سیالکوٹ لاہور موٹروے اگست 2019 تک مکمل ہو جاۓ گی
Lahore Sialkot Motorway to open up to Muridke Interchange soon. While the rest sections to be completed till August 2019.This is a not part of CPEC Projects
#Lahore #Sialkot #Punjab #Pakistan #Motorways
By the looks of the imagery i can only see the interchange of Muridke, the interchanges of Gujranwala, Pasrur, Daska, Sambrial/Sialkot dont even exist.
Sialkot Interchange under construction at Sialkot Wazirabad Road. 91 Km Sialkot Lahore Motorway M-11 under construction by Build-operate- Transfer (BOT) by FWO .It will be operational for traffic in Aug 2019.