What's new

The Indian Fist ~Arjun MBT and Arjun Mark II

Arjun mk 2 should have trophy aps and kaktus 1 era in frontal section along with 1500 HP engine. if broad sword is to be believed Arjun will definitely get 1500HP engine.
Broadsword: Army to order more Arjun tanks

The addition of two tonnes of ERA will increase the weight of the Arjun to just over 60 tonnes, making it one of the world’s heaviest tanks. But the DRDO claims that its powerful 1500 Horse Power engine easily handles the extra weight.
The ERA will protect the Arjun’s crews from enemy missiles. Initially we will fit the same Russian ERA that protects the T-90 and the T-72. But we will also develop our own indigenous ERA.

An early order from the army would be crucial, says the DRDO, for continuity in the Arjun production line at the Heavy Vehicles Factory (HVF) near Chennai. The current order of 124 Arjuns will occupy the production line until end-2011. For the next order of Arjuns to hit the production line then, the order would have to be placed now. That would allow 18 months for provisioning of components, such as armour sheets and sub-systems that are manufactured by ancillary suppliers. That period also caters for the purchase of foreign systems, e.g. the engine from MTU, Germany.









arjun_l7.jpg
 
Last edited:
.
Thursday, May 20, 2010
Generation 2.0: Arjun Mk-2


Path for the development of the Second generation of Arjun Mk-2 has been cleared recently by the Ministry of Defence and funding allocated , while the Army has ordered more 124 Arjun Mk-1 to keep the production line in Avadi busy till the Arjun Mk-2 will start rolling out from 2013-14 onwards . DRDO rather than starting all over again the Arjun MK-2 will have the same design of Arjun MK-1, but major changes are planned for the new generation variant of Arjun Tank to keep up with the new technological changes which are been incorporated in the MBT’s world over .
Arjun MK-2 will have Battle Field Management System (BFMS) which will enable the tank to get feed from UAV‘s and Helicopters, which then enable the Arjun mk-2 tank crew much aware of their surroundings and better understanding of the battle zone, this will lead to improvement in coordinating with other Friendly tanks in the zone and also avoid Friendly kills, it will also give information regarding enemy tank movement along with their troops and help navigate terrain in the battle zone.
Self-diagnostic system (SDS) will also be added to Arjun Mk-2 which is like a health monitoring system. it will not only tell the tank crew if it is having any problem but also point out the trouble area , it is also important when Tank has taken multiple hits from different position and from different ammunition after a self-diagnose Tank crew will know exact damage inflicted on the Tank .
Arjun Mk-2 will get a new efficient 1500bhp engine which has been in development by DRDO in India its self, they are reports that a Indian Private industry is also working with DRDO on the Engine development, currently Arjun MK-1 is powered by German supplied 1400bhp engine which is quite old in design and technical parameters but still a powerful and respected engine in the world.
NERA (non-explosive reactive armor) will be added to Arjun Mk-2 this will give the tank additional protection against anti-tank munitions, unlike ERA, NERA will enable tank to take multiple hits anti-tank munitions, but also increase the weight of Arjun MK-2 to 60 tons from its current weight (Arjun MK-1) of 58 tons.
It is much likely that Arjun Mk-2 will also spot Air-conditioning system for the crew, which will be powered from an APU which will draw its power from the Main engine of the Tank; this will enable the tank crew to operate in higher temperature of desert heat without any discomfort to the tank crew, Arjun MK-1 already has hardened electronics that function perfectly even in the Rajasthan summer without requiring any Air-conditioning system.
More changes will take place in Arjun Mk-2, above mentioned are mostly likely changes which will take place in the new variant.
BY: IDRW NEWS NETWORK
Posted by Kishan at 6:17 AM

http://indiandefencedirectory.blogspot.com/2010/05/generation-20-arjun-mk-2.html
 
. . .
Why the Indian Army to create a performance behind the tank? Indians can buy the most advanced tanks, the U.S. tanks and the German tanks.
 
.
BFAT WAGON

BFAT Wagons are fitted with transition type center buffer couplers along with side buffers. This
enables the wagon to be coupled to other rolling stocks either with center buffer couplers or
screw couplers. Chains with pockets for lashing of tanks on the Wagon is provided.

Four numbers of loading end flaps are provided over side buffer at both ends to facilitate loading
of battle tanks. Lashing chains, Track guides are provided for guiding the movement of the tanks
during loading and unloading & Wedge stops are provided for securing the battle tanks during
transportation.

