Just like the viper is a fighter aircraft and a car, Tejas can also be a fighter aircraft and a train! Its just a name.
That would be more appropriate for Train 18. This rake is capable of speeds of more than 200 Km/h.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Just like the viper is a fighter aircraft and a car, Tejas can also be a fighter aircraft and a train! Its just a name.
That would be more appropriate for Train 18. This rake is capable of speeds of more than 200 Km/h.
coming next is train 20 !I am sure we can find a better name for Train 18.
train
Name is excellent. Everything cannot be in shudh hindi.I am sure we can find a better name for Train 18.
I have been a proponent of Bullet train for india but now that we know train 18 can go as high as 200kmph, i dont think 250Kmph bullet train is sensible, its much costlier and speed difference isnt much. I think it would be better if we use that money for fast rolling train 18 and 20.
Or go for a higher speed HSR..
I have been a proponent of Bullet train for india but now that we know train 18 can go as high as 200kmph, i dont think 250Kmph bullet train is sensible, its much costlier and speed difference isnt much. I think it would be better if we use that money for fast rolling train 18 and 20.
Or go for a higher speed HSR..
It hardly matters.Another shitty named stuff. Should have a good catchy English name instead.
The average operational speed for HSR is 250 kmph and for train 18 its, like u said, 130kmph.You must realize that the average speed of HSR is 270 Km/h and for the Train 18 will be around 130Km/h because of the track and signalling technology used in HSR vs Semi HSR. Therefore the difference is still 100 Kh/h which IMHO is still huge. Do read up on the technologies used, its quite interesting. Also with local manufacture of shinkansen prices will also stand reduced. The maximum speed difference would be 350 km/h vs 220 km/h.
The average operational speed for HSR is 250 kmph and for train 18 its, like u said, 130kmph.
Both these trains are capable of much higher speeds. Which means we aren't limited by technology but by supporting infrastructure.
Im not saying that we have state of the art technology, what i mean is that tech isnt the roadblock for us in pursuit of high speed trains, infra is.
Which is why i think upgrading the tracks, signals and control department alongwith standardising train 18 is more suitable option, and later on we can go for HSR.
Infra upgrade shouldnt be put on hold only coz of HSR.
I didnt have this opinion 2 days ago, but now that we know Train 18 is capable of 200kmph, shouldnt we first strive to achieve 180-185 kmph operational from it as soon as possible?
Haha. Not everything. This is Train 18
That would be more appropriate for Train 18. This rake is capable of speeds of more than 200 Km/h.
I am sure we can find a better name for Train 18.
we need trains fast enough to reach from any one part to another within 12-16 hrs. (max)
If we can manage that both passenger and railway!
coming next is train 20 !
Yeah train 20 is delayed sadly cause the response to the Tender was lackluster. Once we have the technology for building Aluminium rakes, the speed should reach to around 250 Km/h. I think semi HSR on short routes and HSR aka shinkansen on the golden quadrilateral (after transfer of technology and local manufacturing) is the way to go along with upgrade of tracks and signalling system.
I have been a proponent of Bullet train for india but now that we know train 18 can go as high as 200kmph, i dont think 250Kmph bullet train is sensible, its much costlier and speed difference isnt much. I think it would be better if we use that money for fast rolling train 18 and 20.
Or go for a higher speed HSR..
250Kmph train would be pointless. We need a HSR network, with speeds of 350Km/hr.
You must realize that the average speed of HSR is 270 Km/h and for the Train 18 will be around 130Km/h because of the track and signalling technology used in HSR vs Semi HSR. Therefore the difference is still 100 Kh/h which IMHO is still huge. Do read up on the technologies used, its quite interesting. Also with local manufacture of shinkansen prices will also stand reduced. The maximum speed difference would be 350 km/h vs 220 km/h.
I do hope in time we get good names, however right now these names have been given in year of introduction viz Train 18 that arrived in 2018 and Train 20 that is slated for tests in 2020.I am sure we can find a better name for Train 18.