What's new

Indian Navy Outgunned As China Launches Its Biggest Destroyer

Why you guys have to launch a ship with nothing on top? By the way, get Visakhapatnam finished first, which was started one full year earlier than China's 055.
Lol is kolkota is not n time Don't worry

can already see some gems in the comments section. India an exporter of arms?:rofl:
GT572Qn.png
Lol World Know about Chinese Quality :D:D
 
. .
Why you guys have to launch a ship with nothing on top? By the way, get Visakhapatnam finished first, which was started one full year earlier than China's 055.





Whatever you call them, just finish them on time. You guys should really get out of this "Hindu schedule" thingy, and try to finish something on time, for once.




Enjoy? More like depression for China's foes.
Brother, I think it must be Indians' black technology that the superstructure is fully invisible so we can't see it. I just see a boat. The starting point of this design is to confuse your enemy by disguising as a boat, so they can sneak raid you when you get caught off guard.

Are you talking about the boat started in 2003 and sitting in the dock for the next 10 years?
I heard the Vikrant already leaked.
 
.
Are you talking about the boat started in 2003 and sitting in the dock for the next 10 years?
All are all commissioned or Not It was first major project So IN took precaution also The delays in the construction programmer have been attributed to persistent design changes made by the Indian Navy to incorporate new weapons systems and sensors,also Failure by a Ukrainian shipyard to deliver the ship's propellers and shafts and the contract later being awarded to a Russian firm all were commissioned in 2014,2015,2016



Lol Visakhapatnam Laid in 2013 Launched in 2015 expected by 2018

And other INS Mormugao Laid in 2015 and launched in 2016 in 1 year that's fast


I heard the Vikrant already leaked.
I heard Chinese AC crashed with Trawler dented And suffered Hull breach :rofl:
 
. . .
All are all commissioned or Not It was first major project So IN took precaution also The delays in the construction programmer have been attributed to persistent design changes made by the Indian Navy to incorporate new weapons systems and sensors,also Failure by a Ukrainian shipyard to deliver the ship's propellers and shafts and the contract later being awarded to a Russian firm all were commissioned in 2014,2015,2016



Lol Visakhapatnam Laid in 2013 Launched in 2015 expected by 2018

And other INS Mormugao Laid in 2015 and launched in 2016 in 1 year that's fast



I heard Chinese AC crashed with Trawler dented And suffered Hull breach :rofl:
What's your definition of launch? Let it float in the yard and rot. You build the hull, and that's it. The outfit progress depends on the mood of miscellaneous foreign suppliers.

launched without upper superstructure, so impressive
I tell you it's invisible man! Believe it or not. Maybe convertible, who knows?
 
.
launched without upper superstructure, so impressive
Its the Main hull Other Fitting Will done The other will build in other MDL facility that Mandatory for All Including AC
What's your definition of launch? Let it float in the yard. You build the hull, and that's it. The outfit progress depends on the mood of miscellaneous foreign suppliers.

Main Hull Is Core structure of the ship it hardly takes 1-2 year to build Other structure And fitting Orginal Time was taken in sea trials Which 2 year long

Mood Lol Its military Contracts And It has clauses Under New DPP 2016 With Penalties
 
.
All are all commissioned or Not It was first major project So IN took precaution also The delays in the construction programmer have been attributed to persistent design changes made by the Indian Navy to incorporate new weapons systems and sensors, all were commissioned in 2014,2015,2016



Lol Visakhapatnam Laid in 2013 Launched in 2015 expected by 2018

And other INS Mormugao Laind in 2015 and launched in 2016 in 1 year that's fast

In India, delay is norm, and "on-time" is exception. The same excuse was given for LCA project. Do you guy even learn? By the way, the delay of the first Project-15A was largely due to your dependency on foreign equipment, like Barak-8.
 
.
In India, delay is norm, and "on-time" is exception. The same excuse was given for LCA project. Do you guy even learn? By the way, the delay of the first Project-15A was largely due to your dependency on foreign equipment, like Barak-8.

Barak-8 is JV go read about indian contribution

LCA is far ahead from JF-17 in terms use composites ,Weapons And Avionics

Lol Its can Fire HOBS CCM with HMDS And 3 gen DERBY BVR While JF-17 With 80 constructed can't

As for foreign equipment And Sensor It add Quality And Cutting Edge Technology To End product.Give me logic if Some how this compromise End Product performance Then what's problem
 
. .
Barak-8 is JV go read about indian contribution

LCA is far ahead from JF-17 in terms use composites ,Weapons And Avionics

Lol Its can Fire HOBS CCM with HMDS And 3 gen DERBY BVR

As for foreign equipment And Sensor It add Quality And Cutting Edge Technology To End product

Barak-8 is a JV as much as Mig-21 was a JV between Indian and USSR. Don't fool yourself. JF-17 has been in service for years, when LCA will have FOC? It was promised by the end of 2011.
 
.
Barak-8 is a JV as much as Mig-21 was a JV between Indian and USSR.
just Like J-20 is of Mig 1.44 Project

Don't fool yourself. JF-17 has been in service for years, when LCA will have FOC? It was promised by the end of 2011.
Even With 80 JF-17 constructed It has no capibility fire HOBS with HMDS What shame

You Give Pakistani Low end product While LCA can Do it on IOC stage :disagree:

We hand our airforce complete product Not Half baked Machine which rejected by its primary user itself
LCA is already production 5 already produced FOC achieved Practically With BVR test
 
.
Barak-8 is a JV as much as Mig-21 was a JV between Indian and USSR. Don't fool yourself. JF-17 has been in service for years, when LCA will have FOC? It was promised by the end of 2011.
They have serious problem in engineering integrations.

just Like J-20 is of Mig 1.44 Project


Even With 80 JF-17 constructed It has no capibility fire HOBS with HMDS What shame

You Give Pakistani Low end product While LCA can Do it on IOC stage :disagree:

We hand our airforce complete product Not Half baked Machine which rejected by its primary user itself
LCA is already production 5 already produced FOC achieved Practically With BVR test
LCA has only 400KM combat radius?
 
.
我希望国人可以保持沉默,和他们比有意思么?这不是我们的志向。
 
.

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom