What's new

Turkish Naval Programs

.
TN describes capabilities of Milden submarine as following;

- Integrated Sonar Fire Control System
- High Definition E/O Systems
- Latest Tech Periscope Tech
- LPI Radar
- Electronic Support system (COMINT/SIGINT)
- Inertial Navigation System
- Manned/Unmanned Underwater Vehicle Separation/Reception system
- Underwater SAT joint operation systems
- EHF/SHF band SATCOM
- Underwater IFF
- Floatable Antenna units
- Communication buoys
- Advanced Link Systems
- High power/capacity Battery systems
- AIP capacity power transfer systems
- Torpedo and Mine Counter Measure Systems
- Domestic submarine Mines
- Domestic Torpedos - Akya
- Domestic vertical launchable Land Attack Cruise Missile - Gezgin
@Horus Seems like the Turkish MILDEN submarine will have VLS.
 
.
G02Q9y.png


http://turkishnavyshipbucket.blogspot.com/2017/06/modern-turkish-submarine-force-and.html
 
.
Milden

milden.jpg


A digitally created rendering of Milden shown during the workshop. The end product may have a much different shape. Interesting to note that it has X type rudders a shrouded propeller. The thin line prodding form the aft of the submarine is like to house a towed array sonar or a towed counter measure. There is a provision for flank array sonar. The sail is streamlined and houses the forward diving planes.

https://turkishnavy.net/
 
.
Related projects with Milden !

-Roketsan guided missile tubes to be launched by submarines, designed to proceed on a planned route under the water to release Atmaca/related missiles !
-Roketsan supercavitating torpedoes
-Link connected Akya torpedoes for saturation attack on targets/update !
-Torpedo hard-kill system called Tork
-Torpedo soft-kill system called Zargana

Akya
akyax_zpsp7kurm8f.jpg
 
.
Related projects with Milden !

-Roketsan guided missile tubes to be launched by submarines, designed to proceed on a planned route under the water to release Atmaca/related missiles !
-Roketsan supercavitating torpedoes
-Link connected Akya torpedoes for saturation attack on targets/update !
-Torpedo hard-kill system called Tork
-Torpedo soft-kill system called Zargana

Akya
akyax_zpsp7kurm8f.jpg


thats not akya, dm2a torpedo. This picture is several years posted as akya:-), and will untill they reveal real akya.
 
. . . . . . .
I thought TF-100 and the I class were the same thing.

Another thing...it looks like second LHD will be built according to schedule.

It seems the projects are being shaped in acc to following displacement requirements...

Milgem:2300t
I class: 3000t
Tf-100: (must be a sinilar concept to xtf-4500): 4500t
Tf-2000: 7000t
 
.
Meko 200 track II will be upgraded !

The Barbaros class (4 Meko 200 track II ships) will undergo half life modernization program:
- Tacticos battle management system replacement by Genesis B-sys
- TAKS gun national fire control system integration

The first ship modernization delivery is scheduled for November 2020
 
.
Why the Tf-2000 and tf-100 begining in 2025-26... that's too much...
Why waiting so long...

Delivery date. Look at the date of the LHD, it says 2021, which is the delivery date.

It seems the projects are being shaped in acc to following displacement requirements...

Milgem:2300t
I class: 3000t
Tf-100: (must be a sinilar concept to xtf-4500): 4500t
Tf-2000: 7000t

Would make sense as the I-Class is only a lenghtend Milgem. TF-100 could be a "true" Frigatte.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom