these 2 squad we induction was urgent to replace A5 and the new 50 block 1 and 100 block 2 with refuleing probe and other
new upgrades we all know and 150 block 3 total 350 JF17 is PAF target it will be completed till 2018 and by then we will have
100 J10B and 60 F16B52 and the best pilots who fly them.
That Bold part isn't happening any time soon!
There isn't any Magic wand solution in manufacturing such massive number. Things are very slow in real life, as each aircraft has to go through entire testing after leaving the production lines. Last but not the least any number over 150 would be ONLY possible if we don't get FC-20 and decide to enhance Thunder project to further horizons...but that won't be possible before 2018.