INS Vikramaditya to arrive in India early next year

INS Vikramaditya to arrive in India early next year

Aircraft-Carrier-INS-Vikramaditya-Indian-Navy-05.jpg


After a long wait When the Russian origin aircraft carrier INS Vikramaditya arrives in India early next year, it will not have two of its on-board weapon systems–a long-range surface-to-air missile and an air defence gun.

While the Navy hopes to install the air-defence gun within a few months after the warship’s arrival, installation of the missile system would take more time as it is still under development.

The 45,000-tonne aircraft carrier, originally known as Admiral Gorshkov, is currently undergoing trials at Barents Sea off Russia under the watchful eyes of a team of Indian Navy officers. It is expected to be handed over to India around November-December, a year behind schedule.

When the carrier arrives in Karwar in 2014, it will not have the AK-360 close-in weapon system capable of creating a protective shield around the ship by firing 6,000 rounds per minute.

In addition, the ship would not have the Barak long-range surface-to-air missile that is being co-developed by India and Israel for naval use.

Both the Indian Navy and the Defence Research and Development Organisation are involved in the Rs 2,606-crore development programme, which is scheduled to be
completed by 2015. “The CIWS (AK 360) will be fitted to Vikramaditya on its arrival. But the LR-SAM would be done only at the first refit of the carrier,” Vice-Chief of the Navy Vice-Admiral R K Dhowan said.

The reason for not fitting the CIWS, said an officer, was certain contractual obligations. Moreover, integration at the Russian yard would have shot up the project cost.

The LR-SAM is a different story. Once ready, the missile would be first fitted on to a Kolkata-class destroyer, which is being constructed at Mazgaon dock under Project-15 A. Only after installing the surface-to-air missile to a 15A ship will it be integrated with INS Vikramaditya. Delivery of the first Kolkata-class destroyer, however, is delayed.

The first of the three ships in the Rs 45,000 crore P-15A will be ready only in 2014, though originally it was scheduled to be delivered to the Navy by 2013 end, sources said.

Meanwhile, INS Vikramaditya crossed a speed barrier of 30 knots during the trial. Last year, the Kiev-class aircraft carrier failed to attain its top speed due a technical glitch in the propulsion system.

The trouble happened because of the use of low-grade Chinese firebricks in boiler insulation, instead of asbestos. This prevented Sevmash ship yard from handing over the warship to the Navy on December 4, 2012, as originally scheduled.

Link - INS Vikramaditya to arrive in India early next year | idrw.org

Seems like power is coming to IN.
 
. .
Unable to move on its own power and with only half of its equipment installed, this embarassment to India is heading straight for the scrap heap.


Even if it is pushed by other boats like your casino still your fake navy will not be able to scratch it.
 
.
Since the aircraft for the carrier are already inducted, the Carrier will probably take a few ore months after it comes to Indian shores. SO the target date is 2014 end then?

Why would it take a few more months? The carrier is ready, the aircrafts have been in squadron service for a year, both flying and ship crews have been trained extensively already. It should be ready to enter service as soon as it reaches India.

BTW these are the mig 29Ks, a highly modernized and carrier capable version of the venerable flankers:

MiG-29K-taking-off-from-INS-Vikramaditya.-Photo-Oleg-Perov.jpg


12_MiG-29KUB_main.jpg


MiG-29K-taking-off-from-INS-Vikramaditya.-Photo-Oleg-Perov.jpg


That's going to bring some serious upgradation to the IN's firepower.
 
.
what are the aircraft aboard that Carrier? are those ready yet?

Carrier wing is 16-20 mig-29K and 8 ka-28 ASW and KA-31 AEW helicopters.
Mig-29K is a new carrier borne version of fulcrum that will also replace su-33 in russian navy.Its roughly equivalent to Air force version the MIG-29SMT.
India's total order of mig-29k stands as 45,25 or so have arrived first squadron[black panthers] was activated in late 2011.They have been waiting for carrier and based at IN air station hansa i think.
 
. .