What's new

Fund Raising Status for Diamer Basha And Mohmand Dam

1400 billion - 1800 billion rupees are needed. Total donations are just 3 billion. How long that is going to take?
 
.
1400 billion - 1800 billion rupees are needed. Total donations are just 3 billion. How long that is going to take?
A long time. People who are willing to donate may not be able to do so instantly, they may have run into financial trouble, or are just waiting for their pay cheque to come in.
 
.
1400 billion - 1800 billion rupees are needed. Total donations are just 3 billion. How long that is going to take?

you dont need money in one chunk, if they can collect 5 billion in year one then they can start the work once work is shown then people will donate more and if govt's financial situation improves in next few years then they can take it on
 
.
1400 billion - 1800 billion rupees are needed. Total donations are just 3 billion. How long that is going to take?
No no..first of all the 1400 billion rupees figure comes from wapda model(available on wapda site) which is 25-75 equity debt model..it includes interest payment on debt too..the actual cost is less than 12 billion dollars

Second we dont need to build electrical part at all..look at tarbela after 50 years the electrical part is still not completed

Third even without electrical part bhahsa will contribute 5 billion units due to improve down stream production (5% increase in total production of pak electricity or 1000mw at 70% availability factore)..THE DAM PART ONLY COSTS AROUND 500 BILLION RUPEES
 
Last edited:
. .
None sense

100 Dollar per person is needed !!! Only
Population Size 200,000,000 (200 Million people)
100 x 200,000,000 = 20,000,000,00 USD (20 Billion Cost of 2 Dams)


The movement has to become a NATIONAL MOVEMENT

Similar to Terhreek-e-Pakistan


If we need to break the shackles of Enslavement we must have a national Movement for DAM

Donation_BankSep12th.png


Support your country by Donations :)

Pakistan will always come first !!!

From Qatar 10,000 Derham


Renouned Folk singer goes on Street to Street drive






-------------------------------------------------------------------
In pakistan Meal for 2 People, Mid-range Restaurant, Three-course 1,000.00 Rs.

Dam needs just 9,000 rupee pre person

Meals in 365 days 1095 Meals
Just need to redirect cost of 9 Meals to DAM fund for your share


COST OF FLAT SCREEN TV
40” flat screen TV ₨ 40,917 :big_boss: You see every one wants it or has it
38ee580a-8e54-48fa-8f0d-4ca6be5b4c29_3.57548f072dc4d4eb3833b7b2837c5f35.jpeg


OR DAM

Your share for DAM = Just 9,000 Rupee
21704419.jpg



Cost of 2 Pizza 1700 Rupee
Cost of 5.2 Pizza = 9000 Rupee your share of DAM fun
p_h_logo.png
 
Last edited:
.
Impose 1% dam tax on EVERYTHING.... you will have enough funds for three dams in five years time.


Somebody who is buying a Rs 40,000 tv will have to pay Rs 40,400. I'm sure those 400 ruppees won't hurt him that much but it will go a long way in collecting money for dam.


Someone buying a Rs 1500,000 car, will not feel a huge pinch if he has to pay Rs 15,000 more.
 
. .
i think even Ik collects 250 billion rupees it should be enough to build bhasha dam (this is the amount govt has committed in WAPDA plan B model which costs around 550 billion and has no electrical work in its first stage)

my guess is he will probably end up around 40-50 billion rupees..not nearly enough
 
.

What if Scenarios


  • If every Pakistani Donates 5 Rupees x 200,000,000 Population = 1,000,000,000 (1 billion Rupees)
  • If every Pakistani Donates 10 Rupees x 200,000,000 Population = 2,000,000,000 (Two billion Rupees)
  • If every Pakistani Donates 15 Rupee x 200,000,000 Population = 3,000,000,000 (Three Billion Rupee) ----- :pakistan::pakistan::pakistan: [**We have reached this point]


  • If every Pakistani Donate 20 Rupee x 200,000,000 Population = 4,000,000,000 (Four billion Rupees )
  • If every Pakistani Donate 100 Rupee x 200,000,000 Population = 20,000,000,000 (Twenty billion Rupees)

------------------------------------------------------------------------------------------------------------------------------

If every Pakistani Donates 1000 Rupees x 200,000,000 Population = 200,000,000,000 (Two hundred billion Rupees or 1.6 Billion Dollars)


If every Pakistani Donates 9,000 Rupees x 200,000,000 Population = 1,800,000,000,000 (1.8 Trillion rupee ~ 14.5 Billion Dollar)

If every Pakistani Donates 12,000 Rupees x 200,000,000 Population = 2,400,000,000,000 (2.4 Trillion rupee or 19.2 Billion Dollars )



  • Magic figure 9,000 to 12,000 Rupee or 100 Dollar per person

If Overseas Pakistani sent 1,000 Dollar so you can see how it helps !!


BOTTOM LINE : TWO OF THESE GET PAKISTAN OVER IF EVERY PAKISTANI DID IT

Two of these by every Pakistani does the trick not at once (can be paid in installment)
b90_7883a.jpg

b90_7883a.jpg



We can do it if right numbers are told to people how easy it is
 
Last edited:
.
i think even Ik collects 250 billion rupees it should be enough to build bhasha dam (this is the amount govt has committed in WAPDA plan B model which costs around 550 billion and has no electrical work in its first stage)

my guess is he will probably end up around 40-50 billion rupees..not nearly enough

First stage is the lake. Electricity production will come much much later. Electricity setup costs more than double of the lake.

Water storage is the urgency and lakes will meet that requirement.
 
.
First stage is the lake. Electricity production will come much much later. Electricity setup costs more than double of the lake.

Water storage is the urgency and lakes will meet that requirement.
yet even if the setup is not made an approximately 10 billion Units (5 billion units from dasu+ existing power plants) will be added

To keep in propsective this is more than NJ total production..

So one may ask why was NJ built first than at same cost...answer is poor plannig ,corruption that led to delays that increased the cost from 89 to 420 billion rupees
 
.
yet even if the setup is not made an approximately 10 billion Units (5 billion units from dasu+ existing power plants) will be added

To keep in propsective this is more than NJ total production..

So one may ask why was NJ built first than at same cost...answer is poor plannig ,corruption that led to delays that increased the cost from 89 to 420 billion rupees

Corruption is the only answer. Incompetency is a by-product of corruption.

Lakes (dams) and reservoirs are the urgent need.

Electricity projects are on-going and public can withstand load shedding as long as the industry is running 24/7.
 
.
What if Scenarios

  • If every Pakistani Donates 5 Rupees x 200,000,000 Population = 1,000,000,000 (1 billion Rupees)
  • If every Pakistani Donates 10 Rupees x 200,000,000 Population = 2,000,000,000 (Two billion Rupees)
  • If every Pakistani Donates 15 Rupee x 200,000,000 Population = 3,000,000,000 (Three Billion Rupee) ----- :pakistan::pakistan::pakistan: [**We have reached this point]


  • If every Pakistani Donate 20 Rupee x 200,000,000 Population = 4,000,000,000 (Four billion Rupees )
  • If every Pakistani Donate 100 Rupee x 200,000,000 Population = 20,000,000,000 (Twenty billion Rupees)

------------------------------------------------------------------------------------------------------------------------------

If every Pakistani Donates 1000 Rupees x 200,000,000 Population = 200,000,000,000 (Two hundred billion Rupees or 1.6 Billion Dollars)


If every Pakistani Donates 9,000 Rupees x 200,000,000 Population = 1,800,000,000,000 (1.8 Trillion rupee ~ 14.5 Billion Dollar)

If every Pakistani Donates 12,000 Rupees x 200,000,000 Population = 2,400,000,000,000 (2.4 Trillion rupee or 19.2 Billion Dollars )



  • Magic figure 9,000 to 12,000 Rupee or 100 Dollar per person

If Overseas Pakistani sent 1,000 Dollar so you can see how it helps !!


BOTTOM LINE : TWO OF THESE GET PAKISTAN OVER IF EVERY PAKISTANI DID IT

Two of these by every Pakistani does the trick not at once (can be paid in installment)
b90_7883a.jpg

b90_7883a.jpg



We can do it if right numbers are told to people how easy it is
You do realize that the 200 million also includes babies, small children, and people unable to work, right?

Lol.
 
.
Corruption is the only answer. Incompetency is a by-product of corruption.

Lakes (dams) and reservoirs are the urgent need.

Electricity projects are on-going and public can withstand load shedding as long as the industry is running 24/7.
Pakistan plan to switch to RCC build rather than earth filled(like tarbela) was in interest of time ..ironic...that was almost 16 years ago
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom