What's new

Pakistan's Airborne Early Warning and Control Aircrafts

1.jpg
 
.
However it does not have the secure NATO datalink installed to effectively command western fighter aircraft such as American F-16. Therefore ZDK-03 operates together with Saab-2000 in a "high-low" combination in order to coordinate various Chinese and western made combat aircraft effectively.
Where do the mirages go, are they linked with Saab aewc or are they linked with zdk 03? Or are they not directly linked with aewc, but are guided by the ground based system.
 
.
Where do the mirages go, are they linked with Saab aewc or are they linked with zdk 03? Or are they not directly linked with aewc, but are guided by the ground based system.
There are no such ambitions for Mirages they need to be retired, they don't even have BVR and mostly do ground missions, there's no need for them to be data-linked.
 
.
There are no such ambitions for Mirages they need to be retired, they don't even have BVR and mostly do ground missions, there's no need for them to be data-linked.
Rose mirage are bvr capable and will serve till enough jf17 are available, with the priority being to retire f7 and older mirages
 
.
Rose mirage are bvr capable and will serve till enough jf17 are available, with the priority being to retire f7 and older mirages

ROSE-I with 7th sq bandits at Masroor at Karachi are BVR capable. Those with ROSE-II are at Rafiqui. The Mirages are the PAF's "testbed" so to speak and usually get kitted and tested out first for new systems.
 
.
ROSE-I with 7th sq bandits at Masroor at Karachi are BVR capable. Those with ROSE-II are at Rafiqui. The Mirages are the PAF's "testbed" so to speak and usually get kitted and tested out first for new systems.
Thanks for the info but doesn't answer my question about which system they communicate with.
 
.
Thanks for the info but doesn't answer my question about which system they communicate with.
Certain clues are available on this forum on what is being developed or is in progress. However, All ROSE mirages, along with the F-7PGs are currently running this system.. So how they communicate should be answered by looking at that system.
 
. . . .
bhai pehle question to mar lete

The first ZDK-03 (S/N 11-001) was delivered to PAF in December 2011. The 2nd (S/N 11-002) was delivered some time later. The third ZDK-03 (12-003) was delivered in 2013.
when will 4th ZDK-03 (12-004) will deliver?.
001
ZDK-03_001.jpg

002
ZDK-03.jpg

003
ZDK-03a.jpg

004

????????
Yaar it's not ZDK-03. If you care to read it, you 'll know that it's brand new chinese KJ-500 project with 3 fixed AESAs in static Dome.
 
. .
The first ZDK-03 (S/N 11-001) was delivered to PAF in December 2011. The 2nd (S/N 11-002) was delivered some time later. The third ZDK-03 (12-003) was delivered in 2013.
when will 4th ZDK-03 (12-004) will deliver?.
It has already been delivered, the fourth ZDK-03 and its hangar has been set up at Mushaf Airbase (Sargodha) as seen in the latest Google Earth imagery.
 
. . .

Pakistan Affairs Latest Posts

Back
Top Bottom