What's new

Type 052D DDG News & Discussions

中国封锁仁爱礁半年内这是第一次有船突破封锁,上次两艘送建筑材料的被赶跑了,以前没有这么多军舰海警船时候,人家不是天天自由行?愿意哪天来哪天来,现在起码密密麻麻的菲律宾渔船没有敢来的了。看看船大小就知道了,这次他们船上竟然一堆记者,无耻呀,不好意思直接撞它,看下次他还能不能来了吧
治大国如烹小鲜,必须要谨慎而为之,反正岛就在那儿,菲律宾永远也拿不走,到了时候自然会解决的
 
China 3rd and 4th 052D DDG launched, next year will finish. 5th 052D shipbody building in shipyard.

3rd and 4th 052D DDG lauched, stay together
084711g573s4x7sow44ldv.jpg

084713g25zkry2z23232va.jpg

084717vhy34a46wya17xlw.jpg



5th 052D DDG building
084722e7g0h1gb7yuh9i0j.jpg
 
crazy speed:bunny:
 
172 Kunming and the 6th Type 052C 153 Xi'an behind

C4mAj44.jpg


From left to right, the 2nd, the 4th and the 3rd Type 052D.

qzAX3nP.jpg


The 5th is on dock and the 6th is in state of modules.

Henri K.
 
I want to hugs 052D, she's very beautiful
 
I wonder where is the port that 172 is docking right now.

mfTSEDS.jpg
This pic in QingDao, N.o172 052D will join PLAN East Sea Fleet. The delivery will be in this month.
 
This pic in QingDao, N.o172 052D will join PLAN East Sea Fleet. The delivery will be in this month.
I tend to believe DDG172 will join 2nd destroyer detachment,South Sea Fleet
 
I tend to believe DDG172 will join 2nd destroyer detachment,South Sea Fleet
News from CJDBY, to join PLAN East Sea Fleet.
 
News from CJDBY, to join PLAN East Sea Fleet.
Join 6th detachment?Umm,It's time for 133 134 to retire:undecided::undecided:
 
The planned volume production of 052Ds will be curtailed for 052Es and/or Type 055s。

:coffee::azn::enjoy:
 
2nd 052D DDG "N.o173" ready !

Pic of "N.o172" and "N.o173" together:
232433khhcdtc88tvzchca.jpeg
 
The planned volume production of 052Ds will be curtailed for 052Es and/or Type 055s。

:coffee::azn::enjoy:

Wait, what? So we won't see more and more 052D in the future because of 052E? But what will 052E improve from 052D? I thought 052D is the ultimate 052 Hull ship because of the limitation of the hull size.
 
Back
Top Bottom