The Raven
FULL MEMBER
- Joined
- Mar 31, 2020
- Messages
- 515
- Reaction score
- -11
- Country
- Location
its more plausible that we will have only block-3 with AESA and other stuff than upgrades to block-1/2 to 3 standard current production of JF-17-B1/2 will close and i thinks this production line will switch into block-3 production line with new stuff then tell me how we upgrades block-1/2 without production line and Pakistan can't afford to open another (2nd) line/infrastructure to upgrade block-1/2 and don't assume that Pakistan able to do this with block-3 production line, its need other infrastructure/line to upgrade all block-1/2 to block-3 standard
So now it's a problem of production rather than technical feasibility of upgrade?! From the very start, it was envisioned that by the time Block III aircraft production has been completed, the earlier Blocks I/II would be coming up to their first major overhaul/rebuild, and the production line would either be converted to overhaul/rebuild, or if there's still outstanding foreign orders for JF-17s, the MRF facility would be converted to overhaul of JF-17s, as the Mirages would probably have gone through their last major rebuild by then, if not completely retired. Seems like all you're doing is shifting goalposts simply to prove your wish that we don't upgrade earlier Block I/II aircraft.