What's new

CV-18 Fujian - Type 003 Aircraft Carrier News & Discussions

Another one ...

PLN Type 003 carrier - 20200427 barque at dock no. 4.jpeg
 
. . .
MV Xue Long 2 is a Chinese icebreaking research vessel just enter drydock no.4 for 45 days maintenance, only leave drydock no.4 end of June. so wait August ...
Xue Long 2's maintenance work will be done on various locations in the JNCX yards. It will probably spend 1-2 weeks in the dry dock #4 for below water-line hull works, and will be moved to other locations like inside the harbour basin and at the piers at the river bank.

The submersible deck barge will likely be launched within a few weeks (1-2 weeks?), and will be tested for a short period before commissioning. It will be operational in late May or June.

If this barge is built for transporting CV-XX/003 modules (a very likely case), we will see the aircraft carrier modules in dry dock by mid-Summer.
 
.
Xue Long 2's maintenance work will be done on various locations in the JNCX yards. It will probably spend 1-2 weeks in the dry dock #4 for below water-line hull works, and will be moved to other locations like inside the harbour basin and at the piers at the river bank.

The submersible deck barge will likely be launched within a few weeks (1-2 weeks?), and will be tested for a short period before commissioning. It will be operational in late May or June.

If this barge is built for transporting CV-XX/003 modules (very likely case), we will see the aircraft carrier modules in dry dock by mid-Summer.

let wait and see..:cheers:
 
. . . . . . .
China needs 4 heavy carriers in service by 2025.

And well ... yet another completely stupid post! As stupid and impossible like Tu-160s in the IAF and the H-20 in the PAF.

Do you ever think before you post?

Given the current state of construction, the 003 carrier is about there where 002 was about 18 months before launch and that given that 002 was a much simpler and less complex project.

As such, if transfer of the modules will start only in September it will last at best until March 2022 for completion and after that the trial need to commence ...

anyway for operational ready super-carriers until 2025 is nothing but a fan-boy's wet-dream. :hitwall::crazy:
 
Last edited:
. . . .

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom