What's new

Pakistan Air Force | News & Discussions.

Are the 12 block 2 targeted for 2018 dual seaters ??

If they are making it that means they are. The Image is recent and is from the visit of Chinese delegation at PAC Kamra and it clearly shows JF-17B being manufactured in the back ground. So the order for JF-17B has been placed and being constructed.

Full5.jpg


If you look behind the head of Chinese ambassador the number says 01 and there is another one in the back drop on the left of the Image being manufactured. So yes they have started the production of those 12 jets.

The Image date is 19 may 2018. So first one is almost near completion and we will soon hear the News of JF-17B being inducted.
 
The one in the background is standard single seater check straight vertical tail vs dual seater slanted vertical stabiliser

Plus 01 is the first dual seater which was transferred to pac for testing

This is not the test version. Test version are not parked in the construction facility. Kamra has runway and hangers away from production facility. These are the new ones being produced. I cannot say what version is the other one it is not clear from this image. I saw the single seat produced from the image of Core Commander Peshawar visited PAC Kamra.

here look at the latest single seat being produced. This is a ready for delivery jet.

Full6.gif


The test version has no 001 marking on the nose section.

JF-17B-08-692x360.jpg


No where it says 001 so that image is of the first being produced at Kamra.

JF-17B-3-720x357.jpg


Production of JF-17B has started at Kamra and first one is near delivery.

Here is another proof an Image of Saudis visiting PAC kamra few months early it also has a JF-17B under production in the back. Saudis have inspected the manufacturing of JF-17B twice this means Saudis are interested in the Jet.

This is image of the second jet in the first Image.

Full4.gif


This is a month older Image there are no landing gear and tail installed but in the recent Image they have been installed. So yes we are producing those 12 that had been ordered.
 
What will happen after first 150 JFT BUILD .for example are we going to get full right to produce entire airframe . What about shared avionics production etc. Does anyone have this data
 
What will happen after first 150 JFT BUILD .for example are we going to get full right to produce entire airframe . What about shared avionics production etc. Does anyone have this data
We already have full rights on the airplane.. we can build a golden toilet in it and paint the airplane pink.

We share production due to current lack lf equipment to produce all fuselage sections(with the required material) otherwise we have the right to build 100% of it.

The same goes for avionics, some of them are sourced from other countries as we do not have the capability to produce our own.

Otherwise, if it was a question of just rights and we had all the capability; we could produce 100% of the JF-17.
 
"Being Produced" are normally painted yellow, not the grey final paint scheme, besides serial number 01 points to the first prototype produced in china. the unit in pic looks like a complete unit.

JF-17B being Produced in PAC Kamra

Image date: 19 May 2018


Full5.jpg
 
"Being Produced" are normally painted yellow, not the grey final paint scheme, besides serial number 01 points to the first prototype produced in china. the unit in pic looks like a complete unit.

It is yellow in the intial stage but here it is beyond that stage you can see the avionic equipment already and seats there that means it is in the final stage. I cannot say what this actually is because it is only an image and all we can do is assess from it.
 
The grey paint comes on only after the flight tests are completed and jet is ready for delivery. If it is painted grey, then it is not under construction. May be opened up for inspection/learning/training

It is yellow in the intial stage but here it is beyond that stage you can see the avionic equipment already and seats there that means it is in the final stage. I cannot say what this actually is because it is only an image and all we can do is assess from it.
 
The grey paint comes on only after the flight tests are completed and jet is ready for delivery. If it is painted grey, then it is not under construction. May be opened up for inspection/learning/training

Now this image below says other wise. The jet is in grey paint

16762629922_7973410c69_b.jpg
 
Nigerian lawmakers justify 24 additions to 2018 budget

The adjustments are:

1. Augmentation to unity schools meal subsidy – N3,701,587,104.

2. Outstanding liability on exchange rate differential for 2015 & 2016 Bea ongoing remittances to 12 Bea countries (scholarship) – N3,265,720,064.

3. Rehabilitation of block C, D, G & H at the Headquarters and Lagos State office of Federal Ministry Of Industry, Trade & Investment – N1,207,942,115.

4. Construction of Kashimbilla/Gamovo multipurpose dam -N 2,000,000,000.

5. Strengthening public health against LASSA fever/other outbreaks: procurement and installation of incinerators, procurement of personal protective equipment, ribavirin and laboratory reagents and training of health personnel, construction of isolation ward at University of Abuja Teaching Hospital, Gwagwalada – N2,000,000,000.

6 Fast Power Programme Accelerated Gas and Solar Power Generation – N12,500,000,000.
7. Expansion and reinforcement of infrastructure in 11 distribution companies to reduce stranded generation capacity – N30,000,000,000.

8. Alternative energy development fund – N1,000,000,000.

9. Completion of headquarters building Federal Ministry of Women Affairs – N500,000,000.

10. Construction of 3000 capacity maximum security prison in Abuja (Phase I) – N6,031,862,972.

11. Procurement of 3 x JF17 Thunder aircraft – N12,792,939,682.

12. Security vote (including augmentation of shortfall in operational funds) for Nigerian Navy – N3,000,000,000.

13. Department of State Security – Pensions (including arrears) – N6,318,326,710.

14. Contributions to international organisations – N11,000,000,000.

15. Contingency -N2,800,000,000.

16. Military operation: Lafiya Dole & other operations of the armed forces – N3,000,000,000.

17. Subscription to shares in international organisations – N11,000,000,000.

18. SDG special projects – N38,000,000,000.

19. Contingency (capital) – N2,000,000,000.

20. Promotion, recruitment and appointment for Police Service Commission – N5,393,947,080.

21. Additional provision to some security agencies – N10,000,000,000.

22. Additional provision of N82billion on critical federal roads e.g. rehabilitation of Abuja-Kaduna-Zaria-Kano N10billion, rehabilitation of Lagos-Badagry-Seme road N4billion, rehabilitation/dualisation of Calabar-Itu-Ikot Ekpene-Aba-Owerri Road N7billion – N92,000,000,000.

23. Additional funds to new federal universities – N12,000,000,000.

24. National Institute for Legislative Studies (NILS) – N4,000,000,000.



https://www.premiumtimesng.com/news...kers-justify-24-additions-to-2018-budget.html
 
Good. This is as per blueprint. Toxic development.

Ra'ad ALCM mounted on center-line of PAF Mirage air craft.
Ra'ad ALCM, equipped with Nuclear Payload is meant to constitute air leg of Pakistan Nuclear Triad. As per future plans, Jf17 will be able to carry two Ra'ad 2 ALCM offering more range and twice fire power. https://t.co/KmffLHsJFk
View attachment 485096
 
Last edited:

Pakistan Affairs Latest Posts

Back
Top Bottom