work on the installation of solar panels, Aug 27.[Photo/Xinhua]

3_600.jpg


Solar panels at the 900-MW solar photovoltaic power plant in Bahawalpur.[Photo/Xinhua]

4_600.jpg


Power generation facilities of the 900-MW plant.[Photo/Xinhua]

http://english.gov.cn/news/photos/2015/08/30/content_281475179006839.htm





meteoconrol to Provide Remote Monitoring and Central Control Solutions to the World's Largest Single PV Power Station
11 August 2015 — 12:20 HKT

Cooperatively promoting the quality and operation & maintenance efficiency of Zonergy solar power stations

HONG KONG, Aug. 11, 2015 /PRNewswire/ -- meteocontrol China, a subsidiary of Shunfeng International Clean Energy (SFCE, HK stock code: 1165), announced today that it will provide integrated remote control systems to Zonergy Company Ltd.'s (Zonergy) soon to be completed phase one 100MW PV power station in Punjab Pakistan. Upon completion, the ground-mounted station will be the world's largest single PV power project, at 900MW. The two sides agreed that meteocontrol will provide generation II data acquisition devices, sensor and portal software VCOM, along with associated configuration, commissioning and training services.


meteocontrol enters into a partnership agreement with Zonergy Company Limited
Pakistan's Punjab Province is located in the core region of the ongoing "China-Pakistan Economic Corridor" megaproject, with excellent natural light resources. The 900MW PV terrestrial power station project being constructed by Zonergy Company Limited is the world largest single PV power project. Officially agreed upon by the government leaders of China and Pakistan, the project has been given priority to be completed as part of the "China-Pakistan Economic Corridor," and is an important opening project for the "One Belt, One Road" strategy. The initial 100 MW phase one project will soon be completed.

"It is great pleasure to cooperate with Zonergy to provide professional and efficient solutions and service to the 100MW phase one project of the 900 MW terrestrial PV power station in Punjab, Pakistan. This is also an excellent opportunity to deepen bilateral cooperation on smart operation and maintenance management of PV power stations," said meteocontrol China General Manager Henry Luo.

In addition, the two sides reached an agreement that meteocontrol will give priority to provide specialized monitoring as well as operation and maintenance solutions to the overall development plan of Zonergy's PV power station business segment. This will help build an intelligent monitoring platform, to help increase power station earning and to reduce overall operation and maintenance costs. The two sides further agreed to explore in-depth on how to widen their scope of cooperation to include power station quality assurance services and intelligent operation and maintenance management, including power station rating, technical due diligence, solar forecast, so as to assist Zonergy's business development both at home and abroad in a comprehensive way.

"meteocontrol is the market leader for professional PV remote monitoring systems, currently monitoring almost 37,500 PV systems around the globe with total installed capacity of 12 GW. Zonergy and meteocontrol have reached a consensus that we will jointly seize the market opportunities brought by China's "One belt, One Road" strategy, through leveraging meteocontrol's extensive expertise in PV power station operation and maintenance management, so as to ensure the quality of our power station, provide greater efficiency, reduce generation costs, and create more value for the customers," said Zonergy Vice President Jacky Jia.

About Zonergy Company Limited

Zonergy Company Limited specializes in the development, investment, construction, operation and financing advisory of distributed photovoltaic system and terrestrial photovoltaic power stations. Zonergy creatively combines PV with digital technology, relying on the unique advantages of the integrated network of markets, policy and financing, to provide professional and high quality services to the customers. Zonergy has accumulated extensive customer resources, made prominent achievements and won good reputation. The company actively served the country's strategy, strived at the international forefront of comprehensive exploration and utilization of solar energy resources. Zonergy also delivered leading performance in the National Golden Sun Demonstration Project, distributed PV project and terrestrial PV power station project. Zonergy has so far completed various PV projects with total installed capacity over 500MW, and carried out projects in untapped domestic and international markets with a total installed capacity over 2.5 GW.

About meteocontrol

meteocontrol, a subsidiary of Shunfeng International Clean Energy (SFCE), with EU headquarter based in Augsburg, Germany and APMEA headquarter based inShanghai (China), and offices and branches in Lyon (France), Madrid (Spain), Milan(Italy), Alameda (U.S.A.) and Moers (Germany), offers energy and weather data management, yield reports, quality audits and technical due diligence as well as monitoring and technical operations management of PV systems of all sizes. meteocontrol has more than 30 years of expertise in renewable energy filed and has so far been involved in projects with a total investment volume of more than 13 billion euros. The company currently conducts technical operation management for systems with a total power of around 500 MWp. In addition, meteocontrol is the market leader for professional remote monitoring of PV systems. meteocontrol monitors around 37,500 PV systems around the globe with a total power of over 12 GWp. For more detailed information, please visit: www.meteocontrol.com


http://www.chinamoneynetwork.com/20...to-the-worlds-largest-single-pv-power-station
 
Last edited:
. . . . . . . . .
Now Pakistan only needs to have this with banks of Li-ion batteries.

Energy generation and energy storage hand in hand is the way forward. :pakistan:

Any chance that some chinese battery production company might invest in Pakistan?
 
