What's new

Dam Construction in Pakistan

UNDER CONSTRUCTION DRAINAGE PROJECTS

Right Bank Outfall Drain Project-I
Location:
Project area lies within Larkana, Kamber, Dadu & Jamshoro
Districts of Sindh.
Date of completion:
Proposed 30-06-2012
rdod.JPG

rdod1.JPG



Balochistan Effluent Disposal Into RBOD-III

Location
(Attached location map)
Project is located on the right bank of Indus lies between the latitude of
27o-54o & 28o-40o’ and longitude of 67o-39o and 68o-51o Mostly it is spread within the
area of Districts Nasirabad and Jafarabad of Balochistan and District Jacobabad and
Kambar Shahdadkot of Sindh Province.
Scope of Work:
To provide the direly needed effluent disposal
facilities for existing and proposed drainage projects
to reclaim the agricultural land converted in ponds of
water due to lake of disposal of storm water and
Irrigation surplus.
Date of Completion:
30-06-2012

UNDER CONSTRUCTION HYDROPOWER PROJECTS

Allai Khwar Hydropower Project
The Project is located on Allai Khwar River, left bank tributary of Indus River near Besham District Battagram in N.W.F.P. at a distance of 245 Km from Islamabad.Reservoir Dam structure Power intake , Sand Trap, Pressure Tunnel Power House (121 MW) Tailrace & Switchyard
Date of Completion:Feb 2012
allai.jpg


Khan Khwar Hydropower Project
The Project is located on Khan Khwar River, a tributary of Indus River near Besham District Shangla in N.W.F.P. at a distance of 245 Km from Islamabad.
Scope of Work
Reservoir Dam structure Power intake Headrace Tunnel Surge Tank Pressure Shaft/Tunnel Power House (72 MW) Tailrace & Switchyard.
Completed:April 2012
khankhwar.jpg



no hub dam??, u gotta be kidding me



you forgot guddu barrage, sukkur barrage, kotri barrage

Those barages and hub dam are decades old Im posting Projects Which are either underconstruction or have completed in past 5 Years .
 
Duber Khwar Hydropower Project
Location
The Project is located on Khan Khwar River, right bank tributary of Indus River near Pattan District Kohistan in N.W.F.P. at a distance of 265 Km from Islamabad.
Scope of Work
Reservoir Weir structure Power intake , Sand Trap, Headrace Tunnel Surge Tank Pressure Shaft/Tunnel Power House (130 MW) Tailrace & Switchyard.
Date of Completion: DEC 2012

Jinnah Hydropower Project
Location
The Project is located on the right side of existing Jinnah Barrage, 5 km from Kalabagh town in District Mianwali and 234 km from Islamabad.
jinnah.jpg

Scope of Work
Construction of 96 MW Hydropower Project
Date of Completion
First unit completed in December, 2011 and all the 8 units will be completed upto December 2012.

Neelum Jhelum Hydropower Project
Neelum Jhelum Hydroelectric Project is located in the vicinity Muzaffarabad (AJ&K). It envisages the diversion of Neelum river water through a tunnel out -falling into Jhelum river. The intake Neelum Jhelum is at Nauseri 41 Km East of Muzaffarabad. The Powerhouse will be constructed at Chatter Kalas, 22 Km South of Muzaffarabad. After passing through the turbines the water will be released into Jhelum River about 4 Km South of Chatter Kalas. Neelum Jhelum Hydroelectric Project has installed capacity of 969 MW. The Project will produce 5.15 Billion units of electricity annually.
A Composite Dam (Gravity + Rock fill) 160 m long and 60 m high will be constructed on Neelum River at Nausert. It is a Gated Diversion Dam. The dam will create a head pond of 10 million cubic meters which will allow a peaking reservoir of 3.8 million cubic meters to meet daily peaking of power for more than 4 hours. A six gate tunnel intake structure of 280 cumecs capacity will bge3 connected with three conventional flushing surface basins installed at their end for taking sediment back into river.
neelum.bmp

Overall Project Cost
Rs. 274.9 Billion (as per 2nd revised PC-1)

Installed Capacity :969 MW Four Units @ 242.25 MW each
Date of Completion:November 2016
Implementation Period :About 8 years (approx)

Jabban Hydropower Project
Location
Jabban Hydroelectric Power Station project site is located in District Malakand (PATA) Khyber Pakhtunkhwa at a distance of 210 km from Islamabad, 45 km from the city of Mardan and 7 km upstream of 20 MW Dargai Hydroelectric Power Station.
Project Objectives:
a) Rehabilitation of existing Power Station, which includes construction of new Power House Building,
Rehabilitation of Forebay and modification of Intake structure.
b) Installation of 4 new Generating Units each of 5.5 MW, replacement of all E&M equipments and
construction of 132 KV Switchyard.
c) Rehabilitation of Jabban HEPS Project will provide annual generation of 122 GWh, beneficial from econ
omic, social point of view having no environmental impact.
Completion: 31-12-2012
snap1.JPG

snap4.JPG

snap5.JPG
 
SMALL / MEDIUM DAMS

Small & Medium Dam In Pakistan

Bara DAM
LOCATION
The proposed dam is located across Bara River
at the confluence of Mastura River in Khyber
Agency, FATA, Khyber Pakhtunkhwa.
Government of Pakistan intends to develop land and water resources of the country for irrigated agriculture development, hydropower, flood control, socio economic uplift, and emancipation of poor and needy women of the area.
Detailed Engineering Design of the Project is in Progress, to be completed by January, 2012.
Completion: 2016- 17 (Construction Period = 3 Years)

Garuk DAM
Location:
The proposed dam site is located across Garuk River at about 47 Kms South East of Kharan district of Balochistan.
- Conservation of flood water resources for irrigation drinking and
recharge.
- Development of new irrigated agricultural area.
- Hydropower Generation.
garuk.1.gif

Date of Completion: 2016-17 (Construction Period = 3 Years)
Project Cost:
(As Per PC-I/PC-II) Original Approved Rs. 1.790 Billion
Revised (under submission) Rs. 7.921 Billion

Hingol
Location
The Dam Site is located in District Lasbela across Hingol River in Balochistan province at a distance of 232 Kms North West of Karachi and about 16 Kms North of Aghor Bridge across Hingol River on Makran Coastal Highway.
hingol.JPG

-Irrigation of 65,000 acres of Culturable Command Area Hydropower generation of 650 kw.
Date of Completion 2017- 18 (Construction Period = 3 Years)

Naulong
Location
The proposed Naulong Storage Dam Project is located on Mula river at Sunt about 30 Kms from Gandawa City in Tehsil and District Jhal Magsi of Balochistan.
noulong.JPG

-Irrigation of 47,000 acres of Culturable Command Area.
-Hydropower Generation of 4.4 MW.
-Flood Mitigation.
Date of Completion :June 2015 (Construction Period = 3 Years)
Expression of Interest (EOI) for construction supervision of the project invited on June 25, 2012.

Pelar
Location
The proposed dam site is located across Nai River about 30 Km upstream from Korek pelar Village in District Awaran of Balochistan Province.
pelar.JPG

-Storage of flood water
-Development of new irrigated agricultural area.
-Hydropower generation.
Date of Completion 2016-17 (Construction Period = 3 Years)
 
Darwat
Location
It is located near village Jhangri about 20 kms from Super Highway (Lower Kohistan) at about 70 kms West of Hyderabad and 135 kms North East of Karachi across Nai Baran River in Thatta / Jamshoro districts of Sindh Province.
darawat.JPG

darawa1.gif

* Major objective of the Project to conserve flood Water of Nai Baran for Irrigated
Agriculture Development.
* Fisheries development
* Hydropower generation
Date of Completion June 2013

Darban Zem Dam
Location
The dam is located on Khora River near existing Zam Burg Tower, 69 KM South West of D.I Khan, Khyber Pakhtunkhwa Province.
daraban1.JPG

daraban2.JPG

daraban3.JPG

daraban4.JPG

* Irrigated Agriculture Development with High Efficiency Irrigation System.
* Flood Mitigation
* Hydropower Generation
* Drinking Water Supply
Date of Completion: 2017-18 (Construction Period = 3 Years)
 
Ghabir
Location
The dam is located on Ghabir Nullah at a distance of 9 KM from village Danda Shah Bilawal and 60 KM from Talagang, Punjab Province.
gabir.JPG

- To conserve flood water of Ghabir Nullah for Irrigated Agriculture Development.
- Hydropower Generation.
Date of Completion 2017-18 (Construction Period = 3 Years)

Nai gaj
Location
The Nai Gaj Project is envisaged to be located on Gaj River about 0.5 miles west of GAJ Inspection Bunglaw in district Dadu of Sindh Province.
naigaj.JPG

-To conserve flood water of Nai Gaj River for Irrigated Agriculture Development.
-Hydropower Generation.
Date of Completion April 2015 (Construction Period = 3 Years)

Papin
Location
The dam site is located across Wadala Kas a tributary of Soan River at a distance of about 2 Km East of Papin Village, 50 Km South West of Rawat Town in District Rawalpindi of Punjab Province.
papin.JPG

-Irrigation Development
-Flood Mitigation
-Fisheries Development
-Hydropower
Date of Completion 2017-18 (Construction Period = 3 Years)

Winder
Location
The winder dam is proposed across Winder River about 125 Kms from Lasbela city, about 66 Kms from Uthal in Balochistan.
winder.JPG

winder1.gif

102 ft high Earth Core Rock fill Dam will create gross storage of 36,484 AF and this storage will be used to irrigate 10,000 acres of Culturable Command Area alongwith hydropower generation of 300 KW.
Date of Commencement 2014-15 (Tentative)
5. Date of Completion 2017-18 (Construction Period = 3 Years)
 
Tank Zam Dam
LOCATION
Tank Zam Dam Project is proposed across Tank Zam River near Hinis Tangi, at about 30 miles from D.I. Khan in Khyber Pakhtunkhwa Province.
292 ft high Earth & Rock fill Dam will create gross storage of 345,000 AF and this storage will be used to irrigate 35,000 acres of Culturable Command Area with high efficiency irrigation system alongwith hydropower generation of 25.5 MW.
tank1.JPG

tank2.JPG

tank3.JPG

Date of Commencement July 2014-15 (Subject to availability of funds)
5. Date of Completion June 2017-18 (Construction Period =3 Years)

DID A LITTLE HARDWORK TO COLLECT AND POST THIS DATA DONT FORGET TO THANK
 
Tank Zam Dam
LOCATION
Tank Zam Dam Project is proposed across Tank Zam River near Hinis Tangi, at about 30 miles from D.I. Khan in Khyber Pakhtunkhwa Province.
292 ft high Earth & Rock fill Dam will create gross storage of 345,000 AF and this storage will be used to irrigate 35,000 acres of Culturable Command Area with high efficiency irrigation system alongwith hydropower generation of 25.5 MW.
tank1.JPG

tank2.JPG

tank3.JPG

Date of Commencement July 2014-15 (Subject to availability of funds)
5. Date of Completion June 2017-18 (Construction Period =3 Years)

DID A LITTLE HARDWORK TO COLLECT AND POST THIS DATA DONT FORGET TO THANK
VVVVvvvvvvvvvvvvvvery Nice and informative Posts A rafay Thanks keep up the good Work.:cheers:
 
FUTURE PROJECTS

DIAMER BASHA DAM PROJECT
LOCATION
Diamer Basha Dam Project (DBDP) is proposed to be located on the Indus River
315 km (195 miles) upstream of Tarbela Dam site, about 180 km (113 miles) below
the town of Gilgit and about 40 km (24 miles) downstream of Chilas, the district
headquarter of Diamer in Gilgit-Baltistan.
diamir1.JPG

MAIN FEATURES OF DBDP
Main Dam
Maximum Height 272 m
Type Roller Compacted Concrete (RCC)
Diversion System 2 No. Diversion Tunnels (right side)
1 No. Diversion Channel (right side)
Upstream and Downstream Cofferdams
Main Spillway
No. of gates 14
Size of gate 11.5 x 16.24 m
Reservoir
Full Supply Level 1160 masl
Crest Elevation Level 1170 masl
Gross Storage 8.1 MAF (10.0 BCM)
Live Storage 6.4 MAF (7.9 BCM)
Min. operating level 1060 masl
Outlets In Dam Body
Low level 2
Flushing 5
diamir2.JPG

