Here is my understandings:
Batch Production- A production system in which a process is broken down to seperate operations that are completed as a batch before moving to the next production stage. Generally all the major parts which make up an aircraft is divided as the phases such as fuselage,tail,wings,landing gear,engine and flight control systems. In JF-17 production, it has divided into 8 (according to MuradK) in PAC.
The definition you have put forward about batch production is the management courses / industrial definition.
Here in aircraft production, it refers to the orders being placed for the 1st, 2nd or 3rd batch, tranche or whatever you can call it. JF-17 will be inducted in 3 batches of 50 each, is an example of batch production.
Plz check the below link and see the Production heading and see how Typhoon has been produced in Tranches / Batches depending on orders from customers which also includes some changes in the variants also as per the tranche / batch.
Eurofighter Typhoon - Wikipedia, the free encyclopedia
The figure 8 is for the first 8 JF-17s delivered to PAF during 2007-08 for further testing and evaluation at its end not 8 different parts of JF-17s. Its called SBP aircraft as full fledged production had not yet started as no orders received. PAF asked for some JF-17s so that it can test it further in Pakistan as per its own standards and requirements and see what it lacks which can be fulfilled before the final production starts.
The term "Small Batch Production" here refers not the prototype thingy used for testing purpose rather the definitive design which has to be delivered (Its already in the squadron).
Yes its not called a prototype, but SBP aircraft do work as prototypes for the operator, the manufacturer calls it a prototype, but the user before finally inducting it does needs to do its own tests and evaluations before accepting the final design and in PAF's case, we used these 8 SBP aircraft as prototypes for training pilots, seeing whether it integrates as per requirements with our air defence requirements, communication compatibility, its avionics fully integrated with the PAF requirements and air defence infrastructure, training of ground staff, know how of the system, building of required infrastructure hard and soft both, etc etc, these all could not have been done in China and even if some things had been done, it would have been a very expensive endeavor.
Thus it were SBP for us another name for prototypes for the PAF the operator of the aircraft, before final production starts and formal induction is done, it has to be fully checked out, we go for serial production and after getting 50, we come to know there is some big problem which all 50 needs to be rectified, just imagine what a nightmare it would be. So this is the usefulness of the SBP aircraft, they work as another kind of prototypes.
After all this , Mr.Nabil is claiming that
Small production aircraft do not take part in a full fledge military exercise like Azm-e-Nau..... Anything else you wan to know??
An absurd comment to made with a serving aircraft.
I don't see any absurdness, reason being, would you use the 4-5 LSP Tejas LCAs in your Vayu Shakti exercises ?? Were they used recently even though there were 2-3 LSP Tejas in service ?? No.
Reason being the IAF will first check them out fully as per their requirements, see if they fully are integrated with the IAF doctrine, infrastructure etc etc and once done, IAF will formally induct them and then you will see them in your next Vayu Shakti exercise.
Small Batch Production SBP is another name of Limited Series Production LSP which you guys use for your LCA. Purpose is same, only acronym are changed.
Hope this would be enough to make you understand what is the SBP in PAF's terminology and the difference between a prototype & SBP and also SBP are not used officially as they are not inducted, once the first Sqd was inducted, the first 8 JF-17s would not be called SBPs anymore as now they have become fully operational with the operator PAF and have passed all the parameters set for it.