The 'ToT' is often limited to constructing ships using OEM-supplied material kits. In other words, the steel, engines and other critical components all have to come from France. KSEW cuts the steel and constructs it, but it needs to rely on Naval Group/DCNS to provide the inputs. In all likelihood, DCNS isn't offering those inputs, or they're now too expensive. So the PN is now doing the same thing through China.
The first step to breaking this pattern is owning the design of the ship and empowering KSEW to engage core input suppliers directly. This way, it can keep constructing additional vessels, albeit with imported engines, steel, etc. But it can choose its suppliers, and in turn, control cost. This is what it's doing with the MILGEM from Turkey.
I understand and am quite a bit satisfied with your answer. But what is bothering that our economy in Musharraf Era was in quite a good shape and we could have afforded to manufacture 2 or 3 more subs in Pakistan. Regarding parts and components..Under ToT agreement Dcns or anyother french vendor is liable to provide us with the components that are required or help us with their local manufacturing..you very well know the western laws...else we could sue the hell out of them under breach of contract. Building subs locally maybe bit expensive at first but once their was a whole production facility...we could have gotten then for a mere fraction to the cost we have to buy the imported ones now. Besides modifying them accordingly just as we did now enabled them to carry babur.
would like to add that we have just ordered $5 billion worth of Chinese subs.....yeah..on soft loans....but building this agostas at home...even if the production plant costed $2billion or so...It should have been considered sincerly.I understand and am quite a bit satisfied with your answer. But what is bothering that our economy in Musharraf Era was in quite a good shape and we could have afforded to manufacture 2 or 3 more subs in Pakistan. Regarding parts and components..Under ToT agreement Dcns or anyother french vendor is liable to provide us with the components that are required or help us with their local manufacturing..you very well know the western laws...else we could sue the hell out of them under breach of contract. Building subs locally maybe bit expensive at first but once their was a whole production facility...we could have gotten then for a mere fraction to the cost we have to buy the imported ones now. Besides modifying them accordingly just as we did now enabled them to carry babur.