Read my Above post, if you still did not get, I will increase the font size:
IAF would have to be asked to lower certain aspects of their air staff requirements for the LCA, which at the moment were unrealistic.
And who said this? Did the report mentioned any person in position saying this? or is it IAF saying this on record? What makes you think that IAF is gonna accept a aircraft which does not meet the ASR,when it is spending 15 billion dollars on MRCA & PAk-FA? Wonder why then the IAF chief is on record stating the future IAF force structure would be made of SU30,MRCA & LCA.
LCA was meant to replace Mig-21. what do you think would have been the ASR? Stealth fighters? It is obvious that LCA would come with GE engine for the first batch,when ASR demands an Indian engine. Isn't that all a "lower ASR"? And what is the big deal in this. If IAF can consider F-18,F-16 & Gripen with American engines,i dont see why they should not take LCA with GE engines. The report is about the test engines having lower thrust than the production engines. The chap is talking about it nothing else. This aspect is known from the time development started,nothing OMG about it.
As far as ASR is concerned, IAF wanted strengthening of the wings to handle heavier missiles. ADA already re-designed the wings.And this requirement came in 2001-2002. This just proves that if IAF wants, it can get it's requirement fulfilled.