BFAT Wagons are specially designed for transportation of main battle tanks viz., Arjun, T-72 / T-
90 and BMP-II.
BOGIE
2vll2ch.jpg


The Underframe is a heavy welded flat structure fabricated with steel plate flooring.
Underframe will have provision to accommodate center pivot pin for bogies, buffers and
transitional coupling.

Bogies are of 3 Axle fabricated welded type with cylindrical roller bearing and brake
linkage. The suspension arrangement is with leaf spring interlinked with the three axles
through fulcrum lever.

BFAT Wagons are provided with dual Brake. Air brake system of single pipe graduated
release type. Air brake cylinders, valves, reservoirs, piping etc. are mounted on the
bottom side of the Underframe. The wagons are provided with hand brake. Vacuum pipe
is also provided for attachment with vacuum rolling stock.

Specifications
Gauge................................................ 1676 mm
Length over Head Stocks...................... 14500 mm
Length over Coupling Faces.................. 15782 mm
Distance between center of Bogies........ 10000 mm
Width over Body.................................. 3550 mm
Floor Height from Rail Level.................. 1306 mm
Axle Load............................................ 20.0 Tonnes
Wheel Diameter................................... 915 mm
Carrying Capacity................................. 61.0 Tonnes
Tare Weight........................................ 45.1 Tonnes
Gross Weight....................................... 106.1 Tonnes
Maximum Speed................................... 40 kmph
 
. . .
If you read my article on al khaid you will find that its vastly superior to the arjun MBT MK1 . It also eliminates the need for a loader in the crew as well.

hmmm so all those tanks like ( M1, challanger, leo ) are inferior to Al khalid since they all have manual loading. 'i thnked u for showing true colors so early :lol:
 
.
India's Arjun Mk.2 Tank Revealed
FRIDAY, AUGUST 10, 2012


By Atul Chandra
FORCE Magazine

Arjun2.jpg

Arjun3.jpg

Avadi, Chennai: After more than three decades of development, India’s Arjun Main Battle Tank (MBT) has literally emerged like a phoenix from the ashes, surprising even its most sceptical observers. Last year, the Arjun outgunned the Indian army’s T-72 and T-90 MBT’s, when trials were conducted with the respective units putting up their best tanks and personnel.

FORCE visited the Combat Vehicles Research & Development Establishment (CVRDE) for an exclusive insight into the programme. We learnt that while the Arjun Mk-2 is substantially improved and more capable than the Arjun Mk-1; it is too heavy, limiting areas where it can be deployed by the Army. And that renders it unsuitable for the army’s operational requirements for a Main Battle Tank (MBT). According to P Sivakumar, Director CVRDE, “the weight of the Arjun prevents it from being deployed in all the areas required by the Army”.

Keeping this in mind, the Arjun Mk-2’s improved performance seems to have put the Army in a spot. What does one do with a tank that is fast, can shoot accurately on the move and is relatively well protected but is too heavy to be deployed in the deserts near the Pakistan border as a replacement for the T-72 or T-90? Paradoxically, while the tank itself has demonstrated high speed and mobility, its weight precludes it from being able to operate anywhere the army wants it to. The Arjun Mk-2 will weigh around 67 tonnes and this fatally limits the tank’s operational effectiveness for the Indian Army.

The tank is too heavy to be deployed across the border with Pakistan. It is unable to effectively traverse terrain filled with natural and/or artificial obstacles. Or areas criss-crossed with rivers and canals. That rules out most places in Rajasthan, Punjab and the mountainous terrain of the J&K sector.

This has forced the army to identify areas where the Arjun can safely be deployed and its operational units based. This probably means the Arjun will not fight alongside the T-90s and T-72s. It will certainly not be part of the Indian Army’s strike corps formations, as it could get bogged down in unfamiliar terrain. This runs counter to the philosophy of armoured formations, which are designed for mobile offensive operations deep inside enemy territory. Unlike the T series tanks that have been airlifted to high altitudes like Leh and even out of the country, the Arjun cannot be airlifted by the IL-76 and C-130 J transports of the Indian Air Force (IAF). The C-17 Globemaster to be inducted by the Indian Air Force (IAF) has a maximum payload of 75 tonnes — insufficient to airlift the 67 tonne Arjun Mk-2 with attendant support equipment.

During this correspondent’s visit to the CVRDE facility at Avadi in Tamil Nadu, it was evident that despite the best efforts of its highly committed team of designers and scientists, the Arjun is unlikely to ever be ordered in significant quantities by the Indian Army — which fields close to 3,500 tanks in its Order of Battle (ORBAT). The total orders for the Arjun as of today are 240 (124 Mk-1 and 116 Mk-2). For the Army, ordering more tanks would result in it having to devote more resources — something it seems loath to do.

