What's new

IAF Rafale Spares, Engine Components, Meteors and Scalp missiles started arriving

. .
Wrong they were all detected as soon aa they took off (list to AM Hari kumar interview).
Only mistake on our side was we were expecting a night tine attack as per intel inputs.


They took off from Kamra AB nearly 170Kms away from the LOC toward Rajuri/Naushera. You saying that despite detecting PAF incoming party, there was no ADA from IAF? Do you even know what you are talking about and the implications it has for IAF?
 
.
No such thing. PL-15 is yet to enter service with PAF and it is inferior to Meteor.

This is not a development product so much faster induction. Plus because of urgency we are going to cut short all the previous procedures.
Like last feb when you get your rear end whipped, then come back and talk. Until then spare us your BS.
 
. . .
No such thing. PL-15 is yet to enter service with PAF and it is inferior to Meteor.
And how do you know??? PL-15 has AESA seeker whereas Meteor has no AESA seeker
Sorry I am not bothered with countering PAC intern/ LSE BBA/ Canada MBA level logic by sharing classified documents.
This shows you comes only for troll, instead backing up with source/links you always started troll/blabbering
 
.
Obviously whatever Indians have is just out of this world technology. The best of the best..

Su30mki was also called the raptor of the east but Indians have lost all faith in it and now all their hopes lay with rafales , even their PM was saying "If they had rafales, the outcome would have been different"-- offcourse im talking about 27th Feb 2019 confrontation.

Moral of the Story:-

Never take Indian BS seriously.
Take Indian BS seriously, it is necessary to repeat 27 Feb
 
. .
Looking ready and being ready are two different things.

ISEs would only be implemented after all have been delivered.

Yeah. You can continue to look at them until 2025.
na as per agreement these rafale will have arrive in late 2020/2021 but its takes years to develop tactics using them

Sorry I am not bothered with countering PAC intern/ LSE BBA/ Canada MBA level logic by sharing classified documents.
His PAC intern/LSE BBA/Canada MBA level logic is far far better than your CLASSIFIED/PHD level PATHETIC logic
 
.
First of all SCALP is not undetectable. It is a cruise misile and is similar in category than Raad 2 but shorter in range.

Secondly, meteor might be or might not be most advanced missile but the best part of meteor is its 2 way data link means it will keep on getting target update after launch but Rafael do not have two way data link with meteor hence the best feature of meteor is not available to IAF.

Whereas PL15 is comparable to Meteor and might have better performance than meteor atleast in some arena such as 100 km range active seeker.
100 km range active seeker?
 
.
na as per agreement these rafale will have arrive in late 2020/2021 but its takes years to develop tactics using them

No. They were suppose to be delivered by September 2022 before but now the schedule is delayed due to COVID-19. Add training and developing tactics on top of this.
 
.
na as per agreement these rafale will have arrive in late 2020/2021 but its takes years to develop tactics using them


His PAC intern/LSE BBA/Canada MBA level logic is far far better than your CLASSIFIED/PHD level PATHETIC logic
The israelis pressed the F-16 into war a few weeks after it was delivered- but then it was the Israelis with high calibre pilots and training.

India could do that as well provided it puts its best and brightest on those machines but it is likely that the IAF will prefer to stick to M2Ks and Mig-29s.
 
. .
5 years is too long for them to be operationally available for combat use, 6-12months max is all you need.

But they will not be delivered before September 2022 at the least. Add training and developing tactics on top of that.
 
.

Latest posts

Country Latest Posts

Back
Top Bottom