What's new

First Scorpene submarine to be ready by Sept 2016: Admiral Dhowan

RPK

SENIOR MEMBER
Joined
Jul 6, 2009
Messages
6,862
Reaction score
-6
Country
India
Location
United States
First Scorpene submarine to be ready by Sept 2016: Admiral Dhowan - The Hindu

Chief of the Naval Staff Admiral Robin Dhowan has said that the construction of French-origin Scorpene submarines at Mazagon Dock is progressing well, with the first submarine now scheduled to be delivered by September, 2016.

Speaking to The Hindu on the sidelines of a Naval Investiture Ceremony on Thursday, Admiral Dhowan said while the Navy intended to take delivery of the first Scorpene diesel-electric submarine, built under Project 75, in September 2016, it would also ensure that the intervening period between delivery of the remaining five was minimised.

Asked about the arrest of two people in an LTC documents forgery case involving 30 navy officials by the Central Bureau of Investigation (CBI), Admiral Dhowan said whenever such instances came to the Navy’s notice, it carried out thorough investigation and took decisions based on their outcome.

On the proposed government move to ramp up foreign direct investment (FDI) in the defence sector, he said it was the government’s call and the force would follow “whatever decision taken by the government”.

He said the Navy would host Prime Minister Narendra Modi on board the newly-inducted aircraft carrier INS Vikramaditya on Saturday. “We intend to take the PM on board the carrier and showcase various operational activities undertaken by it.”

Admiral Dhowan said the carrier was fully operational and its integral fleet of MiG 29 K fighter jets flown by Indian naval pilots fully integrated to the platform.

The Admiral said operating at sea was not an easy job, but despite the harsh working conditions, navy personnel always wore a smile on their faces. “We are proud of our officers and men.”

At the investiture ceremony earlier in the day, he stressed the importance of team work and training in operating complex platforms in multi-dimensional force.

The Admiral awarded unit citations to destroyer INS Ranvijay, landing ship INS Shardul, submarine INS Sindhuvijay and sail training vessel INS Sudarshini. Shore establishments Naval Ship Repair Yard (Kochi), air station INS Rajali, Naval Aircraft Yard (Kochi), and INS Kadamba, base depot of naval base at Karwar, also received unit citations.

Lieutenant Commander Shailesh Tyagi, a marine commando, was awarded Nao Sena Medal (NM) for gallantry for the second time; while Commander KM Arun Kumar and sailor Krishna Kumar were presented NM for gallantry.
 
.
first sub was to be delivered in 2013 then changed to 2014 and to 2015...nw 2016
 
.
Ya,,,, In 2015 another report would come out saying first Sub will be ready by December 2018...... F this why don't they buy the scorpene off the shelf , France is ready to provide anyway..
 
.
WTF? Barely six months back, it was supposed to be ready by mid-2015. :tsk:
 
. . . .
French should blamed for this
my point is... let it take time....why should these officials give dates and timelines...when they cant keep up...and look stupid in the end...
 
.
my point is... let it take time....why should these officials give dates and timelines...when they cant keep up...and look stupid in the end...

Its because of the freedom they get from Indian Government.... give a hit on the head ... they'll be fixed
 
.
I think the problem is with MDL in absorption of tech from the french . may be somebody can elaborate?
i think problem with France, do not forget that you are facing almost same problem with Rafale deal
 
.
i think problem with France, do not forget that you are facing almost same problem with Rafale deal
Well in that case, russian-indian deals are also plagued with delays. Its not just france.
 
.
Ya,,,, In 2015 another report would come out saying first Sub will be ready by December 2018...... F this why don't they buy the scorpene off the shelf , France is ready to provide anyway..
Have they recovered the USD 165 million of the kickbacks?
 
.
I think the problem is with MDL in absorption of tech from the french . may be somebody can elaborate?

It takes two to tango!

MDL built last sub in 1990s (German HDW), After that there sub lines are vacant without any order & the generation that was trained in sub construction is gone.

100% TOT absorption in high tech sub like Scorpene takes lot of time along with the French were shying from giving critical tech & were transferring the tech at snails pace.

No wonder it took time, but now, the next line of submarines can be totally indigenous.
 
.
It takes two to tango!

MDL built last sub in 1990s (German HDW), After that there sub lines are vacant without any order & the generation that was trained in sub construction is gone.

100% TOT absorption in high tech sub like Scorpene takes lot of time along with the French were shying from giving critical tech & were transferring the tech at snails pace.

No wonder it took time, but now, the next line of submarines can be totally indigenous.

I agree submarines are really hard to build. To be honest except Russia no one else builds a submarine in house.
 
.
Congrats. ToT part of the deal?
Dear
i have applied for spssc course in pak airforce.
they have initial tests first, i have idea about intelligence test but how can i prepare my self for avionics engineering test.
please help me??
 
.

Latest posts

Back
Top Bottom