As things stand presently, the first Arjun Mk-2 will roll off the production line at Heavy Vehicles Factory (HVF) Avadi, two and a half years (30 months) after the order is placed. With the orders likely to be finalized towards the end of the year, the first Mk-2 tank will enter operational service in 2016. With HVF Avadi looking at a production rate of 30 tanks a year, all 116 tanks will be delivered by 2020. If work on the Future Main Battle Tank (FMBT) begins now in right earnest, then the first tanks could be ready for operational service circa 2025. Until then, the army would rather soldier on with its T-90 and upgraded T-72 tanks, which in any case have the required infrastructure in terms of training, manufacture and overhaul.

The major improvement in the Arjun Mk-2, is its missile firing capability from the gun barrel. This was demonstrated in 2004, with Israel Aerospace Industries’ (IAI’s) Laser Homing Attack/Anti Tank Missile (LAHAT). But the tank did not have an integrated Laser Target Tracker (LTT) at that point of time. That is now in the final stages of inspection and is being demonstrated to the user. The army has also asked for more types of ammunition on the Mk-2. This includes Thermobaric rounds and Penetration cum Blast rounds that will be developed in India. Thermobaric warheads create a sustained and intense pressure wave, which can be used against bunkers and hardened targets, while causing minimum damage to the surrounding areas. The army has also asked for two types of practice rounds, including blank rounds for ceremonial purposes. These will also reduce wear and tear on the barrel during training. In terms of protection, the Mk-2 will have full frontal Explosive Reactive Armour (ERA) and since commonality was desirable, it will use the same structuring as the T-series. The Defence Research & Development Organization (DRDO) is re-developing the explosive element, which is currently Russian, with better protection capability. It is being developed at the High Energy Materials Research Laboratory (HEMRL). This will be used for the Arjun, T-90 and T-72 tanks. Active Protection Systems (APS) that help evade attack — both by confusing enemy sensors (soft-kill) or by physically destroying incoming warheads (hard-kill) — will also be incorporated on the Mk-2.

The Israeli ‘Trophy’ system is being considered for the Mk-2. There will also be a mine plough to deal with pressure based mines, magnetic mines and tilt based mines. The driver’s seat on the Mk-2 is now suspended from the roof, compared to being fixed to the floor on the Mk-1 — this provides better mine protection capability. With the Explosive Reactive Armour (ERA) and mine plough together weighing 3 tonnes and additional add-ons expected, the MK-2s weight is expected to increase from 62 tonne to 67 tonne. The suspension has been re-designed to handle 70 tonne. To cater to complaints of track shedding, the revised tracks will have an increased horn length (19 mm) and the wheels have become slightly bigger. The tracks are imported from Germany but the rest is indigenous. The engine will remain the same on the Mk-2. With the original power pack on the Mk-1, the final drive catered to a top speed of 72 kmph. For the Mk-2, the final drive has been changed by increasing the reduction ratio from 4.4 to 5.3 and the top speed is now reduced 58.5 kmph but the torque and the force available at the contact between the track and the road has increased which can cater for the increased weight. Despite the increased weight, CVRDE claims that the acceleration is better than the Mk-1, while fuel efficiency remains the same.

The Arjun Mk-2 programme also suffered a severe setback with the unfortunate demise of senior scientist G K Kumaravel a few months ago. Kumaravel died in a road accident, while at Pokhran for trials of the Arjun Mk-2. He was heading the Arjun programme and slated to take over as Director, CVRDE in the future. He had played a crucial role in the developments and system integration of the Arjun MBT Mk II. The Arjun programme will now be led by V Balamurugan. The biggest problem being faced by the Arjun and a fate that is shared by almost all other indigenous programmes, is the small numbers ordered — that precludes investment in the required production and tooling. Sivakumar told FORCE that “Greater numbers are essential for reducing the price, establishing the process, good quality control mechanisms and continuous consistency in production”. This is also the reason he says that orders are a must. The Heavy Vehicles Factory (HVF) has not been producing Arjun MBT’s for two years and lot of the know-how is being lost.

While officials at CVRDE say the Army has been happy with the performance of the Mk-1, FORCE learnt that non-availability of spares is a continuing problem — the usage of spares was greater than anticipated. There have been complaints of track shedding, though CVRDE officials say that’s caused by inexperienced drivers who’re used to the T-72 and T-90. The 120 mm tank gun has been proved on the Mk-1 series and today, the Arjun barrel offers better life when compared to the T series of tanks. There have been barrel issues on a few tanks and a committee is looking into the matter, according to CVRDE officials.

