What's new

Indian Air Force phasing out MiG-21s: Antony

Prometheus

SENIOR MEMBER
Joined
Mar 24, 2010
Messages
4,942
Reaction score
-7
Country
India
Location
India
NEW DELHI: The Indian Air Force (IAF) is gradually phasing out its older MiG-21 combat jets, many of which have been lost in crashes, parliament was informed Monday.

"The MiG-21 is a very old aircraft. It is now in the process of being phased out," Defence Minister A K Antony said during question hour in the Lok Sabha.

"The normal life of an aircraft is 30-34 years," he added.

The IAF currently operates a little over 200 MiG-21s. Of these, 121 have been upgraded to the Bison version and are likely to fly till 2017, an IAF source said.

The remaining 80-90 aircraft will be phased out in the next two-three years, the source added, requesting anonymity.

The IAF first acquired MiG-21.

Between 1966 and 1984, the Hindustan Aeronautics Ltd (HAL) built four variants of the aircraft, initially from completely knocked down kits and eventually from Indian-made components for a total of 658 planes.

In the mid-1990s, despite a series of crashes, the IAF decided to upgrade 121 planes of the fourth variant, the MiG-21bis, to the Bison category.

The complete phase out of the MiG-21 was also linked to the acquisition of new aircraft, the IAF source pointed out.

Towards this end, the IAF will induct two squadrons - 16 aircraft each - of the indigenous Tejas light combat aircraft (LCA) and another six squadrons of the plane within six years.

Then, the IAF will, by the end of April, complete its evaluation of the six jets contending for its order of 126 medium multi-role combat aircraft (MMRCA) in a deal worth $10 billion.

"If all goes well, we should be able to zero in on the winner within 18 months, with the first aircraft arriving about a year after that," the IAF source said.

Around the time production of the MiG-21 seized, the IAF had felt the need for a suitable replacement and made known its requirements for a LCA to the Defence Research and Development Organisation (DRDO).

The first LCA prototype flew in 2000 but there are still major glitches with its engine which are in the process of being ironed out.

Even so, the IAF is known to be not entirely happy with the aircraft, which is why is had ordered a mere six squadrons.

The delays in the LCA project prompted the IAF to embark on the MMRCA programmeIndian Air Force phasing out MiG-21s: Antony-Politics/Nation-News-The Economic Times
 
. . .
The remaining 80-90 aircraft will be phased out in the next two-three years, the source added, requesting anonymity.

Still 2 to 3 years? Is IAF willing to see another list of crashes blamed after poor maintenance? These planes have lived their life.. keeping them in the air for another 2,3 years would mean more accidents. It would've been good if these machines were grounded yesterday.
 
. .
Cant Believe a Country with a Defense budget of $30 billion plus stil operates a 2nd Generation fighter from the 1960-70s .

These migs should have finished by 1990 max.

Very bad foesight/management
 
.
Cant Believe a Country with a Defense budget of $30 billion plus stil operates a 2nd Generation fighter from the 1960-70s .

These migs should have finished by 1990 max.

Very bad foesight/management

Mig-21 Bison is of 3.5 generation caliber. The only mig-21 of 2nd generation were back in 1963-1965 when IAF acquired 12-14 Mig-21F.
 
. . .
BISON india will keep in its arsenal for some time - but mig-21 are gone .

its better for india as soon as they phase them out.

and induct lca and mrca to suffix the numbers
 
.

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom