anant_s
SENIOR MEMBER
- Joined
- Aug 21, 2012
- Messages
- 5,600
- Reaction score
- 92
- Country
- Location
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Water tech is new but, only Vedic Tech made a transformation from Analogue to Digital!No water engine technology
you sound just like every one else on this forum. thats what the PAPERS say. you people are obsesed to think that im pakistani. CALM DOWN! im not only on pdf but also on ifd and sd and im. i am not pro Pakistani read my previous posts. moronYou sir sounds exactly like a pakistani. They are the only peoples in this planet who associate nuclear weapons with religion. 'Hindu Bomb' lol... Don't be ashamed about your country, be a proud british pakistani and fly a pakistani flag..
FINALLY!!!okay thanks for clarifying.
Finally the official burrial of so called mother of all deals.Thus ended the long n sorry saga of mmrca
naam barey aur darshan chotey
Hahah.LCA Mk II is coming??? If So Run for Cover JF-17
That tells us what how poor is your understanding of Technology transfer.Generally ToT means locally assembling hardware using the components provided by the supplier.
Production design:
For a high technology complex system like Su30MKI, The system design, production planning ans assembly is done in three phases of technology transfer, which is quite similar to automotive industry.
Phase I
The most complex part of manufacturing aircraft is the assembly process, or rather a smooth problem free assembly process. Hence in the first phase of ToT, training teams from russia train HAL final assembly staff in training cells and prepare the workstations rigs for assembly.
Then assembly fixtures arrive for installation in the assembly hangars and mock w/p are set up for dry runs
CKD kits from Irkut were flown to nasik division.
These ckd kits are assembled under Russian supervision where tech leads are trained by russian techs.
Pre-Phase II (In conjunction with phase I)
On conjunction to above , process, plating, avionics, machining, stamping, profiling, engine, electrical, hydraulics and landing gear work cells, are released the design data amounting to almost 50% of the subsystems
Planning department then streamlines the production schedule, and begins the early launch containment programs for each product line. End of the line testing workcell are established according to design requirements specified by the irkut.
Phase II begins.
Instead of CKD, only high technology complex subsystems are importedd from Irkut and on the assembly line HAL produced equipment is substituted, Quality checks at end of the line are the strictest possible. These subsytems in my experience are of even better quality that the russian sourced ones. Russian assembly technicians roles are reduced, with HAL techinicians taking over complete build schedule.
Phase III
This is the tricky phase where HAL tries to use it's resources for indigenous production of phase 2 subsytems, and bring in experts from russia for complete technology transfer for Phase 3 subsytems. This part is tricky because no manufacturer wants give out subsytems that are highly profitable and the designers tend to try and keep some level of interdependence. Albiet with successful deployment of phase 3, HAL gets into the position of successfully building the entire aircraft from scratch minus a few subsystems.
Don't believe what prestitutes says just wait and watch.But there are news that the ordinance would be dropped and states will be allowed to have their own land bill also
Their are news such as to please farm owners the indystrial corridor will be dropped from ppp mentioned in 14' bill and also will not come under 5 exempted projects to come under 14' bill and also industrial corridors will go through land acquistion according to 13' bill.
Also there were news like the bill will competely be dropped.
BJP did a blunder they should have passed it by force they dragged it for two long which have given opposition ample time to interfere in the bill and recommend their decisions. It was always understood that all the parties will not side with BJP on this bill.
lots depend on bihar election my friend.Hope this theory turns out to be true Land bill is very imp
Don't believe what prestitutes says just wait and watch.
lots depend on bihar election my friend.
When that technology is widely adopted then yes. It will be cheaper as wellLol then you are must be driving a water car.
Bhai jaan announcements tab hui hogi jab papu baba haggu karney gaye hongey... Nai toh no chance he hdBut the article claims that parrikar informed the 'house' when asked about it.
Mk 2 = IIHahah.
Nice joke . first get the LCA mk1 ready and get the FOC for it and then make tall claims about lca mk11.