Beta-Fighter
FULL MEMBER
- Joined
- Jun 12, 2015
- Messages
- 360
- Reaction score
- 0
- Country
- Location
For someone who believes, that a project cost can actually become "nil" as part of the developed technologies are utilized for other projects shouldn't really talk of "business" -- It is the "project cost of LCA" and treated as such, not the "project cost of developing infrastructure for future projects including such and such" when it becomes that comeback and argue, for now the cost has been incurred for lca project, so even if the developed technologies are used elsewhere, it cannot derive the "project cost of LCA" down to zero -- they might reduce the project cost of other projects, but unfortunately for you, not the LCA, and like I said project cost one way or another is a detrimental factor in the per unit cost, so now you have an aircraft project that has exceeded the project cost of Gripen, and none other then your own media is reporting it .. and count in the imported parts from different countries and LCA becomes any thing but "cost effective" --
cant argue, the person who don't know iota about program. The program sanction first for the development of the Aero technologies in India. Effect the knowledge gained from Tejas mission computer is used to design and develop Indian Mission computers in Su-30MKI , Sensors technology develop as a part of the tejas program used in all IAF now. OBOG technology develop on the part of Tejas program used in all IAF planes now.
Design and Testing infra develop as part of tejas will now work on 5th gen .
Just for your knowledge , tejas is also have naval Plane and trainer plane as part of it , which is not in Gripan.
what a great quote, those who ride will fall, suppose thats the motto of the airforce whose backbone has earned the nickname of "flying coffins" --
India test the birds limit and Fly on the go, response time you can judge from the fact that IAF plane manage to short down PAK Navy plane while PAF plane cant even get their engine started in Karachi ( few KM away)
as far as the JFT is concerned, no need to worry about it, its inducted and there were subsequent changes made after the crash including strengthening in different areas of the airframe etc. and from that point on it has went and performed in two major airshows around the world and is nearing an export order -- and where is LCA exactly ?? -- ahh yes, the "testing phase" ... where it has been for a good part of last 15 years after its first flight in 01...
that's what I said IAF don't take sub standard material like PAF , which after crash found faulty and strength etc . we take full baked things. BTW after that crash your AF don't believe on JFT , still relay on F-16.
thata why you ready to buy 2nd hand f-16 rather then your own plane
Only time will tell, right now LCA has been pretty much dissed by your own airforce who are more hopeful for the MK-II version with estimates of "ohh we'll have it in 2020 etc." and to think your the one talking of "half baked products" -- I mean you were going on about how the "cake is still baking" looks more like " the cake being baked is already been sentenced a bad rating by the head chef already" -- aside from that -- the fact is this
MKII is the development process, tell why you inducted the JFT when even it cant fly in night? Which AF want to fly the plane which cant drop laser guided bombs and fly in night?
Indians pride themselves with the lca being indigenous --- it is not
then even Chinese plane is not Chinese and Airbus and Boeing is not US and Gripen also not Swedish ?
Chinese plane uses Russian engines,
Airbus and Boeing software are made by India and also components
and Gripen plane engine is US?
PAK tank uses Ukrainian engine
So your logic is flawed, come with better logic. lol , height of hypocrisy.
with it being effective, the IAF's "confidence" in LCA is telling on that where it is openly saying that its more hopeful for MK-II --
the same reason despite your have super duper plane more advance then f-16 , you still love to buy 2nd hand f-16. IN MK-II technologies will leap ahead and have some 5th gen technology.
then you have your last argument of "ohh we developed infrastructure etc." and the hope that there would be any good thing from it --- thats the only thing you have left and only time will tell if it ends up in your favor or not ...
you have live example of Dhruv and its technologies used in LCH and you still buying LCH from china or turkey .
your JFT crashed and flopped in A2G ops that's why you removed from combat duty and you rely on f-16 to shave yourself from further embracement.On the other hand, the product that is not even in the discussion as the topic of the thread is LCA MKII, is the one being discussed by people like you -- so just for you, lemme just say, its inducted, it has actually flown and performed in A2G ops, its been inducted in the CCS and it is giving our airforce, a generation advantage over what its replacing --- while contending for export orders, with a much better version blk-II already in production and the much advanced version already on the cards ... so you don't need to worry about the JF-17, cant say the same about IAF though...
99% of people in India and other don't know fully about the project . project was started to develop the Aero space technologies IN India like space technologies. The technology developed in this are used by IAF in various plane, Like mission computer development knowledge is used un in SU-30MKI.Hi,
In my humble opinion if Aircraft build today doesnt work for tomorrow for the Airforce, It doesnt matter the show must go on.
The invaluable experience gained from project, must be used in other projects. Such wind tunnel, avionics, fabrtication and etc.
That is why projects have specific timeline. if the deadline is not met. One can always look into other projects and used the experienced gained form the project that was let go
IAF keep on changing the demands on behalf of Russian or foreign companies because once plane develop their bread and butter stopped.