What's new

Indian Economy-News & Updates

How is the plan?

  • Good

    Votes: 161 61.7%
  • Average

    Votes: 53 20.3%
  • Poor

    Votes: 47 18.0%

  • Total voters
    261
Jindal Rail Infra Ltd to start supplying head hardened rails in India

JSPL to become India’s first maker of Head Hardened Rails with total rail making capacity of 60,000 tonnes per month, of which 30,000 tonnes is head hardened rails. JSPL eyes Rs.3,500 Crore revenue from rail sector in next 3 years. The plant in Chhattisgarh, set up in technical collaboration with German SMS Meer Gmbh, has the capacity to deliver 30,000 tonnes of head-hardened rails per month.

More at link:

http://www.railnews.co.in/jindal-rail-infra-ltd-to-start-supplying-head-hardened-rails-in-india/


Comparing the life-cycle costs of standard and head-hardened rail

http://www.railwaygazette.com/news/...costs-of-standard-and-head-hardened-rail.html
 
.
Yes, these are from Stone India.
Schunk too is manufacturing Pantographs in India, mostly for Sub Urban Metro Trains.
Existing Am92 pantographs can be used upto 225 kmph.


Yup Dharakhoh - Maramjhiri stations are ghat section.
But this is because The King 12621/22 is still running behind a WAP 4. With Royapuram shed now having a large WAP 7 fleet, hope they upgrade link for Tamil Nadu Express to a WAP 7 (like they have done for GT) and hopefully an LHB rake
Regular link is ED/RPM WAP-4 says IRI website. But it can be any... People see 12621 often with WAP-7. 12622 was spotted a few times with WAP-7. But in the Rainy season, its necessary to fit bankers because there might be a WheelSlip.

The imported WAP-5s have Schunks.
 
.
Sections under commissioning/commissioned for electric traction in Financial year 2016/17

  1. Wadi yard
  2. Puntamba-Sarola
  3. Sarola-Daund (excl)
  4. Badnera-Walgaon
  5. Garudaballi-Parvatipuram
  6. Parvatipuram-Singapur Road
  7. Angul-Karejanga
  8. Garwa Road-Meralgram
  9. Barauni-Mansi
  10. Bhatni-Gorakhpur
  11. Gorakhpur-Domingarh
  12. Gonda-Basti
  13. Ghaziabad-Meerut City
  14. Ghaziabad-Moradabad
  15. Varanasi-Lohta-Janghai incl Phaphamau-Prayag-Allahabad
  16. Meerut City-Saharanpur
  17. Laksar-Haridwar
  18. Alwar-Rewari
  19. Dharmavaram-Gooty
  20. Dhumrikhurd-Ramtek
  21. Ib-Jharsuguda-Lapanga
  22. Coimbatore-North Metupalayam
  23. Kozhikode-Kannur-Charvattur
  24. Ramganj Mandi-Jhalawar
  25. Amla-Parsia
  26. Parsia-Chhindwara
  27. Sainthia-Rampurhat
  28. Andal-Sitarampur via Jamunia-Ikra & Sripur
  29. Khana-Sainthia & Rampurhat-Pakur
  30. Mansi-Katihar
  31. Bakhtiyarpur-Tilaiya-Manpur
  32. Meralgram-Renukut
  33. Basti-Domingarh
  34. Sitapur-Barhwal
  35. Katihar-Kumedpur-Mukuria & Katihar-Jhaua-Mukuria
  36. Kumedpur-Malda
  37. Pune-Daund
  38. Daund-Bhigwan
  39. Itarsi-Pipariya
  40. Wadi-Raichur
  41. Katni-Jabalpur
  42. Cheoki-Manikpur
  43. Guntakal-Dhone
  44. Ahmedabad-Mehsana
  45. Haridwar-Dehradun
  46. Rewari-Ringus
  47. Gondia-Nagbhir
  48. Nagbhir-Ballarshah
  49. Yeliyur-Mysore
  50. Mangalore-Panambur
  51. Udhampur-Katra
  52. Jammu-Udhampur
 
.
149ttuw.jpg

263ap7b.jpg

1yaf44.jpg

msizh1.jpg

2lo3o5t.jpg


14aiecw.jpg

Courtesy @SACHINBUDDHISAGAR from IRFCA forum.

Chennai :
This Daan Utsav, sponsor a Metro ride for poor children.

FOR A CAUSE:The organisers plan to take about 1,000 children from various orphanages across the city on a free ride.— File photo
If you can afford Rs. 100 for a child, it may end up giving her a once in a lifetime opportunity and happiness. As part of the joy of giving festival, Daan Utsav and non-profit organisation Bhumi have joined hands with Chennai Metro Rail wherein people can contribute Rs. 100 to sponsor a free ride for a child from Koyambedu to Alandur.
Sharada Krishnamurthy of Daan Utsav says, “A ride by the Chennai Metro Rail may not mean much to people like us. These are things we take for granted. In fact, many of us have gone just to take a selfie. But thousands of children from orphanages who would love to travel in it certainly cannot afford it. So, we planned this trip as part of the joy of giving festival.”
They plan to take about 1,000 children from various orphanages across the city for which Rs. 1 lakh has to be raised.
The rides will begin for children from October 2 when the festival starts and go on till December till they complete all the rides. Aarthi Madhusudhan of Daan Utsav says Rs. 100 is required as a ride from Koyambedu to Alandur and return will cost Rs. 80; another Rs. 40 for their travel to the station and back. “Apart from this, we have several other events planned as part of Daan Utsav which will be held from 2-8 October in various places,” she adds.
Officials of Chennai Metro Rail Limited (CMRL) say, they even have plans to give space in their stations to promote this campaign. “We want this campaign to benefit as many children as possible,” an official says.
People who want to make contributions can visit the following site:https://letzchange.org/campaigns/metro-rides-for-poor-children-in-chennai-this-daan-utsav-2016

http://www.thehindu.com/todays-pape...utsav-sponsor-a-metro-ride/article9082934.ece

@Abingdonboy @anant_s @PARIKRAMA @randomradio @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @Crixus @waz @WAJsal @Oscar @AugenBlick @Star Wars @GuardianRED @arp2041 @Aero @salarsikander
 
. .
Mumbai metro Line 3 work to begin in October

INDIA: Work on Mumbai metro Line 3 is due to begin next month, following the signing of six of the seven civil works packages in late August. The joint ventures for each works package are:

Package 1, Cuffe Parade – Hutatma Chowk (Rs29·9bn): Larsen & Toubro and Shanghai Tunnel Engineering Co;
  • Package 2, CST Metro – Grant Road (Rs25·2bn): Hindustan Construction Co and Moscow Metrostroy;
  • Package 3, Mumbai Central – Worli (Rs25·6bn): Doğuş and Soma;
  • Package 4, Siddhivinayak – Shitladevi (Rs28·3bn): Continental Engineering Corp, ITD Cementation and Tata Projects;
  • Package 5, Dharavi – Santacruz (Rs28·2bn): J Kumar Infraprojects and China Railway Tunnel Group;
  • Package 6, CSIA – CSA International (Rs21·2bn): J Kumar Infraprojects and China Railway Tunnel Group;
  • Package 7, Marol Naka – Santacruz Electronics Export Processing Zone (Rs22·8bn): Larsen & Toubro and Shanghai Tunnel Engineering Co.
The project is being promoted by the Mumbai Metro Rail Corp special-purpose vehicle, a joint venture of the national and Maharashtra state governments, with part of the funding coming from a JICA loan.

The 33·5 km north-south route will link Colaba with Santacruz Electronics Export Processing Zone via Bandra. There will be one at-grade and 26 underground stations, including interchanges with IR’s Western and Central suburban railways, the monorail, metro Line 1 and the future metro Line 2. Ridership is forecast at 1·4 million passengers/day in 2021, rising to 1·7 million in 2031.
http://www.railwaygazette.com/news/...ai-metro-line-3-work-to-begin-in-october.html

PS:- China , Russia and Japan.... all are a major part and will contribute the most in overhauling India's infrastructure.
@AndrewJin
 
. . .
Kashmir Railways brief of Project
USBRL Project (Udhampur Srinagar Baramula Rail Link)

1. Background :
usbrp.gif

With a view to provide an alternative and a reliable transportation system to Jammu & Kashmir, Govt. of India planned a 326 Km. long Railway Line joining the Kashmir valley with the Indian Railways network. The project has been declared as a Project of National Importance. Jammu- Udhampur- Katra- Quazigund- Baramulla Railway line is the biggest project in the construction of a mountain railway since independence. From Jammu to Baramulla, length of the new rail line is 326 Km. It passes through the young Himalayas, tectonics thrust and faults. The work is in various stages of progress in the balance length from Katra to Banihal ( 111 Km). .



2. Sections Completed

  1. The work on Jammu-Udhampur section (55 Km) has been completed and opened to public by Hon’ble Prime Minister in Apr’05.
  2. The work on Quazigund - Baramulla section (118 Km) has also been completed and section has been opened to public in three phases. The section from Anantnag to Mazhom (68 KM) was opened to the public by the Hon’ble Prime Minister on 11/10/08. The section from Mazhom to Baramulla (32 KM) was inaugurated and dedicated to the nation on 14.02.09.The section from Quazigund to Anantnag (18 km) was opened to the public by the Hon’ble Prime Minister on 28/10/09.
  3. The section from Quazigund to Banihal (18 Km) involving Pir Panjal Tunnel, the longest transportation tunnel in India of total 11.215 Km length has also been opened to the Public by the Hon’ble Prime Minister on 26.06.2013. The block section from Quazigund to Banihal is a part of Katra-Quazigund section of the project, wherein the alignment passes through the world’s most difficult terrain, both in terms of logistic and geological strata.
  4. Udhampur – Katra which is 25 Km long has been opened to traffic by Hon’ble Prime Minister on 4th July 2014.
3. Salient features of USBRL Project

The length from Udhampur to Baramulla is 272 km and has been divided into
four sections. The salient features of these sections are as under:
1.png



4.0 Present Status of the Project:

For the purpose of execution /monitoring , the work has been sub divided into the following four legs :-

  • Leg-1 : Udhampur –Katra (25 KM -Work completed and section commissioned
  • Leg-2 : Katra- Banihal (111 KM) – Work in progress
  • Leg-3: Banihal –Quazigund ( 18KM) -Work completed and section commissioned
  • Leg-4: Quazigund –Baramulla (118 KM) - -Work completed and section commissioned
This Project is, perhaps, the most difficult new railway line project undertaken on Indian subcontinent. The terrain passes through young Himalayas, which are full of geological surprises and numerous problems. The execution of the work in the balanced portion between the Katra and Banihal (111 KM) has been divided among three agencies as under:-

  • Northern Railway – 5 Km.
  • KRCL - 35 Km
  • IRCON - 71 Km.


5.0 Status of Important Bridge on River Chenab

Chenab Bridge

i. Introduction:
The Indian Railways has undertaken a mega project of construction of a new Railway line in J&K state from Udhampur to Baramulla, which has been declared a national project. The alignment is a culmination of large number of Tunnels and Bridges, which are to be implemented in highly rugged and mountainous terrain with most difficult Himalayan Geology. The alignment crosses deep gorges of Chenab River near Salal Hydro Power Dam, which necessitates construction of long span bridges. The configurations of steel arches have been selected on account of aesthetics, economy, and availability of local expertise and construction materials.
The Chenab Bridge, 359 m above river bed, will be the highest bridge in the world, and longest span for BG Rail line with arch span of 467 m.
2.png

3.jpg
4.jpg


Physical Progress on Chenab Bridge The bridge has been divided in four parts for construction point of view. These are :
A. Construction of Arch Portion (S-10 to S-70)
B. Construction of Viaduct Portion (S-80 to S-180)
C. Slope Stabilisation - Bakkal end and
D. Slope stabilisation - Kauri end

