The Hellenic Navy is procuring four Type 214 submarines to be known as the "Papanikolis-class". The first, Papanikolis, was built in Germany; the following three were scheduled for construction at HDW's Hellenic Shipyards in Greece.
In December 2006, StrategyPage reported that Papanikolis was found to have numerous technical problems.Among the reported problems with the submarine were excessive propeller cavitation, overheating of the air-independent propulsion system's fuel cells, and excessive rolling in bad weather when surfaced. Seapower magazine reported the Hellenic Navy refused to accept Papanikolis; additional problems noted were inadequate air-independent propulsion system output power, inappropriate periscope vibration, sonar flank array problems and seawater leakage into the ship's hydraulics.
The Hellenic Navy officers in charge of the testing program at the Kiel shipyards (Germany) made their case clear in a 2007 investigative journalism program called "Neoi Fakeloi" on Skai TV (Greece). Retired Rear Admiral M. Simionakis, who had been in charge of the Papanikolis program for the navy, told the interviewer that the manufacturer had made 2 attempts to fix a severe balance problem in the submarine, including shifting 21 tons of material from the top to the bottom, yet the vessel continued to heel as much as 46 degrees in sea trials. Photographic evidence of the severe heeling was presented. In the same TV program, the officer replacing Simionakis in Kiel, Capt. K. Tziotis, listed 7 ongoing, serious problems with the vessel, including balance problems when traveling on the surface, problems with the AIP system, problems with the weapon system, problems with the periscope, and problems with flooding.
For its part, TKMS, the German shipbuilder of Type 214, has asserted that it solved all the boat's technical problems in 2006 (before the interviews of the Greek officers mentioned above) and claims the Greek Navy's continuing complaints about the Papanikolis' technical condition are just a ploy to justify a price reduction. Therefore, TKMS has refused to deliver the boat to the Greek Navy until all debts are paid and the Papanikolis had been lying in Kiel harbor ever since 2006.
Despite this position by TKMS, the Hellenic Navy officers in charge of the submarine delivery have repeatedly stated there are problems with the Papanikolis. In October 2008, thePapanikolis conducted a new round of trials, which showed that the excessive rolling problem has finally been fixed. The rest of the problems are considered solved. According to the Greek defence press, acceptance of the vessel was imminent.
The second boat, Pipinos, was officially launched on 6 October 2014 and is at present going through Greek harbour acceptance trials in Elefsina.
On September 21, 2009 TKMS announced that the contract with the Greek Navy for all four submarines had been cancelled due to country's arrears of more than 520 million Euros. TKMS is now seeking arbitration to resolve the matter.
On October 27, 2009 the Greek Ministry of Defence officially confirmed that they intend accepting the three boats built in Greece. The first-of-class boat built in Kiel will not be accepted, and will be offered for sale. Proceeds from the sale will be used to pay the debt to TKMS.
In December 2006, StrategyPage reported that Papanikolis was found to have numerous technical problems.Among the reported problems with the submarine were excessive propeller cavitation, overheating of the air-independent propulsion system's fuel cells, and excessive rolling in bad weather when surfaced. Seapower magazine reported the Hellenic Navy refused to accept Papanikolis; additional problems noted were inadequate air-independent propulsion system output power, inappropriate periscope vibration, sonar flank array problems and seawater leakage into the ship's hydraulics.
The Hellenic Navy officers in charge of the testing program at the Kiel shipyards (Germany) made their case clear in a 2007 investigative journalism program called "Neoi Fakeloi" on Skai TV (Greece). Retired Rear Admiral M. Simionakis, who had been in charge of the Papanikolis program for the navy, told the interviewer that the manufacturer had made 2 attempts to fix a severe balance problem in the submarine, including shifting 21 tons of material from the top to the bottom, yet the vessel continued to heel as much as 46 degrees in sea trials. Photographic evidence of the severe heeling was presented. In the same TV program, the officer replacing Simionakis in Kiel, Capt. K. Tziotis, listed 7 ongoing, serious problems with the vessel, including balance problems when traveling on the surface, problems with the AIP system, problems with the weapon system, problems with the periscope, and problems with flooding.
For its part, TKMS, the German shipbuilder of Type 214, has asserted that it solved all the boat's technical problems in 2006 (before the interviews of the Greek officers mentioned above) and claims the Greek Navy's continuing complaints about the Papanikolis' technical condition are just a ploy to justify a price reduction. Therefore, TKMS has refused to deliver the boat to the Greek Navy until all debts are paid and the Papanikolis had been lying in Kiel harbor ever since 2006.
Despite this position by TKMS, the Hellenic Navy officers in charge of the submarine delivery have repeatedly stated there are problems with the Papanikolis. In October 2008, thePapanikolis conducted a new round of trials, which showed that the excessive rolling problem has finally been fixed. The rest of the problems are considered solved. According to the Greek defence press, acceptance of the vessel was imminent.
The second boat, Pipinos, was officially launched on 6 October 2014 and is at present going through Greek harbour acceptance trials in Elefsina.
On September 21, 2009 TKMS announced that the contract with the Greek Navy for all four submarines had been cancelled due to country's arrears of more than 520 million Euros. TKMS is now seeking arbitration to resolve the matter.
On October 27, 2009 the Greek Ministry of Defence officially confirmed that they intend accepting the three boats built in Greece. The first-of-class boat built in Kiel will not be accepted, and will be offered for sale. Proceeds from the sale will be used to pay the debt to TKMS.