how many hours of test flight? Any ideas?
One keeps hearing conflicting stories on the Light Combat Aircraft (LCA). What is the update on the project?
To understand the LCA, it is necessary to go to the beginning. People say that the project started in 1983. The truth is that the Air Staff Requirements (ASR) itself was not available in 1983. All that had happened was that the country had conceptually decided on a need for the LCA and a sanction of Rs 560 crore was made. It took about five to six years to arrive at a definition of what the LCA should be. The ASR was given in 1985 and by 1988 we understood what the air force was looking for. After this, we started the project definition studies and the summary of these studies stated that seven prototypes should be made as is normally done all over the world. But in 1990-91, the government felt that so much of a risk could not be taken and the requirement of seven prototypes was split into two phases: two technology demonstrators (TD) followed by five prototypes. In the TD stage we were told that no sensor or weaponisation was required; only certain technologies were to be demonstrated. In April 1993, an amount of Rs 2,188 crore was allocated only for the TD, implying that before this, funds were not available to launch the full scale programme. The technologies needed to be demonstrated were composite-based wing structure, digital fly-by-wire flight control system, all digital avionics and computer-based control of electro-mechanical systems.
In January 2001, the TD1 was flown and the government saw the promise in the programme. In November 2001, the government gave the go-ahead to start work on the proto-vehicles (PV), which are basically meant for sensors and weapons’ integration. Till this time, the government did not fund us to make a fighting machine or PVs for which funds to the tune of Rs 3301 crore were released then. The sanction fund of Rs 3,301 crore is not only for the proto-vehicles but for the limited serial production (LSP) of eight aircraft, including the infrastructure needed for them to establish a production line of eight aircraft per annum. This was the turning point for the programme. In June 2002, we flew the TD2 and in November 2003, we flew PV1.
There was a transformation at this stage as we realised that an entire generation of electronics had changed by 2001. Fortunately, by 1998-99, we decided to make the entire avionics of the aircraft with an open system of architecture. Hence, the PV2 that flew in December 2005 was with an open system of architecture. The advantage is that it allows us to tackle obsolescence of electronic hardware. In this process, we were able to make nearly 80 per cent of avionics indigenously. Today, the Indian Air Force (IAF) is very happy with us on this issue because we have the most current concept of avionics in the aircraft. In December 2006 we flew PV3, and in April 2007 the LSP1 version. The LSP2 was flown recently in June 2008. Today, we have seven aircraft in flying condition: TD1, TD2, PV1, PV2, PV3, LSP1 and LSP2. Our first trainer aircraft is round the corner, probably in another two months. We are now very close to programme completion. We are looking for Initial Operational Clearance (IOC) in December 2010 and Final Operational Clearance (FOC) by 2012. In March 2006, the IAF placed the order for 20 aircraft in IOC configuration.
Today, in terms of the aircraft, we look at two major aspects. The first is the flight envelope expansion, implying the altitude and speed of the aircraft as well as acceleration and manoeuvres. In this respect, we have already validated all the parameters except the angle of attack. We are presently, at 20 when the required is 22. The second aspect is sensors and weapons integration. We have integrated the day and night attack sensor system, what is called the Litening Pod and the helmet-mounted display system (HMDS) for slewing the radar and litening pod towards the target. What is now pending is radar integration and release of weapons. We did the sea trials in June 2007 at Arakonam. In November 2007, we fired a close combat missile (CCM) from the aircraft in Goa and recently (May 28-June 4) we completed the hot weather trials in Nagpur.
As from the above excerpts it is already know that the current engine does not fulfill the ASR. Nothing new said. The plan for ordering more 20 is under process this is also known if you read the complete interview in post 603. The plan for new engine is also under process and mentioned in the interview. And this guys just says that the plan is not there without even quoting any body? From when he became an authority but nevertheless it's an encouraging development that now the number will stand for 125+ 20 or may be 40.In 2005, the IAF placed an order with Hindustan Aeronautics Limited for 16 fighters and four trainers. The then Defence Minister Pranab Mukherjee said a decision on an additional 20 aircraft was under consideration. But that plan has come a cropper since the overweight, under-powered Tejas does not meet the IAF’s minimum air staff requirements (ASR).
Cold weather trials it seems
ADA WebSite - Home
LCA-Tejas has completed 968 Test Flights successfully. (09-Dec-08).
* LCA has completed 968 Test Flights successfully
(TD1-233, TD2-292,PV1-182,PV2-105,PV3-107,LSP1-29,LSP2-20).
* 107th Ferri flight,Nagpur of Tejas PV3 occurred on 08th Dec 08.
* 20th Ferri flight, Nagpur of Tejas LSP2 occurred on 08th Dec 08.
^^