What's new

Japan poised to win India's bullet train deal: Nikke

JohnyD

SENIOR MEMBER
Joined
Mar 18, 2010
Messages
3,689
Reaction score
-15
Country
India
Location
United Kingdom
TOKYO: Japan is expected to win the right to construct India's first bullet train, after losing an Indonesian high-speed rail deal to China, the Nikkei business daily reported on Tuesday.

Japan will offer more than 1 trillion yen ($8.11 billion) in loans to construct India's 980 billion rupee fast train, according to the report.

Japan recently lost the bid to build Indonesia's first fast-train because Beijing provided a $5 billion loan without guarantees.



Tokyo was picked to assess the feasibility of building the 505km (313 miles) corridor linking Mumbai with Ahmedabad, the commercial capital of Modi's home state, and concluded it would be technically and financially viable.

Construction of the high-speed railway link will start from 2017 and will be completed in 2023, the Nikkei reported.

Japan poised to win India's bullet train deal: Nikkei - The Times of India
 
. .
What a preplanned disaster.

Indians are inferior beings. Such projects are not meant for inferior people like Indians. Indians should be happy with their slow shitty railways that they have.
Which state,NY ?
 
.
What a preplanned disaster.


Which state,NY ?

West coast. By the way, this project is not even signed lol and you guys are having orgasms. We also have planned HSR in Pakistan. Maybe we will have it before you guys.
 
.
@anant_s

Your views on this?

It will be the world's first broad gauge HSR or will it be SG?

Japanese have done a financial viability study so I am not concerned about the economics.

We also have planned HSR in Pakistan. Maybe we will have it before you guys.

Yeah like that supposed tallest skyscraper in Karachi that never happened. So many "plans" in Pakistan....still growing at below 5% and facing a severe energy and investment crunch.
 
.
It will be the world's first broad gauge HSR or will it be SG?
standard gauge. all HST systems are highly standardized today and owing to the fact that high speed dynamic and safety systems will require drastic bit of change (thereby increase capital cost), the proposed trains are all Standard gauge.
 
. .
Indians are inferior beings. Such projects are not meant for inferior people like Indians. Indians should be happy with their slow shitty railways that they have.

Like you are happy with your shitty railway with Chinese engine which failed in its first trial. We have the trains running at 200 KMPH already.
 
.
Japanese have done a financial viability study so I am not concerned about the economics.
what i have heard is that initial capital cost is INR 85,000 crores for Mumbai Ahemdabad line. (JICA study).
therefore even if Japan extends soft loan, it is more important to see what reports on return of investment say.
 
. .
West coast. By the way, this project is not even signed lol and you guys are having orgasms. We also have planned HSR in Pakistan. Maybe we will have it before you guys.
First u explain yr planned HSR in Pakistan. Even yr metro project was a disaster
 
. . .
First u explain yr planned HSR in Pakistan. Even yr metro project was a disaster

Temporary hurdles, with Chinese help we will overcome that soon.
Like you are happy with your shitty railway with Chinese engine which failed in its first trial. We have the trains running at 200 KMPH already.

It was in the past. Modern Chinese technology is equal to or even more advanced than Japanese donation you all are getting.
 
.
.

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom