Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Thats is why I also suggest that in the renegotiation, we should get 20 % TOT and some work share in subsystems that are part of development cost. IP rights IMO is only for the technology that Indonesian engineers contribute, this is why in the first team sent to Korea, there are lawyers as well.
But regarless we get IP rights or not on the design, we will likely to get the blue print. From that blue print we can use it for making our own jet fighter in the future as a base design. Just like how we can easily develop N 219 after manufacturing and developing C 212.
Export license IMO is not really necessary as long we can get TOT and workshare on critical subsystems that are being developed by Korea. We just have 20 % share, remember ???
If not 25 years from now, then it can be 30 years from now. If not 100 %, at least 60 %. As I said, step by step, and we cannot get anything if we dont take the first step.
Is there a source where I can see the job share of Indonesia (all companies) including product (or development) for KFX-IFX ? @Indos
New Recruit
Nah, this one is for ship. By what i mean for ship you should know what ship we're going to equipped with. For coastal battery i think we're going for exocet one.@Kansel maybe we can use this brahmos for coastal defence as the navy already has the Exocet and also Yakhont in their inventory for SSM?
New Recruit
You mean the planned indonesian iver? Heard the rumours but i dont actually think that top navy brass is actually considering it. But ive never heard of any plan to use excocet as a coastal defence battery?Nah, this one is for ship. By what i mean for ship you should know what ship we're going to equipped with. For coastal battery i think we're going for exocet one.
There's a plan to procure coastal battery (still dont know who's gonna be the user). For that rumours, yes indeed it's just a rumour we can just wait for the situation development then. I also dont support this idea because using 2-3 different VLS on ones ship isn't really effectiveYou mean the planned indonesian iver? Heard the rumours but i dont actually think that top navy brass is actually considering it. But ive never heard of any plan to use excocet as a coastal defence battery?
New Recruit
The development on the armaments for the iver is pretty quiet lately. Is the rumoured air defence missile for the frigate which will be consisting mainly MICA missile only already fixed? I hope theres plan to put CAMM-ER as well aside from the MICA considering MICA doesnt have much time left on its timeframe.There's a plan to procure coastal battery (still dont know who's gonna be the user). For that rumours, yes indeed it's just a rumour we can just wait for the situation development then. I also dont support this idea because using 2-3 different VLS on ones ship isn't really effective
Since brahmos development based from P-800 Oniks (Yakhont) means the dimension between these 2 missiles is similar. and the only platform that already proved to carry similar missiles like this is Ahmad Yani class, if they're goin to put brahmos inti iver they need to modify it first.Can we really integrate russo-indo system in Brahmos with european NATO system in Iver?
That brahmos vls gonna take A LOT of space inside iver too.
If this plan come true, I hope we really got Poseidons so we can get full capability of brahmos.
Nothing new anymore, only this "rumour" i mention beforeThe development on the armaments for the iver is pretty quiet lately. Is the rumoured air defence missile for the frigate which will be consisting mainly MICA missile only already fixed? I hope theres plan to put CAMM-ER as well aside from the MICA considering MICA doesnt have much time left on its timeframe.