.
meteoconrol to Provide Remote Monitoring and Central Control Solutions to the World's Largest Single PV Power Station
11 August 2015 — 12:20 HKT

Cooperatively promoting the quality and operation & maintenance efficiency of Zonergy solar power stations

HONG KONG, Aug. 11, 2015 /PRNewswire/ -- meteocontrol China, a subsidiary of Shunfeng International Clean Energy (SFCE, HK stock code: 1165), announced today that it will provide integrated remote control systems to Zonergy Company Ltd.'s (Zonergy) soon to be completed phase one 100MW PV power station in Punjab Pakistan. Upon completion, the ground-mounted station will be the world's largest single PV power project, at 900MW. The two sides agreed that meteocontrol will provide generation II data acquisition devices, sensor and portal software VCOM, along with associated configuration, commissioning and training services.


meteocontrol enters into a partnership agreement with Zonergy Company Limited
Pakistan's Punjab Province is located in the core region of the ongoing "China-Pakistan Economic Corridor" megaproject, with excellent natural light resources. The 900MW PV terrestrial power station project being constructed by Zonergy Company Limited is the world largest single PV power project. Officially agreed upon by the government leaders of China and Pakistan, the project has been given priority to be completed as part of the "China-Pakistan Economic Corridor," and is an important opening project for the "One Belt, One Road" strategy. The initial 100 MW phase one project will soon be completed.

"It is great pleasure to cooperate with Zonergy to provide professional and efficient solutions and service to the 100MW phase one project of the 900 MW terrestrial PV power station in Punjab, Pakistan. This is also an excellent opportunity to deepen bilateral cooperation on smart operation and maintenance management of PV power stations," said meteocontrol China General Manager Henry Luo.

In addition, the two sides reached an agreement that meteocontrol will give priority to provide specialized monitoring as well as operation and maintenance solutions to the overall development plan of Zonergy's PV power station business segment. This will help build an intelligent monitoring platform, to help increase power station earning and to reduce overall operation and maintenance costs. The two sides further agreed to explore in-depth on how to widen their scope of cooperation to include power station quality assurance services and intelligent operation and maintenance management, including power station rating, technical due diligence, solar forecast, so as to assist Zonergy's business development both at home and abroad in a comprehensive way.

"meteocontrol is the market leader for professional PV remote monitoring systems, currently monitoring almost 37,500 PV systems around the globe with total installed capacity of 12 GW. Zonergy and meteocontrol have reached a consensus that we will jointly seize the market opportunities brought by China's "One belt, One Road" strategy, through leveraging meteocontrol's extensive expertise in PV power station operation and maintenance management, so as to ensure the quality of our power station, provide greater efficiency, reduce generation costs, and create more value for the customers," said Zonergy Vice President Jacky Jia.

About Zonergy Company Limited

Zonergy Company Limited specializes in the development, investment, construction, operation and financing advisory of distributed photovoltaic system and terrestrial photovoltaic power stations. Zonergy creatively combines PV with digital technology, relying on the unique advantages of the integrated network of markets, policy and financing, to provide professional and high quality services to the customers. Zonergy has accumulated extensive customer resources, made prominent achievements and won good reputation. The company actively served the country's strategy, strived at the international forefront of comprehensive exploration and utilization of solar energy resources. Zonergy also delivered leading performance in the National Golden Sun Demonstration Project, distributed PV project and terrestrial PV power station project. Zonergy has so far completed various PV projects with total installed capacity over 500MW, and carried out projects in untapped domestic and international markets with a total installed capacity over 2.5 GW.

About meteocontrol

meteocontrol, a subsidiary of Shunfeng International Clean Energy (SFCE), with EU headquarter based in Augsburg, Germany and APMEA headquarter based inShanghai (China), and offices and branches in Lyon (France), Madrid (Spain), Milan(Italy), Alameda (U.S.A.) and Moers (Germany), offers energy and weather data management, yield reports, quality audits and technical due diligence as well as monitoring and technical operations management of PV systems of all sizes. meteocontrol has more than 30 years of expertise in renewable energy filed and has so far been involved in projects with a total investment volume of more than 13 billion euros. The company currently conducts technical operation management for systems with a total power of around 500 MWp. In addition, meteocontrol is the market leader for professional remote monitoring of PV systems. meteocontrol monitors around 37,500 PV systems around the globe with a total power of over 12 GWp. For more detailed information, please visit: www.meteocontrol.com


http://www.chinamoneynetwork.com/20...to-the-worlds-largest-single-pv-power-station

900 MW, is it 24 hrs running capacity or sunlight peak hours time capacity?
 
. .
Only Peak hours. Probably only 100 MW plant is working and at night its output is around 15-20 MW only.
Excuse me I can't get it, how much energy it will produce in 24 hrs when project will be fully completed?
 
.
Clean energy, Pakistan sunshine is enough to be a good choice:cheers:
 
.
Excuse me I can't get it, how much energy it will produce in 24 hrs when project will be fully completed?

this is how it works sir g...

2012-10-2p.png


After completion of 1000 MW
It'll produce 700-800 MW at Peak hours (in afternoon)

but if you want to see the Production of the 24 Hours (1 Day) it'll be 200-250 MW maximum Because the capacity factor of Solar Power Plants are the lowest


Capacity-Factor-NEI-graphic.jpg
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom