FWOOfficial

www.fwo.com.pk





Swat Motorway.............


Inauguration ceremony of Malik Ahmad Baba Allahdand Dheri (Chakdara) interchange at Swat Motorway was performed by Chief Minister Khyber Pakhtunkhwa Mahmood Khan and DG FWO Maj Gen Kamal Azfar on 9 July 2020. Both Chief Minister Khyber Pakhtunkhwa and DG FWO were briefed about the project in details. The work on the said project commenced on 1 Jul 2019 and completed within stipulated timeframe. Chief Minister Khyber Pakhtunkhwa appreciated the quality work and motivation of FWO teams for working round the clock. The interchange will facilitate the commuters by providing them the shortest access to the area thus reducing the travel time.


fb_img_1593628663801-jpg.646935



 
Last edited:
.
Isolation Hospital and Infection Treatment Centre (IHITC).


97751966_845238979299690_6320877007013937152_n.jpg




96286228_842751066215148_2605276184786763776_n.jpg




96286097_842750649548523_9201607663744450560_n.jpg





97146518_842750756215179_313645733456642048_o.jpg



With the ground breaking of much needed hospital on 26 March 20, FWO immediately mobalized all the resources with sheer motivation to construct the Isolation Hospital and Infection Treatment Centre (IHITC). It was a time when on one hand, the world had halted entire import and export under fear of pandemic growth while on the other hand, intra - country lockdown had restricted movement and transportation to the critical extent.

The 250 bedded state of the art hospital having prefabricated steel structure building equipped with all sophisticated allied facilities has been constructed by FWO in just 40 days with sole use of internal resources. The sullen spells of torrential rains during limited construction period added further difficulty for the construction teams but couldn’t affect professionalism and morale of FWO engineers and workers. It is worth mentioning that the entire work was executed ensuring best health safety measures described by the Government as anti COVID-19 SOPs. DG FWO made frequent visits to the site to inspect, guide and motivate FWO teams working round the clock for this national cause.

To monitor live performance, FWO installed live monitoring cameras to monitor the work site.
We acknowledge the efforts and pay special gratitude to all our under mentioned partners including consultants and contractors who stood by us and worked round-the-clock with FWO to accomplish this gigantic project within stipulated time.



 
Last edited:
.
FWOOfficial

Chairman WAPDA Lt Gen (retired) Muzammil Hussain and DG FWO Maj Gen Kamal Azfar visited Diamer-Basha Dam project site on 27 June 2020. Chairman WAPDA was briefed by officials at the site regarding mobilisation of plant machinery and technical staff along with commencement of physical activities of dam construction. Chairman WAPDA expressed his satisfaction on the progress of work. Members of civil administration Gilgit-Baltistan along with representatives of WAPDA & Power China/FWO Joint Venture were present during the visit.





Joint Venture Agreement Signing Ceremony between Power China Company and Frontier Works Organization for construction of Diamer-Bhasha Dam was held at HQ FWO on 21 May 2020. 5 x members delegation, headed by Project Director Mr. Jiang Ruijun attended the ceremony. The project includes construction of diversion system, main dam, access bridge and 21 MW-Tangir Hydropower Project.

#FWO #Construction #Diamer-Bhasha #Dam #PowerChina #Bridge #21MW #TangirHydropowerProject.

 
Last edited:
. .
Jagran river is a tributary of Neelum River, which confluences with it at Kundal Shahi in AJ&K. A number of hydropower schemes have been identified on Jagran River out of which JHPP-1 (30.4 MW) is operational and JHPP-2 (48 MW) is under construction by FWO-HMC-CNTIC-BITC JV.

The project is being financed by Power Development Organization AJ&K. FWO is undertaking civil works of the project which includes Weir structure, De-sander, 5Km tunnels, Surge Tank, Vertical Shafts and a Power house. Presently work is in full swing on all components of the project simultaneously & 1.85 km tunnel works have been completed.
On 22nd March 2020 an important landmark activity has been achieved by diverting Jagran River into 190 m long diversion channel which was created by cutting into rock and boulders. The construction activities for Weir stage-1 will now be started.




90271301_809427186214203_3928554350258946048_n.jpg




90737245_809427286214193_2692238805695463424_n.jpg




90264591_809427506214171_8027831374201225216_n.jpg
 
.
Swat Motorway

. The chief guest was briefed about progress of work on the complete Swat Motorway project in detail. Director General FWO was also present on the occasion.
Work on the interchange commenced on 1 July 2019 and was completed on 30 June 2020. The 5 kilometres long interchange consists of 4 ramps, 4 loops, one cross road and a flyover. The Chief Minister appreciated the quality of work executed by FWO team. The interchange will facilitate commuters through better traffic management and smooth flow of traffic at this location





107628623_2648850892050095_8766401314518058055_n.jpg




108300173_2648850938716757_5633572886505840816_n.jpg





109213236_2648851042050080_8397231643446714162_n.jpg
 
.
Lakpass Tunnel project was completed by FWO in two just years duration back in November 2008. This route connects Quetta with Southern Balochistan, Gawadar, Karachi and also with Iran through N-40.

FWO has been entrusted the responsibility of O&M of Lakpass Tunnel / Toll Plaza and keep it open for public throughout the year. Before construction of Lakpass Tunnel, old road was being used having a very steep gradient which was very difficult specially for loaded vehicles.

For providing road with good riding quality, FWO is relaying ACWC overlay on approaching roads of Lakpass Tunnel on fast track. Currently work is in full swing and will be completed by end of July 2020.






109497342_2653062848295566_5826116782668376773_n.jpg
 
.
FWO is working on widening & improvement of Jaglot Skardu Road project (JSR). Length of road is 160 km. The widened & improved road will play a significant role to bring economic development & social benefits to residents of Skardu on its completion. JSR will be of vital importance in providing access to tourism sites and easy access to health facilities. Despite being landslide prone area, unfriendly weather, and harsh environment, FWO is performing up to the expectations.



111776637_2897109910416688_2090129514978894856_n.jpg
 
.
Bannu Road dualization/rehabilitation project .
This was awarded to FWO by NHA in 2018. A 75km old route between Bannu & Lachi that connects Domail to Khrapa via Banda Daud Shah and Latamber.
An alternate/shorter route for population of Bannu and North Waziristan to Kohat..



107979597_2899778220149857_4524682548607935048_n.jpg





115990059_2899778316816514_8977097162568334316_n.jpg






110173241_2899778413483171_6567621370792048790_n.jpg





109956540_2899778510149828_7615327476269111062_n.jpg
 
.
Diamer Basha Dam (DBD) Project

Just so you people don’t forget, FWO-PowerChina JV is working on DBD construction. We are really proud of our personnel hailing from Gilgit Baltistan (GB) who are working on this project. InshAllah we shall try to hire more people from GB in days to come.


 
.
*Karachi Drains Clearance Operation 2020 - Kausar Colony Culvert*

It was reported to us that floating garbage (due to ongoing rain spell) had accumulated on upstream side of the culvert at Kausar Colony yesterday evening.
This happened due to smaller sized passages under the culvert and encroachments on the drain itself.
Although water was still passing through it yet FWO team went to work and cleared it today.



 
. . . .
After completion, it will be the world’s highest and largest roller compacted concrete (RCC) dam project, known as Pakistan’s “Three Gorges”.

The 272 meters high Diamer-Bhasha Dam will become another large hydropower project in Pakistan after Tarbela and Mangla hydropower projects, Professor at the Chinese Southwest University of Political Science and Law Cheng Xizhong said

He said on July 23, Asim Saleem Bajwa, Chairman of CPEC Authority, announced that the construction of Diamer-Bhasha Dam, a large hydropower project with historic milestone significance, has started.

Construction of the dam will be jointly undertaken by Power Construction Corporation of China and Frontier Works Organization (FWO) of Pakistan. It is planned to be completed in 2028 with a total installed capacity of 4.5 million kilowatts, which can deliver 18 billion kilowatts of electricity to the state grid every year.
 
.