What's new

2nd ship of India's new destroyer line, the Visakhapatnam-class, will be launched on Sept 17

.
Why is it always launch without bridge?


It's because of lack of infrastructure. As soon as the hull is completed, the ship is launched so that the bay can be utilised for keel laying and assembly of the next ship. Bridge can be integrated off the dock.

20 april 2015 :1st ship
17 sep 2016: 2nd ship
about 1.5 year for launching a next destroyer. pretty impressive for indian standard time:yahoo::yahoo:. kolkata took 3 -4 year for next ship of its class:)

Also INS Chennai of kolkata class is to be commissioned in 3rd quater of 2016:chilli::chilli:.
Great year for navy and make in india:smitten:

Yea all thanks to Modular construction being adopted across most shipyards. Our shipbuilding was in fact really slow in the past, I hope we improve further and churn out ships faster like China. The current infrastructure developments across all yards is a step in the right direction. Past 2020, we will see a major pace difference at which we will complete ships.

INS Chennai is expected on the 4th quarter this year.

INS Vishakpatnam is expected to be commissioned by early 2018 and the last in class to be delivered by 2022-24.

Good Day all!
 
. .
I would like to see double barrel Duet Twin AK 630M2 gatling gun on Visakhapatnam class.

Air Defence....
8x8 cell VLS
Barak-8 LR minimum 64 but later 132+

Anti-ship......
4x8 cell VLS minimum 32 missiles
BRAHMOS.

Next generation CMS.
Fully flushed front deck.
No antenna wires, everything must be embedded into structure.


Deadly destroyer will get even deadlier.
 
Last edited:
.
nisalibisdabbids.jpg
official crest of mormugao.

avyuICDUU.jpg

  1. Livefist ‏@livefist 36m36 minutes agoNoida, India
    Very significant: @IndianNavy & MDL attempting 68% indegenisation percentage in P15B destroyer line (P15A was 42%
  2. Livefist ‏@livefist 40m40 minutes agoNoida, India
    99% of hull-work on India's 1st indigenous Vikrant-class aircraft carrier complete, ready by Dec 2018: @IndianNavyDNFZ.jpg
 
. .
  1. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Something to be proud of - The Indian designed, made P 15B stealth destroyer. Second of its class to be launched.

    CsTuWPLWcAAp8zu.jpg



  2. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Some good news. Navy says 99% of hull work on the indigenous aircraft carrier being build at Kochi done. To be ready by Dec 2018. @ETDefence


  3. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Naval design bureau has designed 18 classes of vessels out of which 88 have already been built: Navy



  4. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Armed forces fall in line? Air chief Raha says Parrikar "seized of all the issues", Services satisfied with his response.



  5. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Big opportunity for private yards in P 15B. Ten of the 16 blocks outsourced to other yards: Navy @ETDefence



  6. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Navy: attempting 68% indigenization in the Project 15B project. Against 42% in last class. @ETDefence



  7. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    This is the first time we have built so many ships of a class, ten ships of 15, A & B class. Has helped in indigenization: Navy @ETDefence



  8. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Starting now, Navy briefing on launch of the second stealth destroyer of Project 15B. On Sep 17.

    CsTp-4KWAAE_xZ2.jpg

CsT8ocSVUAAW8XQ.jpg


CsT8ocPVUAUMJbn.jpg

CsT8ocQUkAAr4TK.jpg


CsT8ocSVYAIt-md.jpg
 
.
I noticed that too. It seem they usually have multi launches for a ship. India's indigenous aircraft carrier has 3 launch ceremonies already, but it won't be ready for sea trail until 2023 earliest. Maybe due to facility constrain at the port.
The carrier will be in sea trails in December 2018
 
.
  1. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Something to be proud of - The Indian designed, made P 15B stealth destroyer. Second of its class to be launched.

    CsTuWPLWcAAp8zu.jpg



  2. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Some good news. Navy says 99% of hull work on the indigenous aircraft carrier being build at Kochi done. To be ready by Dec 2018. @ETDefence


  3. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Naval design bureau has designed 18 classes of vessels out of which 88 have already been built: Navy



  4. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Armed forces fall in line? Air chief Raha says Parrikar "seized of all the issues", Services satisfied with his response.



  5. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Big opportunity for private yards in P 15B. Ten of the 16 blocks outsourced to other yards: Navy @ETDefence



  6. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Navy: attempting 68% indigenization in the Project 15B project. Against 42% in last class. @ETDefence



  7. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    This is the first time we have built so many ships of a class, ten ships of 15, A & B class. Has helped in indigenization: Navy @ETDefence



  8. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Starting now, Navy briefing on launch of the second stealth destroyer of Project 15B. On Sep 17.

    CsTp-4KWAAE_xZ2.jpg
CsT8ocSVUAAW8XQ.jpg


CsT8ocPVUAUMJbn.jpg

CsT8ocQUkAAr4TK.jpg


CsT8ocSVYAIt-md.jpg

It looks so beautiful:smitten:. Fine design
 
. .
  1. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Something to be proud of - The Indian designed, made P 15B stealth destroyer. Second of its class to be launched.

    CsTuWPLWcAAp8zu.jpg



  2. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Some good news. Navy says 99% of hull work on the indigenous aircraft carrier being build at Kochi done. To be ready by Dec 2018. @ETDefence


  3. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Naval design bureau has designed 18 classes of vessels out of which 88 have already been built: Navy



  4. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Armed forces fall in line? Air chief Raha says Parrikar "seized of all the issues", Services satisfied with his response.



  5. Manu Pubby ‏@manupubby_ET 1h1 hour ago
    Big opportunity for private yards in P 15B. Ten of the 16 blocks outsourced to other yards: Navy @ETDefence



  6. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Navy: attempting 68% indigenization in the Project 15B project. Against 42% in last class. @ETDefence



  7. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    This is the first time we have built so many ships of a class, ten ships of 15, A & B class. Has helped in indigenization: Navy @ETDefence



  8. Manu Pubby ‏@manupubby_ET 2h2 hours ago
    Starting now, Navy briefing on launch of the second stealth destroyer of Project 15B. On Sep 17.

    CsTp-4KWAAE_xZ2.jpg

CsT8ocSVUAAW8XQ.jpg


CsT8ocPVUAUMJbn.jpg

CsT8ocQUkAAr4TK.jpg


CsT8ocSVYAIt-md.jpg

Any Idea if this is built using modular constructions ? These Weld lines are horrible and have not been levelled out.
 
. . .
Any Idea if this is built using modular constructions ? These Weld lines are horrible and have not been levelled out.

AFAIK we haven't started modular construction yet. Nor i have seen any one talking about modular construction in vishakha. Alhogh one poster above quoted it to be modular @R!CK
 
. .

Latest posts

Country Latest Posts

Back
Top Bottom