salamzz
do any one here have latest upadte regarding status of Chashma 3
that it is started or just paper work is going on?
.
and whats the status of KANNUP 2??
 
no one know about it ?? :blink:

What precisely do you want to know?

The preparatory infrastructure?
The core desgin and installation?
Integration into the power grid?

Each stage has its own parallel threads of work progressing.
 
What precisely do you want to know?

The preparatory infrastructure?
The core desgin and installation?
Integration into the power grid?

Each stage has its own parallel threads of work progressing.

just current status of these projects
as i have heard that KANUP 2 and 3 has been cancelled
and
status of Chashma 3
this project is formally started yet or just a plan yet
 
just current status of these projects
as i have heard that KANUP 2 and 3 has been cancelled
and
status of Chashma 3
this project is formally started yet or just a plan yet

Planning and design work on these projects and many others never stops within PAEC. The cancellations and restarts that you are referring to represent political considerations and other externalities, sometimes planned and sometimes not.
 
just current status of these projects
as i have heard that KANUP 2 and 3 has been cancelled
and
status of Chashma 3
this project is formally started yet or just a plan yet

Nothing is cancelled Sir,
These are nuclear deals and it is a very slow procedure. Wait for couple of months/years until something concrete is presented

We are negotiating with Chinese about Chashma 3 & 4 and hopefully that deal will be signed soon. KANNUP-2 will be following after Chashma 3 & 4 are finalized
 
Nothing is cancelled Sir,
These are nuclear deals and it is a very slow procedure. Wait for couple of months/years until something concrete is presented

We are negotiating with Chinese about Chashma 3 & 4 and hopefully that deal will be signed soon. KANNUP-2 will be following after Chashma 3 & 4 are finalized

hmm hope for the best
 