^^ How about you guys provide sources and give credit to the original photographer?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
New Recruit
http://www.dnaindia.com/mumbai/report-spanish-train-talgo-leaves-mumbai-for-up-2210826"It is a nine-coach set. One coach will have oscillograph and another speed trial equipment, and the train will be pulled by a WDP4 or WAP 5 locomotive capable of pulling at speeds of 180kmph. The trials will test the stability of the train, its top speed in Indian track conditions and the emergency braking distance. It could herald a new era if the trials are successful,"
View attachment 305955
Train set coaches arriving at Izzatnagar for initial phase of trials at upto 150 kph
View attachment 305957 View attachment 305958 View attachment 305959 View attachment 305960
200 kph trials are slated for next month (June 2016)
http://www.dnaindia.com/mumbai/report-spanish-train-talgo-leaves-mumbai-for-up-2210826
Working
@Ankit Kumar 002 @Rain Man @Abingdonboy @Spectre @Roybot @ayesha.a @Ryuzaki
Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.For optimum performance we should have had stuck with full Talgo system, means its locomotive too. Also I am not sure how good EMDs will be. However WAP5 is all good.
View attachment 305955
Train set coaches arriving at Izzatnagar for initial phase of trials at upto 150 kph
View attachment 305957 View attachment 305958 View attachment 305959 View attachment 305960
200 kph trials are slated for next month (June 2016)
http://www.dnaindia.com/mumbai/report-spanish-train-talgo-leaves-mumbai-for-up-2210826
Working
@Ankit Kumar 002 @Rain Man @Abingdonboy @Spectre @Roybot @ayesha.a @Ryuzaki
Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.
Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.
yes test track is planned, but im not sure of ground progress.That cures my anxiety .
And one more question , there was a news that IR is planning an exclusive 20 km railway track only for such kinds of trials , any movement on that ?
Talgo has provided these coaches free of cost and borne the testing cost for these trials. If successful, India has proposed to manufacture these trainsets (RENFE TALGO 250) in India and eventually these will be used on Class A routes to provide upto 225 kph fast service where HST service is not possible.These Talgo coaches should be made in India, instead of importing.