What's new

Indian Navy Initiates Steps to Acquire Predator B Guardian and EMALS - LOR sent to US Gov

PARIKRAMA

SENIOR MEMBER
Joined
Jan 5, 2014
Messages
4,871
Reaction score
185
Country
India
Location
India
Indian Navy Initiates Steps to Acquire Predator B Guardian and EMALS
- Letters of Request sent for both systems to US Government


By Gulshan Luthra Published: July 2016


Guardian.jpg



New Delhi. The Indian Navy has initiated the first steps towards acquiring the Electromagnetic Aircraft Launch System (EMALS) as well as the long range surveillance drone Predator B Guardian by sending Letters of Request (LORs) to the Pentagon under government-to-government deals.

The LORs, requesting price and availability for 22 Guardians and three EMALS catapults, are now under consideration by the US Department of Defense (DOD) for clearance under the Foreign Military Sales (FMS) programme and according to sources in Washington, a positive view is likely to be taken and discussions between the two countries should begin soon. Once the process is through, the US Government (USG) will confirm by sending Letters of Acceptance (LOAs).

The Predator B Guardian is a naval version for long range surveillance over the waters while the EMALS is being considered by the Indian Navy for its second indigenous aircraft carrier, INS Vishal, due out by 2028. EMALS has been adopted by the US Navy as its next generation aircraft launch system, and again significantly, for its new generation aircraft carriers beginning with CVN 78 Gerald R Ford, due for delivery this year.

EMALS.png


Dr Vivek Lall, Chief Executive Global Commercial Strategic Development for the San Diego-based General Atomics which makes these two systems, declined comment but told India Strategic: “As far as General Atomics is concerned, we will be opening an office in the Indian capital to assist both the Governments as required.”

Avenger.jpg


Notably the Guardian is a high performance Intelligence, Surveillance and Reconnaissance (ISR) aircraft, and could only be sold to India after it cleared the Missile Technology Control regime (MTCR) regulations. Powered by a high performance Honeywell TPE331-10 turboprop engine, it operates from a high altitude of 50,000 feet and can fly for 27 hours before returning to its base.

It is equipped with day-night sophisticated sensors including Raytheon’s SeaVue multi-mode maritime radar to identify and track vessels of different sizes, signals and electronic intelligence systems, satellite communication and even the Traffic Collision Avoidance System (TCAS).


The EMALS uses the propulsion power of electromagnetic energy, and the advantage of the system is that it can adapt to launch different sizes of aircraft from a carrier deck with the flick of a switch. Using Direct Current electricity, it is also being devised to launch satellites in the coming years.

The existing generation of aircraft launch steam catapults, developed decades ago, are much slower.

The Indian Government has acted fast to acquire these assets towards securing the Indian waters against terrorist and hostile intrusions. The LORs in fact were sent by the Navy soon after Prime Minister Narendra Modi’s official visit to Washington in June, just as the US also anchored India's entry into MTCR and declared India to be a Major Defense Partner (MDP).

There are no confirmed financial figures for either the drones or the EMALs, but according to industry sources, the list price for the 22 Guardians should be around US $ two billion.

Overall though, General Atomics, the biggest privately-held US defence company, could land with big multi-billion dollar deals in the coming years as the Indian Air Force (IAF) has also expressed interest in acquiring more than 100 Predator C Avenger attack drones. IAF had sent a communication in September last year, and significantly during Mr Modi's visit, this requirement was mentioned at the highest levels.

The jet-powered Avenger is a high performance next-generation drone, or Remotely Piloted Aircraft (RPA), for time-sensitive strike missions. It fires missiles to neutralize multiple hostile targets with precision with the flick of a command sent through satellites.

As the procedural paperwork for this drone could also begin only after the MTCR clearance, the Indian Ministry of Defence (MOD) should clear the proposal in due course. (India has just become the 35th Member of MTCR).

