What's new

LCA Mk.2 Operational Clearance Not Before 2022 !!

And you say based on which stats ? Do you know the range of KLJ v2 ?
Yes 130 Km As As quoted in Sino Defense Forum No official Source Available So Neither you And I Contradict Each other
 
Yes 130 Km As As quoted in Sino Defense Forum No official Source Available So Neither you And I Contradict Each other

This matters ends here. Shows how much ignorant you are about JF-17. I suggest go read the JF-17 project director interviews of last two years and then make comparisons whether 140 Km range KLJ V2 BVR capable is inferior than 80 KM Elta-yada yada which still can't fire any BVR missile
 
This matters ends here. Shows how much outdated you are about JF-17. I suggest go read the JF-17 project director interviews of last two years and then make comparisons whether 140 Km range KLJ V2 BVR capable is inferior than 80 KM Elta-yada yada which still can't fire any BVR missile
EL/M-2032 air-to-air mode has a detection and tracking range of up to 150 km, the air-to-ground mode generates high resolution radar imagery of locations at up to 150 km, and air-to-sea mode can detect and classify naval targets at ranges of up to 300 km.

It Can Fire Aim-120 AMRAAM Its operated by T-50 Golden Eagle. To date, Elta Systems has integrated this radar system into F-4, F-5, F-16, Mirage and Mig-21

I Can Post Brochure If you want
 
EL/M-2032 air-to-air mode has a detection and tracking range of up to 150 km, the air-to-ground mode generates high resolution radar imagery of locations at up to 150 km, and air-to-sea mode can detect and classify naval targets at ranges of up to 300 km.

It Can Fire Aim-120 AMRAAM Its operated by T-50 Golden Eagle

I Can Post Brochure If you want

Which is all theoretical up till now. Tag me once IAF reaches those figures which Elta claims. Until then, it's better to brush up your knowledge about JF-17.
 
Which is all theoretical up till now. Tag me once IAF reaches those figures which Elta claims. Until then, it's better to brush up your knowledge about JF-17.
So does Chinese Bizzare Claims of Developing AESA Radar & Avionics Equals To West .Neither they Open It For Assessment Nor they Will
Like i Said To date, Elta Systems has integrated this radar system into F-4, F-5, F-16, Mirage and Mig-21 And Successfully
Imported to Various Customers Including China For Your Information
*Type 1473 - (the Israelis supplied EL/M-2032s to China in the early 1990s which was developed into the Type 1473). The tracking and engagement figures for the Type 1473 are provided by Sinodefense.

PS: I Should Better Trust F-16 then Chinese Products In Actual War
 
Last edited:
So Chinese Bizzare Claims of Developing AESA Radar & Avionics Equals To West .Neither they Open It For Assessment Nor they Will
Like i Said To date, Elta Systems has integrated this radar system into F-4, F-5, F-16, Mirage and Mig-21 And Successfully
Imported to Various Customers Including China For Your Information
*Type 1473 - (the Israelis supplied EL/M-2032s to China in the early 1990s which was developed into the Type 1473). The tracking and engagement figures for the Type 1473 are provided by Sinodefense.

PS: I Should Better Trust F-16 then Chinese Products In Actual War

Likewise, you should put trust on MKI than on LCA.
 
Well we will Matter of Fact is 19 LCA already in Serial Production We should Also Integrate New Facility to Increase Production
i was asking about mk2 induction,,,,realistically when do u expect it?
 
i was asking about mk2 induction,,,,realistically when do u expect it?
Realistically Is I don't Know Although IHS Janes Quoted that GE414INS6 Engines Will be Coming in September Hope ADA Learns From Its Mistake in Past
LCA MK2 will be with the public and private partnerships All Depends on Selection of Private Partner hope it will be TATA or L&T
 
LCA Mk2 is Scheduled to get Operational by Squadron By 2021-2022 Whats New Here
This is just a first dead line. Hal and ADA are habitual of giving atleast 2 dozen dead line. U am sure we will bs discuss ing thr IOC issues of lca MK2 Even in 2030.
 
They should stop wasting our tax money, enough already.
They should come forward and cancel this crap lca project like kaveri . atleast the kaveri team was courageous enough to accept their limitations and ended the project without wasting further time.
 
its not about trolling , you are free to search threads related to Tejas , its been over decade, we are listening about the Tejas .. wake me up when its operational ...
I was in class 1 when this lca program was started now even my son is in class 3. Lets hope iaf gets lca when my grand son completes his matric.
 
Delayed yes But Failure Not LCA Mk1 is Par with Any Fighter PAF operates Currently
Go and tell this to iaf who atae still conducting its trials and testing and havent yet issued FOC to this crap.
 
Go and tell this to iaf who atae still conducting its trials and testing and havent yet issued FOC to this crap.


It's doing BVR trials, only thing that is left is the air to air probe and quartz cone. The supply of which are delayed, IAF wont give FOC till those requirements are met.
 

Pakistan Defence Latest Posts

Military Forum Latest Posts

Back
Top Bottom