PIR PANJAL TUNNEL (T-80)

1.0 The Pir Panjal Tunnel is a work of Pioneering nature being the longest transport tunnel in India and may become a benchmark for more ambitious and longer transport tunnels in future. The quantum of work involves one million cum of under ground excavation. 11 Km. long tunnel is completely straight in almost N-S direction. Maximum overburden is approx. 1100m. Tunnel is at 440m lower level than road tunnel and will be much less vulnerable to snow. The single track tube has been adopted with side road for repair /emergency rescue. The clear 3m wide passage exists in the cross-section all along and extends outside the portals. Rising grade of 1% from south to the high point at Km. 159.134 followed by a falling gradient of 0.5% towards north end (for better constructability). Tunnel will be provided with properly conceived Ventilation, fire fighting and monitoring systems.

2.0 M/s. Geo-Consult RITES (JV) has been appointed as Design and Supervision Consultants for this project.

3.0 During selection of construction technology Tunnel Boring Machine (TBM) was not adopted because of following :-

o Heterogeneous geology soil near portals to Trap and quartzite in middle.

o Geology, with fault zones is also encountered.

o High squeezing anticipated in the middle zone with 1100m overburden. This will be accompanied by heavy water inflow (Karst) in the lime stone.

o High initial period is required for ordering design, manufacture and commissioning.

o Retrieval of TBM’s require a large cavern which delays the final lining activity.

o No bidder was prepared to mobilize two TBM’s.

o Required advance with one TBM is three times compared to NATM / drill-and-blast.

o Non-circular section can only be achieved by enlargement in case of TBM.

4.0 Adit & Shaft : 774m adit meets the main tunnel at 2750m and isolates soft-ground. The shaft with 12m dia & 55m depth isolates 600m north-end tunnel. These will also assist in the ventilation during construction and operation.

5.0 Features of NATM design and construction Process:

Geo-technical modeling includes rock classifications and impact of construction sequence. Actual design performed in the form of supports sheet during construction by designer at site. Instrumentation and monitoring is done to observe settlement and validation of the design. The steel ribs have been eliminated and lattice girders are used. These are lighter element and allow fore poling through them providing better safety and keeping the excavation profile to close tolerances. At any stage in the installed primary lining the actual stress level is known providing a real time tool to the designer to validate his design parameters. The geo-technical model showing presence of water, faults, different rock classes. The model enables identification of favored construction method-road header, drill blast. Permanent lining is being done concurrently while excavation is still on-going so that after the final break through, the tunnel is completed in 3 months. The finished cross section has been optimized in terms of area and shape. Assessment of tunnel stability during excavation is being done. Determination is done for additional support measures and to adjust the support and excavation sequences. Monitoring of deformation rate decides casting of inner lining. Optical targets, pressure cells strain meters, and measuring anchors are used.

6.0 Geological Features:

Rock units are mainly consisting of silicified limestone, andesite and basalt, quartizite and sandstone or limestone – shale intercalations, agglomerates shale and tuffs. Portal areas are situated in fluvioglacial sediments (soft ground). The general trend of mountain range and strike direction of bedding is NW –SE. The central areas of the Pir Panjal range show a distinct folding. Contacts between rock units are often faulted. Folding is common in central areas.

7.0 Salient Features of Pir Panjal Tunnel (T-80):

o Total length – 11km
o Adit – 774m, shaft: 55m depth, 12m dia.
o Maximum overburden – 1.10km.
o Tunnel Method : NATM (New Austrian Tunneling Method)
o Last estimate cost (2006) – 647 crores.
o Approx. 440m below existing Jawahar Road Tunnel (2.75km)
o Underground excavation : 10 lac cubic meter.
o Cross section Area : Excavation : 67 to 78 sqm, Finished Tunnel :48 sqm.
o Investigation Bore Holes depth upto 640m.
o 3m wide road in tunnel for maintenance emergency rescue and relief.
o High mid point and sloping in both directions for drainage
o Provision of system for ventilation, fire fighting and safety monitoring.
o Adit and shaft for parallel working, to be used for ventilation, maintenance and emergency relief during service.
o Extensive instrumentation for monitoring during tunneling.
o Consultant : M/s. Geoconsult-RITES (JV).

