Instead of hoping for a 'stealthy JF-17' why not wish for the PAF to start a next generation, lightweight single engine fighter to complement the twin engine AZM?
Something to complement the AZM similar to F-35 and F-22 combination !!!
However, i would definitely love to see a Full Fledged Medium Weight Thunder. Take a time of 5 years, they can do it.
Block 3 could have been flying by 2016 but the drawback was matured advanced avionics such as AESA, HMD and some others. But as soon as these things became operational, we got a flying Block 3.
As for Block 4, the concern of avionics is not that high as it was for Block 3.
We should utilize our R&D to take the Thunder into J-10 and F-16 league, optimized specially for carrying missiles which are not possible for Light weight and most medium weight.
Example - CX-1, Multiple RAAD, HD-1 in numbers as well as C-802 and CM-400.
Having an A2A config similar to J-10 would be amazing
In the mean time, create an even stronger radar for a medium weight Thunder, by 2025, China will have far better options than Meteor in terms of RAMJET powered.
Having a even Stronger Radar similar to J-20, a far matured WS-10 or even a WS15 engine, along with even more advanced EW Suite and ECM, will make Rafale look like a sitting duck !!!
These fighters can in turn serve us for a v.long time as India itself intends to take rafale beyond 2050 (i.e if it survives even 2025
) .
One thing that will be required would be a heavy budget, for research as well as production. A single unit can cost easily upto $55-$66mn but it’s worth it.
On a whole different scenerio,
We can just stop Thunder program after Block 3 and just expect minor upgrades here & there,
But focus on a second 5th Gen project for Single engine, possibly light weight but a medium weight like F-35 would give you the balance between a 5th gen and Internal bay config, since light weight stealth fighter would have a very small bay (if it even manages to).
Currently, only rumoured at DAS17, UAE and Rosoboronexport, had talks to building a joint 5th Gen light weight fighter. No update on it afterwards.
Such a project would immediately attract investment from Gulf as well as Turks or Malaysia or even maybe Ukraine. That is if we keep the timeline short and aim to bring it to production by 2028.
On the other hand, we keep on going with AZM heavy twin engine which SHOULD be delayed till 2030-32 to stay updated on the advancements of major powers post 5th gen and then take steps accordingly so as to do a job one time but enough for long !!!
If we don’t intend to introduce another fighter program of a single engine, then either keep on going with Block 4, or even Block 5 BUT procure Off-The-Shelf 5th gen fighter from China for 2 squadrons. If possible, go after FC-31 or J-35 (let’s see what happens to the program as there is quite uncertainty surrounding the program these days, another prototype is rumored to fly by feb march 2020).
@Bilal Khan (Quwa) @JamD @Hodor @Syed Hammad Ahmed @Windjammer @araz @Mangus Ortus Novem @Signalian @aliyusuf @MastanKhan @seven0seven @Stealth