What's new

Making of Super Tejas

Why dont you indians decide what you really want ?

This is getting really absurd!! Everyday we hear new story about what indians are getting this time.

The plan is there. We just need another 2 decades to execute the plan. Hopefully everything would go as per the plan without any further delays.
 
.
Mk2 is medium class, similar to M2k. It'll need canards for better performance. Canards for Mk1/1A will be sort of overkill, so we went for other solutions, keeping control surfaces to an absolute minimum.


LCA is developed by ADA, which has more to do with DRDO, though not exactly. HAL only builds it.

ARDE (part of DRDO) makes unrelated stuff.
LCA is developed by ARDE & ADA & HAL not DRDO "only" as pakistanies quoted :haha:

Why dont you indians decide what you really want ?

This is getting really absurd!! Everyday we hear new story about what indians are getting this time.
indians have already decided kidd 40(MK1)+83 (MK1A) LCAs worry about pakistan :haha:

This has nothing to do with Saab.
Tejas Mk2 is confirmed by all sources. From low level to the highest level.
SAAB is behind this news ... IAF has already decided F16 BLK70/72 its single engined MRCA till 2030 its just mind games but you can diffr :cheers:
 
.
lol

the original model deosent even work and you want it to evolve ?

this defination atleast the original one flew . this one probly wont even take off
 
.
indians have already decided kidd 40(MK1)+83 (MK1A) LCAs worry about pakistan :haha:

Atfirst you post india is going to buy 110 f16s and now its back to tejas again!!!

Go back to defacting on a railway line bharati, your stench is overwhelming
 
. . .
Indians here are fighting each other over which version of tejas should they troll on.

Pathetic
 
.
Here is the schedule

LCA Tejas MK1 - FOC 2019 - 40 Fighters (Single GE 404)

LCA Tejas MK1A - FOC 2024 - 83 Fighters (Single GE 404)

Changes in bold.

LCA Tejas MK1 - FOC 2018 - 20 Fighters (Single GE 404)

LCA Tejas MK1A - No FOC - 103 Fighters (Single GE 404)

This is what's most likely to happen right now.

LCA Tejas MK2 - FOC 2030 - ~100 (Most likely twin GE 414)

LCA Tejas MK2 - FOC 2027 (tentative goal) - 201 (Most likely twin GE 414)
 
.
Nonononono... not more of this shitty named ugly plane... just more of my tax money down the drain.
 
.
Changes in bold.

LCA Tejas MK1 - FOC 2018 - 20 Fighters (Single GE 404)

LCA Tejas MK1A - No FOC - 103 Fighters (Single GE 404)

This is what's most likely to happen right now.

With the recent additional requirements included for MK1A theprogram is bound to get delayed which means the first 40 would be of MK1 only.

LCA Tejas MK2 - FOC 2027 (tentative goal) - 201 (Most likely twin GE 414)

This program is heavily dependent on the ToT from the MMRCA 2.0 which will run from 2023 through 2029.
 
.
With the recent additional requirements included for MK1A theprogram is bound to get delayed which means the first 40 would be of MK1 only.



This program is heavily dependent on the ToT from the MMRCA 2.0 which will run from 2023 through 2029.
So the first flight IS going to be in 2048! :lol:

I just don't get it? Why do indians post their crap here anyways? Do they actually like being laughed at and ridiculed? Seriously, do you indians suffer from some acute mental disorder or something? o_O
 
. .
Correct. AMCA will not be started until India has a 5th gen fighter deal. This only start after 2030.

There is no way AMCA will be ready by 2040. No way. Especially after India back out of PAKFA deal.

India is incapable of reverse engineering. It need to be spoon fed all tech.
 
.
There is no way AMCA will be ready by 2040. No way. Especially after India back out of PAKFA deal.

India is incapable of reverse engineering. It need to be spoon fed all tech.

Correct. Indian education system encourages people to learn things only by spoon feeding.

Short term Plan - FOC for Tejas MK1

Medium term plan - FOC for Tejas MK1A

Long term plan - FOC for Tejas MK2 (Super Tejas)

Very Very long term plan (desire) - FOC for AMCA

Except for Tejas MK1 FOC all other timelines are very very tentative and needs to be taken with a bucket of salt.

It would take a long long time to convert a three legged Cheetah to a four legged Cheetah.
 
.
There is no way AMCA will be ready by 2040. No way. Especially after India back out of PAKFA deal.

India is incapable of reverse engineering. It need to be spoon fed all tech.
oh no no no... there ij hole bery many chapterch on reberch enjaneerng in di vedas book of tillkinalijy. we make big reberch enjaneerngs on di tejas ujing di vedas. u chee, u chee i chay u bill chee.
 
.

Country Latest Posts

Back
Top Bottom