Power House(s) 2
Total Installed Capacity 4500 MW
Location and Type Underground, one each on right and left side
No. of Units 12 each of 375 MW
Average Generation 19208 Gwh/year
(Diamer Basha = 18097 Gwh/year)
(Tarbela = 1111 Gwh/year)
PC-I Cost Rs.894.257 billion (with FEC Rs.312.943 billion)
EIRR 15.3%
FIRR 8.04%
Benefit/Cost Ratio 1.43
MAIN PROJECT IMPLEMENTATION
Implementation / construction activities of main project shall commence in
2012-2013 and completion is envisaged in 2020-2021
diamir3.JPG

diamir4.JPG


KURRAM TANGI DAM MULTIPURPOSE PROJECT
LOCATION OF DAM
The proposed project site is located at Kurram River about 9 miles upstream of Kurram Garhi Head Works and 19 miles North of Bannu City in North Waziristan Agency of Khyber Pakhtunkhwa.
- Hydropower generation of 83.4 MW.
- Flood Control.
- Irrigated agriculture development of 84,380 Acres.
- Dam Height 322 FT.
Construction Period 4 years
Completion 2018

MUNDA DAM PROJECT
LOCATION
This project is proposed to be constructed on Swat River about 5 Km upstream of Munda Head works in Mohmand Agency FATA Khyber Pakhtunkhwa.
- Hydropower generation of 740 MW
- Flood Control
- Irrigated Agriculture development of 15,100 Acres command Area.
Type of Dam Concrete Faced Rock Fill
Height of Dam 700 Ft.
Gross Storage 1.290 MAF
Live Storage 0.676 MAF
Dead Storage 0.314 MAF
Flood Storage 0.081 MFA
Power Capacity 740 MW
Command Area 15,100 Acres
Project Cost (year 2010) US $ 1,401 Million
Detailed Engineering Design Period 2 years (Starting June 2012)
Construction Period 7 Years
Completion 2021

AKHORI DAM
LOCATION
Akhori Dam site is loacted near Akhori Village across Nandna Kas, a small tributary of Haro River in Attock District of Punjab.
Features
Main Dam
Dam Type Earth & Rock Fill
Height 400 feet
Gross Storage 7.6 MAF
Live Storage 6.00 MAF
Saddle Dam
Height 213 feet
Length 4.78
Conveyance Channel
Conveyance Channel Length 23 Miles (37 Km)
Conveyance Channel Capacity 60,000 Cusecs
Bed Width 249.3ft (76 m)
Depth 32..8ft (10 m)
Installed Capacity
Hydel Power Potential 600 MW (2155 GWh/Annum)
Environmental and Resettlement
No of Affectees 55800
No of Houses 9270
Land 65976 Acres
Roads 102 Kms
Estimated cost US$ 4.40 Billion
Construction Period 5 Years
Completion Unknown

HYDROPOWER PROJECTS

GOLEN GOL HYDROPOWER PROJECT
Location
The project is located on Golen Gol Mullah, a tributary of Mastuj River, 25 Km from Chitral Town in KPK.
golen.jpg

To Generate 106 MW Hydel Electricity
DATE OF COMMENCEMENT
February 2011

DATE OF COMPLETION
February 2015

SALIENT FEATURES

Installed Capacity MW 106 MW
Annual Energy GWH 436
Design Discharge 30 m3/sec
Tunnel Length 3.8 KM
Design Head 435 M

DASU HYDROPOWER PROJECT
Location
Dasu hydropower project is a run of river scheme located 7 km upstream of Dasu village on Indus River, 74 km downstream of Diamer Basha Dam and 350 km from Islamabad. The Project is located in district Kohistan of Khyber Pakhtunkhwa.
dasu1.jpg

Objectives/Benefits
To Design a Project of 4320 MW to produce mean annual hydroelectricity of 21300 GWh.
Date of Commencement
April 2010
Date of Completion
March 2019

SALIENT FEATURES
Installed Capacity MW 4320
Mean Annual Energy GWH 21300
Design Discharge m3/Sec 2600
Type of Dam RCC
Gross Head (M) 233
Construction Period (Years) 8
No. & Type of Turbine 8
Project Base Cost US$ 5.28 Billion
 
(A.Rafay) any Info on Bunji Dam and Diamer-Bhasha Dam construction.is the construction still going or stopped.are Chinese still working on Bunji Dam i heard that they have stooped working due to security reason.
 
(A.Rafay) any Info on Bunji Dam and Diamer-Bhasha Dam construction.is the construction still going or stopped.are Chinese still working on Bunji Dam i heard that they have stooped working due to security reason.

BUNJI HYDROPOWER PROJECT
Location
The project is located on Indus River near Gilit. Power House and Dam sites are 560 km & 610 km, respectively from Islamabad.
bunji.jpg

Objectives/Benefits
To Design a 7100 MW Hydropower Project to produce mean annual hydroelectricity of 24088 GWh.
Date of Commencement
May 2007
Date of Completion
August 2010
PRESENT STATUS / PROGRESS

Feasibility report has been submitted by the Consultants on 31 March 2009.
Draft detailed design report and Tender Documents of different lots have been submitted by the Consultants, which are under review by different quarters.
Suspended sediment samples at Gainji Bridge, Kachura Alam Bridge and Bunji Bridge have been collected and analyzed by ISRIP, WAPDA, as recommended by POE Upto September 2011.
Drilling in dam and powerhouse areas at new structure location is in progress by DID, WAPDA, Lahore. Upto date 11614.2m drilling has been completed against 13610.0m. Installation of Piezometers and inclonometers in some of the boreholes at shengua area is in progress.
Model studies for four models: Sectional Model of spillway, Comprehensive Model of Dam Area,, low and Mid Level outlet and Tailrace outlet models have been constructed. All tests proposed by Consultants and POE have been performed and presently no further tests are foreseen.
4 No. Exploratory Adits at dam area have been completed and preparation for performing plate load tests by CMTL WAPDA is in progress.
Exploratory Adit to Fault Zone (Package-2) as recommended by POE would be taken up as advance Package to main construction contract and its cost would be covered in the PC-I.
The work for excavation of Exploratory Adit for under ground Power house (Package-3) has been awarded to M/s High Technology Engineering Company, Islamabad. Contract agreement has been signed on 07.07.2011. Contractor has mobilized on site and excavation work is in progress.
The work for excavation of Exploratory Adit for power shaft (Package-4) has been awarded through retendering process to M/s High Technology Engineering Company, Islamabad. Contract Agreement has been signed on 16.11.2011. Contractor has been mobilized and preliminary works for construction of Adit to surge area is in Progress.
Bunji Consultants (JV) is to complete the design report, preparation of tender documents and PC-I considering the completed and ongoing investigations upto September 30, 2012.

It is still not completed Completion date was August 2010 But It was put on Hold due to delayed reports by companies and lack of intrest from govt.Investigetions are taking place and reports will be presented upto September 30, 2012, Then work will start after arangement of funds.


Construction of Diamer BASHA DAM
The counstruction work is very slow, it depends on funding WAPDA WAS promised RS 20Bn for project in late 2011 but transfer of funds has been the issue, World Bank was also contacted for funding.
 
Bhasha and Bunji dam are needed on an urgent basis.
 
US releases $280m for Mangla, Tangi dam uplift
101206101251371.jpg

ISLAMABAD: In its bid to ease Pakistan’s energy crisis, the US Congress has released $280 million in new US assistance to support Pakistan’s energy sector. The funds will support improvements in the Mangla Dam and infrastructure support and due diligence work on the Kurram Tangi Dam project.
Talking to PPI on Friday, US Embassy Spokesperson Mark Stroh said that the $280 million fund has no link with the Memorandum of Understanding (MoU) recently inked between Pakistan and the US for resumption of Nato supply to US-led International Security Assistance Force (ISAF) stationed in Afghanistan.
He said that it was pre-planned and negotiations have already been afoot since long for the release of the much-needed fund, adding that the US has much concern about the people of Pakistan who are experiencing up to 20-hours power outages daily.
Stroh went on saying that the US was happy over the release of the fund, as it would help in mitigating the woes of the people of Pakistan.
“Relieving Pakistan’s energy crisis is top priority for our civilian assistance program,” he said and added that the US approach consists of high-impact projects aimed at increasing Pakistan’s energy resources and helping power sector institutions more effectively to meet the country’s energy needs.
Ongoing projects supported by the United States include uplift of the Gomal Zam Dam, which will generate 17.4 megawatts of hydroelectric power; the Satpara Dam, which will provide 17.7 megawatts of power to a local grid; the Muzzafargarh Power Station, which will increase the generation capacity of the power station by 475 megawatts; the Jamshoro Power Station project, which will enable the station to restore at least 150 megawatts of power generation capacity; and the Tarbela Dam modernisation project, which will add 128 megawatts in power generation capacity.
 

Latest posts

Back
Top Bottom