Notably, FMS deals require government-to-government (g-to-g) negotiations but with active support from the industry which manufactures every system in the US. The process ensures reasonable pricing, largely in accordance with what the US armed forces would pay for similar systems. The Defense Security Cooperation Agency (DSCA) of the Department of Defense (DOD) however charges a fee within a band of 2.5 to 5 percent to facilitate the process.

For instance, in the case of Boeing C 17 heavy lift transport aircraft, this was fixed at 3.8 percent. The fee varies for different deals, but will be the same for every country that buys the same system from the US.

The EMALS system is accompanied by Advanced Arresting Gear (AAG) to assist in secure landing of aircraft.

upload_2016-7-31_16-42-14.png


Link: http://www.indiastrategic.in/Indian..._to_Acquire_Predator_B_Guardian_And_EMALS.htm
 
++
A side news as well

Under Secretary Kendall Visits India

New Delhi. Frank Kendall, Under Secretary of Defence for Acquisition, Technology and Logistics at the U.S. Department of Defense visited India from July 25-28. During his visit he took part in the semi-annual Defense Technology and Trade Initiative (DTTI) and had fruitful meetings with his counterparts at the Ministry of Defence in Delhi.


USD Kendall and his delegation met with Secretary, Defence Production Ashok Gupta and his team to discuss and review progress on current DTTI efforts, as well as to determine the way ahead for the new Pathfinder Projects and Joint Working Groups that were agreed to during Secretary Carter's visit to India and Prime Minister Modi's visit to the U.S.

The next DTTI meeting will be held in Washington, DC in January 2017.

++++
@Abingdonboy @anant_s @Taygibay @Picdelamirand-oil @Vergennes @randomradio @Ankit Kumar 002 @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @others

+++

So finally some progress..
Was feeling no DTTI stuff going on and IN procurement also slowdown. At least procedural stuff is going on..
 
The most interesting part of this news is EMALS.
3 EMALS indicates IAC 2 and followup ships will feature them and it also implies long term policy planning of having 5 ACs (possibly in time frame of 2030). I also assume some sort of agreement on AC between two governments.
@PARIKRAMA seems like news you shared about having 4-5 squadrons of F35C could well be correct now!
 
So many news item in the last several months with head lines like eyeing , under lens , under cross hairs , planning, but no follow report ever cones up . Either these leaks were for public consumption , or just a media aided cover up or down right BS.

Buy them at once..... Nation,s security is a sensitive issue....OK Mr Parik

Else Go to hell....leave me alone:pissed::drag:
 
The most interesting part of this news is EMALS.
3 EMALS indicates IAC 2 and followup ships will feature them and it also implies long term policy planning of having 5 ACs (possibly in time frame of 2030). I also assume some sort of agreement on AC between two governments.
@PARIKRAMA seems like news you shared about having 4-5 squadrons of F35C could well be correct now!

3 Emals catapult will go in 2 in ship and 1 in shore based training. The F35s which i said i am not sure is for Indian Navy but then who knows what our MOD decides.

The 5 CBG will take much longer time and more like 2045-50 timeline. Uptill 2030 if IAC2 is operationalize that should be enough
 
3 Emals catapult will go in 2 in ship and 1 in shore based training. The F35s which i said i am not sure is for Indian Navy but then who knows what our MOD decides.

The 5 CBG will take much longer time and more like 2045-50 timeline. Uptill 2030 if IAC2 is operationalize that should be enough


Or probably 2 catapult on one ship; though in that case ship should be considerable larger than postulated 65000 Tonn class- more like 75000-80000 tonnes, which is something that I too would like as increasing tonnage has diminishing costs in 65000+ Tonn region.
 
one thing is sure .. deal or no deal every step . be it writing an email or drafting the email . grammar correction , spell check, draft all these details will be shared with media to create hype.
 
what about heron tp india got them?

100 milion for uav unarmed?
 

Back
Top Bottom