so its basically china saying no to anything that may help pakistan overcome its difficulties. its like they want us to default on payments and everything.Minutes of 11th Joint Cooperation Committee (JCC) of the CPEC was released back in July 31, 2023. However when the bilaterally signed agreement was released earlier in September 2023 almost all of the agreed points in the July minutes were rejected by Chinese side. Following is brief summary of the developments which were agreed by Chinese in July JCC meeting but rejected in the meeting held in September.
1. China excluded cooperation in the areas of cross-border tourism in G-B, K-P and AJK and cooperation for promotion of coastal tourism from the final minutes of the 11th JCC
2. China also did not agree to Pakistan’s proposal for inclusion of Water Resources Management and Climate Change and Urban Infrastructure Development in the CPEC framework.
3. Islamababd wanted to change location of 300 MW Gwader power plant to Thar to use the local coal. But China did not agree to Pakistan’s text about the Gwadar plant,
4. The text related to the financial closing of 701 megawatts (MW) Azad Pattan hydropower project, 1,124MW Kohala power plant, and 1,320MW Thar Block 1 Shanghai Electric Co power plant was dropped from the final minutes. So These plants would not be operational as per original plan.
5. China also did not agree to a proposal to the inclusion of a 500kv transmission line from Hub to Gwadar to link the seaport city with the national grid in the CPEC framework.
6. China did not agree to “carry out joint studies for future development of Thar coal blocks, including development of mega power parks and power evacuation infrastructure, with a view to meet Pakistan’s energy needs from indigenous resources, conversion of coal into other products for domestic demand as well as exports.
7. China excluded the issue of financial challenges being faced by the power companies from the final minutes.
8. China also did not agree to the proposal for inclusion of 100MW KIU and 80MW Phander hydel power projects in the CPEC energy cooperation list and implementation through Chinese investors. China did not agree to the proposal of developing a policy framework for coal gasification to fertiliser projects based on Thar coal.
9. Similarly, there is no mention of the South-North gas pipeline project in the final minutes. The draft minutes had mentioned examination of feasibility study and Chinese cooperation for the purpose.
10. Pakistan had proposed Chinese participation in a strategic underground gas storage project but there is no mention of this mega project in the final minutes.
CPEC expansion plan in doldrums | The Express Tribune
China has not agreed to further expand cooperation in areas of energy, water management, climate changetribune.com.pk
...or being specific to gwadar power plant; they do not want a grid line, stretching all the way from 100s of kilometers to gwadar, that can be sabotaged.