8.0 Many Firsts:

o The Longest Transport Tunnel In the Country (11km).
o Highest ‘Over-burden’ of 1100m.
o Deepest ‘Drill holes’ for Geotechnical Investigations 640m.
o First Large Scale use of ‘New Austrian Tunneling Method (NATM)’ in India.
o First Use of ‘Road header’ for ‘Tunnel Excavation’ in Railway Tunneling.

5.jpg
6.jpg


http://usbrl.org/brief.php

Status of Railway electrification ending last Financial Year
R.E. MAP 2016 a4.JPG.jpg
 
.
Surge Pricing for Rajdhani, Shatabdi and Duronto trains. Only 10% seats available at exiting fare rest will be costlier upto 50%. Govt. made a blunder. If the trend of tax terrorism continues then bye bye Modi govt. in 2019.
 
.
Mumbai metro Line 3 work to begin in October

INDIA: Work on Mumbai metro Line 3 is due to begin next month, following the signing of six of the seven civil works packages in late August. The joint ventures for each works package are:

Package 1, Cuffe Parade – Hutatma Chowk (Rs29·9bn): Larsen & Toubro and Shanghai Tunnel Engineering Co;
  • Package 2, CST Metro – Grant Road (Rs25·2bn): Hindustan Construction Co and Moscow Metrostroy;
  • Package 3, Mumbai Central – Worli (Rs25·6bn): Doğuş and Soma;
  • Package 4, Siddhivinayak – Shitladevi (Rs28·3bn): Continental Engineering Corp, ITD Cementation and Tata Projects;
  • Package 5, Dharavi – Santacruz (Rs28·2bn): J Kumar Infraprojects and China Railway Tunnel Group;
  • Package 6, CSIA – CSA International (Rs21·2bn): J Kumar Infraprojects and China Railway Tunnel Group;
  • Package 7, Marol Naka – Santacruz Electronics Export Processing Zone (Rs22·8bn): Larsen & Toubro and Shanghai Tunnel Engineering Co.
The project is being promoted by the Mumbai Metro Rail Corp special-purpose vehicle, a joint venture of the national and Maharashtra state governments, with part of the funding coming from a JICA loan.

The 33·5 km north-south route will link Colaba with Santacruz Electronics Export Processing Zone via Bandra. There will be one at-grade and 26 underground stations, including interchanges with IR’s Western and Central suburban railways, the monorail, metro Line 1 and the future metro Line 2. Ridership is forecast at 1·4 million passengers/day in 2021, rising to 1·7 million in 2031.
http://www.railwaygazette.com/news/...ai-metro-line-3-work-to-begin-in-october.html

PS:- China , Russia and Japan.... all are a major part and will contribute the most in overhauling India's infrastructure.
@AndrewJin

Mumbai Metro will become a shining example of Sino-Indian cooperation
 
. . .
.
हरे कृष्ण हरे कृष्ण,कृष्ण कृष्ण हरे हरे
हरे राम हरे राम, राम राम हरे हरे
09-09-2016

#Economy:The Govt plans to roll out the new indirect tax regime from April 1, 2017. GST, the biggest tax reform since Independence, will create uniform market for seamless movement of goods and services with one tax rate.

#Finance:India is expected to see net FDI inflows of USD 35 billion this financial year, which may fall short of the figure for 2015-16.

#Foreign portfolio investors are looking at France, Spain, and Denmark, and to some extent even Netherlands, where they can register their investment vehicles before they pump money in Indian equities. Ireland and Luxembourg seem promising for locations from where debt investments can be made in India.

#Mera Bharat Mahaan: Scripting success on the maiden operational flight of its heavy-duty rocket fitted with the indigenous cryogenic upper stage, India launched its advanced weather satellite INSAT-3DR onboard GSLV-F05 from the spaceport here.

भारत माता की जय
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom