Mysteriously, after the crash of JF-17 in 2011, Program suddenly slowed down. 3rd squadron keep getting delayed, no sign of block-2. Block-2 is delayed almost a year.
All the static tests and 200 percent load test on JF-17 was done in mid to late 2012 but these tests were to be wrapped up before July-August 2012 so Block 2 production could start but that didn't happened
Something is definitely wrong behind the scenes.
And it's 1.5 years now after the crash, PAF still hasn't disclosed the probable cause of JF-17 crash which means bird strike theory propogated by usual insiders was a hogwash just like All SAAB's are safe theory was a hogwash.
And in recent interviews JF-17 project director ignored or avoided
http://www.ainonline.com/aviation-n...istan-jf-17-fighter-slated-block-2-upgradesto answer why 3rd squadron or Block 2 is kept getting delayed, which shows something is not right
Funding is not an excuse, PAF could have get more loan from China.