The process of obtaining replacement spares is time consuming, since there are a number of agencies involved. Limited production numbers further exacerbate the problem. Director Sivakumar told FORCE that steps were being taken to tackle this problem and “unlike the Mk-1, where orders for the tank and the Engineering Support Package (ESP) were handled separately, in the Arjun Mk-2 this will be done simultaneously. That will reduce the time taken for delivery of the required items”. According to him, production has improved dramatically and an Israeli firm is now working on computerization of the line.

Meanwhile, the Indian Army is struggling to maintain its ageing fleet of T-72 MBT’s. While the T-72 was acknowledged to be one of the finest Russian tank designs, the ageing tank fleet is now increasingly difficult to maintain. Its small size and cramped turret make it difficult to incorporate the latest technology — like fire control systems, night vision and electronics. Unfortunately for the Army, the T-90 has not proved to be as sterling a performer as its predecessor. A number of glitches have come to the fore and production at HVF has been slow to take off. Russia has also refused to transfer technology related to metallurgy for T-90S gun barrels and armour plates to the HVF.

Despite all that, the Arjun outgunning the T-90 and T-72 in comparative trials, is akin to the Light Combat Aircraft ‘Tejas’, defeating the F-16 in a dogfight! The units that took part in the competition put up their best tanks and crew. The Arjun managed to fare very well. Army sources have freely admitted to FORCE, that there is a mind block with regard to the Arjun, by those who have operated the T series tanks. But they also admit that the Arjun is appreciably more modern in comparison to the T-72 & T-90, in many respects. For example, the Arjun can fire almost twice the number of rounds the T series tanks can, from its main gun.

The Arjun Mk-2 in many ways is what the Arjun Mk-1 should probably have been. Tragically, total orders for the Arjun over the next decade are unlikely to exceed 400 to 500 units including the 240 already ordered, plus other variants like the Armoured Repair and Recovery Vehicle (ARRV), Catapult 130 mm Self Propelled Gun and SP-155 gun chassis. The last refers to a tracked base that was to be mated with a Slovakian gun, in collaboration with Bharat Earth Movers Limited (BEML). That proposal has already run into rough weather. It remains to be seen if the army will accept such indigenous offerings or prefer to go abroad for proven systems, which can be inducted quickly and in meaningful numbers, to arrest the alarming decline in its armoured and artillery capability.

What is however clear is that continued production and development of the Arjun must be allowed to continue, if critical design, development and production know-how is not to be frittered away. It is also essential to keep the production line functional — through manufacture, repair, overhaul and upgrades, till the Future Main Battle Tank (FMBT) programme begins to gather steam. Keeping this in mind, it is likely that the DRDO will be able to prevail on the army for a few more orders, to enable low-rate production to continue. It is imperative that the DRDO and the Army move faster on the FMBT programme, to ensure that it is ready in time to replace the T-72.

In all, the army’s armour profile through 2015-2020 could comprise of approximately 1700 T-90S, 1800-2000 upgraded T-72M1s, and 250-500 Arjun’s. Surely, prospective orders for the FMBT, which at the very least would be for 1000-1500 tanks, are incentive enough for this to be taken up as a national project. This futuristic tank is unlikely to cost less than Rs 50 crore a piece — the total orders would be worth Rs 50,000 to 75,000 crore.
 
.
The tank is too heavy to be deployed across the border with Pakistan. It is unable to effectively traverse terrain filled with natural and/or artificial obstacles. Or areas criss-crossed with rivers and canals. That rules out most places in Rajasthan, Punjab and the mountainous terrain of the J&K sector.

Looks like a Lifafa piece paid for by corrupt import lobby.

Actually, Arjun ground pressure is lower than either T72 or T90, so it's quite suitable for either Rajasthan or Punjab.
 
.
Looks like a Lifafa piece paid for by corrupt import lobby.

Actually, Arjun ground pressure is lower than either T72 or T90, so it's quite suitable for either Rajasthan or Punjab.

In middle east, for rough grading we use D10. D11 bulldozers in desert for rough grading, I never saw any stuck. even while pushing the cut sand in which you cant even walk on without having up to ur knee sand. D11 is over 100 ton i guess.
 
. .
Nice picture .........Thanks for sharing .....

What is that box attached at the back of the chasis ???????
 
. .

Country Latest Posts

Back
Top Bottom