What's new

HAL Tejas | Updates, News & Discussions

Status
Not open for further replies.
Two squadrons of 20 jets have been inducted, while third one is due anytime now. They are all fully combat capable, unlike the paper plane LCA.

Go troll somewhere else.

anytime due now? 4 years have passed since last squadron inducted.
 
Desert Fighter re

You dont produce the avionics YOU LICENSE MANUFACTURE them.

Just like Indian License builds SU30MKI in India for last 10 years


Kits come in, You just assemble them, be truthful about it. Nuts, bolts majority parts come in from Russia.
 
Kits come in, You just assemble them, be truthful about it. Nuts, bolts majority parts come in from Russia.

Absolute Bull shit!!

Even the Al 31 FP turbofan is manufactured in India,and many avionic components were developed in India
 
If you don't know about issues holding certain project, it does make you ignorant though

Jealousy is calling 'LCA a paper plane' while his own country is yet to develop aircrafts on its own.
 
really??
produced by pac??

there was a chinese cutout and no one can understand what that reads.
it was claimed that klj-7v2 or whatever has a range of 130 km for 5 m2 which i feel highly unbelieveable as zhuk me of mig-29k has 120 km range and so has apg-69v9 desbite both of them being considerably heavier than klj-7

Old one for MK 1 has 105 km for 5 msq, MK 3 has 130 km for 5msq.

Tejas 150 km for 5msq in MK 1, in MK 2 it will have AESA with approx 200 km for 5msq.
 
You want me to put articles now? Shame many discussions occurred and you missed those. Like this one

Entire Sukhoi-30MKI fleet to arrive by 2019

Atleast know about your facts before jumping wildly in a discussion

From your own article-"For raw materials production to be commercially viable, India's aerospace companies would need to produce in larger volumes. That means they must become global suppliers, as a part of a major aerospace company's global supply chain. Licensed manufacture for our own needs does not create adequate demand," says Daljeet Singh, HAL Nashik's manufacturing head.''

And Pakistan produces these for its own?Titanium ? :lol:

The Su-30MKI contains not only Russian, French, South African and Israeli Customer Furnished Equipment (CFE), but also a substantial percentage of Indian designed and manufactured avionics. They took six years to develop from start to MKI. Advanced avionics were developed by DRDO under a project code named "Vetrivale" (a Tamil name for the victorious lance carried by the youthful Lord Karthikeya or Murugan, a son of Parvati and Shiva) in close collaboration with the PSUs and the IAF. Indian avionics have been received and acknowledged enthusiastically by the Russian principals.

The following are the components developed by Indian agencies:

  • Mission Computer cum Display Processor - MC-486 and DP-30MK (Defence Avionics Research Establishment - DARE)
  • Radar Computer - RC1 and RC2 (DARE)
  • Tarang Mk2 Radar Warning Receiver (RWR) + High Accuracy Direction Finding Module (HADF) (DARE
  • IFF-1410A - Identification Friend or Foe (IFF)
  • Integrated Communication suite INCOM 1210A (HAL)
  • Radar Altimeter - RAM-1701 (HAL)
  • Programmable Signal Processor (PSP) - (LRDE)
  • Multi Function Displays (MFD) - Samtel/DARE


The 32-bit Mission Computer performs mission-oriented computations, flight management, reconfiguration-cum-redundancy management and in-flight systems self-tests. In compliance with MIL-STD-1521 and 2167A standards, Ada language has been adopted for the mission computer's software. The other DARE-developed product, the Tarang Mk2 (Tranquil) radar warning receiver, is manufactured by state-owned BEL at its Bangalore facility.

These avionics equipment have also been certified for their airworthiness in meeting the demanding standards of Russian military aviation. The cumulative value of such indigenous avionic equipment is estimated to exceed Rs. 250 lakhs per aircraft. Since the core avionics were developed by a single agency (DRDO) - they have significant commonality of hardware and software amongst them using a modular approach to design. This obviously results in major cost and time savings in development; it also benefits the user in maintenance and spares inventories.

The DRDO has gone a step further and come out with a new design of the Core Avionics Computer (CAC) which can be used with a single module adaptation across many other aircraft platforms. Thus the CAC which is derived from the computers designed for the Su-30MKI will now be the centre piece of the avionics upgrades for the MiG-27 and Jaguar aircraft as well. The CAC was demonstrated by DRDO at the Aero India exhibition at Yelahanka and attracted a good deal of international attention. Taken together with the systems already developed indigenously for the LCA (such as the Digital Flight Control Computer and HUD), clearly Indian avionics have a significant export potential in the burgeoning global market for avionics modernisation.

The navigation/weapons systems from the various countries were integrated by Ramenskoye RPKB.

HAL will supply components to Irkut for 300 Su-30s meant for export to Malaysia and Algeria apart from those meant for IAF
 
Old one for MK 1 has 105 km for 5 msq, MK 3 has 130 km for 5msq.

Tejas 150 km for 5msq in MK 1, in MK 2 it will have AESA with approx 200 km for 5msq.

The nose cone radome of Tejas is another part that is expected to get a re-look. “Now the radome is made of composite materials and we will change it to quartz. Today we are getting a radar range of 45-50 km and we need to improve the same to 80-plus km with the new material,” the official said

Your Radar has not reached it's full capacity yet.
 
The nose cone radome of Tejas is another part that is expected to get a re-look. “Now the radome is made of composite materials and we will change it to quartz. Today we are getting a radar range of 45-50 km and we need to improve the same to 80-plus km with the new material,” the official said

Your Radar has not reached it's full capacity yet.

Is it about radar or nose cone ?

Ans-Nosecone
 
The nose cone radome of Tejas is another part that is expected to get a re-look. “Now the radome is made of composite materials and we will change it to quartz. Today we are getting a radar range of 45-50 km and we need to improve the same to 80-plus km with the new material,” the official said

Your Radar has not reached it's full capacity yet.

Range is range. If anything this just proves how stealthy the Tejas is! It bloody eats up it's own radar waves!
 
Status
Not open for further replies.

Latest posts

Back
Top Bottom