What's new

Indonesia Defence Forum

Turko-Azeri approves :turkey:

Just remeber about isis drone in marawi, it is effectivley stall philipines army to assault the city

Petir V-104 joined the Chat
500x300-1.jpeg


DYNAMIC TEST OF PETIR MISSILE STAGE III-IV
Wednesday, 6 November 2019

Lumajang, Wednesday (06/11/2019). The Research and Development Center for Alpalhan Balitbang Kemhan carried out a dynamic test for the development of stage III-IV lightning missiles at the Pandan Wangi Air Shoot Range shooting range, Lumajang. The dynamic test for the development of stage III-IV lightning missiles was witnessed by the Head of the Research and Development Center for the Alpalhan Balitbang Ministry of Defense Brigadier General Rosidin, M.Si (Han), M.Sc., Head of Research and Development Center for Research and Development of Balitbang Ministry of Defense Brigadier General Martono, Head of Datin Set Balitbang Kemhan Colonel Inf Fatih El Amin, S.IP., M.Sc., Head of Marine Research and Development Center for Research and Development of the Ministry of Defense, Marine Colonel (E) Aab Abdul Wahab, ST, MT, Marine Lieutenant Colonel (E) Novendri B, ST, from Dislitbang AL, officials within the Ministry of Defense, as well as the trial team from PT. Sari Bahari Malang.


On Tuesday night, November 5, 2019, PT. Sari Bahari, after the presentation, it was continued with a question and answer session by the dynamic test team. The implementation of the dynamic test for the development of the lightning missile prototype is the result of a collaboration between Balitbang Kemhan and PT. Sari Bahari.

The implementation of the dynamic test was preceded by remarks from PT. Sari Bahari and the Research and Development Center for the Alpalhan Research and Development Center for the Ministry of Defense then read a prayer together. The dynamic test aims to determine the development capability of seekers, autopilot systems, warhead fuze, and ejector system launchers and prove the performance of lightning missiles to achieve real capabilities in the field. This dynamic test was carried out in order to obtain input, so that the development plan and development of the rocket and missile technology industry could run well according to government policy. The current dynamic test program is an effort to reduce dependence on foreign defense equipment.

Source: https://www.kemhan.go.id/balitbang/2019/11/06/uji-dinamis-rudal-petir-tahap-iii-iv.html
Note: Old article, originally in Indonesian
 
. . . .
It never been equipped with towed sonar.

In other word partial MLM . But , i guess that was too much to ask for anyway . Not to mention changing a major lay out ship design was beyond our technical capabilities as of now .
 
. . . .
Wow they did it, I thought this is going to descend to the list of 1001 prototypes

Naah , this low tech thing was ment for a battalion comander and staff's operational ride . It had to be done and done it cheaply and in house . Soo much money wasted on foreign products that was within our mean of manufacturing prowess . Sooner or later that freebies activities going to be over and dealt with . And to be honest even the marines find it hard to justifying their penchant for 8x8 eastern product since pandur landed in the Pindad portofolios . Not to mention the Checzh excalibur next year planning to build and open their factories in indonesia . If they also came with the Tatra's support packages then we got all wheeled AFV covered allready to be honest . Time to move on the tracked platform and implement all of those plans ...

And god i can't wait to see those indian's subpar products get to the limelight and blow out in their faces like the Indoc####s shenanigan's do .
 
.
Wow they did it, I thought this is going to descend to the list of 1001 prototypes
Somebody in charge must have boldness to make initial order, just like Jusuf Kalla order 50 Anoa for the first time even thought it still prototype at that time, and now Prabowo do the same thing, hats up for them.
 
.
Somebody in charge must have boldness to make initial order, just like Jusuf Kalla order 50 Anoa for the first time even thought it still prototype at that time, and now Prabowo do the same thing, hats up for them.
JK was ordering a lump sump of 150 unit at once !! Hence why he always be seeing as Anoa's father figure . And that bring a litle conflict between ibu sri and SBY for a sometime . While Prabowo take maung order to a higher level with the lump sump of 600 unit in batches . Some people allready make a calculation that it would take atleast 5-6 year of production continuity provided no more unit were ordered anymore . But , with komodo , Anoa and maung it would be no brainer for let say pindad was allready bag a 15 year of secure contract .
One thing to note is Pindad's output capacity is very litle and abysmall in my book

# thanks to Nike for prorividing the correct amount 👍👍
 
Last edited:
.
Naah , this low tech thing was ment for a battalion comander and staff's operational ride . It had to be done and done it cheaply and in house . Soo much money wasted on foreign products that was within our mean of manufacturing prowess . Sooner or later that freebies activities going to be over and dealt with . And to be honest even the marines find it hard to justifying their penchant for 8x8 eastern product since pandur landed in the Pindad portofolios . Not to mention the Checzh excalibur next year planning to build and open their factories in indonesia . If they also came with the Tatra's support packages then we got all wheeled AFV covered allready to be honest . Time to move on the tracked platform and implement all of those plans ...

And god i can't wait to see those indian's subpar products get to the limelight and blow out in their faces like the Indoc####s shenanigan's do .
What are you talking about?
TATA Kestrel? Masih jalan tuh program?
 
.
One thing to note is Pindad's output capacity is very litle and abysmall in my book
Which is mostly because Pindad is adamant about going into every sector of ground defense manufacturing instead of focusing on one aspect of it. If the government is hell bent on having SOE dominance in indigenous defense manufacturing, the least they can do is divide Pindad into several business entities each focusing on a certain aspect of Land Weaponry. Much like what the Polish government did.
 
Last edited:
.
JK was ordering a lump sump of 300 unit at once !! Hence why he always be seeing as Anoa's father figure . And that bring a litle conflict between ibu sri and SBY for a sometime . While Prabowo take maung order to a higher level with the lump sump of 600 unit in batches . Some people allready make a calculation that it would take atleast 5-6 year of production continuity provided no more unit were ordered anymore . But , with komodo , Anoa and maung it would be no brainer for let say pindad was allready bag a 15 year of secure contract .
One thing to note is Pindad's output capacity is very litle and abysmall in my book

JK first order for Anoa is 150 units with value around 1,1 trillion Rupiah in 2007 and formalized in 2008, since then PINDAD starting to order more tools and production line for further order
 
. .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom