What's new

Mark 2 Tejas revealed . 1st Flight 2023

The Maverick

BANNED
Joined
Jan 4, 2016
Messages
1,728
Reaction score
-19
Country
India
Location
United Kingdom
1606666523983.png


The Prototype will be revealed in February 2022 at Aero India

At 17 tonnes its 4 tonnes heavier than the little brother Tejas MARK 1/1a

Tejas Mk2 – India’s upcoming indigenous Beast (defencexp.com)
This will replace both the Jaguar & the Mig29 once indiction starts in 2027 -2028
 
View attachment 691853

The Prototype will be revealed in February 2022 at Aero India

At 17 tonnes its 4 tonnes heavier than the little brother Tejas MARK 1/1a

Tejas Mk2 – India’s upcoming indigenous Beast (defencexp.com)
This will replace both the Jaguar & the Mig29 once indiction starts in 2027 -2028
too early for first flight, reasonable time frame for first flight of mark-2 will be in 2026-2027, because you have redesign whole jet from beginning, its unrelated to tejas development
 
India likes to create graphics rendering of non-existent platforms, plant fake dates next to them, instill magical powers to these renderings and declare as operational and the war is won..

more of the same is expected here.
 
They better find the market before production of these planes. Because its very hard to sell this plane to 3rd party having too many foreign parts and too many foreign countries involve. Engine is from US and US is not easy partner to deal with when comes to 3rd party buyers.
 
Currently in detailed design phase

The first prototype of MWF ‘roll out’ is scheduled for August 2022 with its first flight expected in September 2023. A total of four prototypes are being planned initially.
https://www.onmanorama.com/news/nat...ht-fighter.amp.html?__twitter_impression=true

GE secured the contract for the F414INS6 in 2010, testing beginning in 2014 by GE and the first two delivered to ADA in 2017
In October 2010, the F414-INS6 derivative of the F414 was selected to power India’s LCA Mk2 aircraft. First engine to test occurred in 2014. India expects to purchase up to 99 installed engines.
https://www.geaviation.com/press-re...gine-selected-power-south-koreas-kf-x-fighter

General Electric (GE) has delivered two qualified 414 engines to be tested on the planned home-grown Tejas Mk-2 single engine fighter
https://www.business-standard.com/a...es-collaboration-for-amca-117021401120_1.html

2500 Crores allocated(~$300+ Million) so far

LPI AESA Radar flying on one of the Tejas prototype vehicles (Project Uttam)

The engineering cockpit sim was unveiled early this year with a Side stick and LAD
 
Please get rid of those goofy wings in new versions.
 
Come back when you guys are flying the mk1a tejas and without even flying a working prototype of mk1a they are developing mk2 nice nothing but easy way to get funds for corruption but hey it's good for us in the end...

We dont need working prototype When we 20 Final operaional Clearance versions of Mark1 in service

Mark1a is the same fighter but added Aesa Radar and only new EW suite

You dont need an entire prototype for this






1606676087126.png


1606676132451.png


1606676662220.png


VERSIS MARK 2


Metal cutting for Tejas Mark 2 starting Feb 2021

$300 million dollars budget allocated for 1st Prototype development by 2023

Many elements from Tejas current fighters mark1 and 1a
 

Attachments

  • 1606674112465.png
    1606674112465.png
    1.5 MB · Views: 58
  • 1606676363471.png
    1606676363471.png
    1.9 MB · Views: 62
Back
Top Bottom